Display Kept in this browser only
Finance DocketBefore the Surface Transportation Board

FD 35095

ALASKA RAILROAD CORPORATION – CONSTRUCTION AND OPERATION EXEMPTION--A RAIL LINE EXTENSION TO PORT MACKENZIE, ALASKA

Caption from the Board’s record.

10 filings, 6 decisions and 666 environmental comments observed here; last checked 10 Oct 2026, 21:36 UTC; last new entry 31 Aug 2026, 20:44 UTC.

Entries

By type (3)
Newest first · oldest first
  1. Comment
    EI-34147Brian Lindamood
    Monitoring Report 11/2024 to 10/2025
    Ankorage, AK
  2. Comment
    EI-33647Alaska Railroad Corporation
    Annual status report.
    Brian Lindamood, Project Manager · Anchorage, AK
  3. Comment
    EI-33149Alaska Railroad Corporation
    Annual Status Report
    Brian Lindamood · Anchorage, AK
  4. Comment
    EO-3722Venable PLLC for Port MacKenzie Railroad
    Kathryn Floyd
  5. Comment
    EI-32618Venable, LLP
    Kathryn Floyd · Washington, DC
  6. Comment
    EI-32125Alaska Railroad Corp.
    Quarterly Report
    Brian Lindamood · Anchorage, AK
  7. Comment
    EO-3692Alaska Railroad Corporation
    Brian Lindamood
  8. Comment
    EI-32036Alaska Railroad Corporation
    Brian Lindamood · Anchorage, AK
  9. Comment
    EO-3683Alaska Railroad Corporation
    Brian Lindamood
  10. Comment
    EI-31971Alaska Railroad Corporation
    Brian Lindamood · Anchorage, AK
  11. Comment
    EO-3682Alaska Railroad Corporation
    Brian Lindamood
  12. Comment
    EI-31969Alaska Railroad Corporation
    Brian Lindamood · Anchorage, AK
  13. Comment
    EO-3681Alaska Railroad Corporation
    Brian Lindamood
  14. Comment
    EI-31968Alaska Railroad Corporation
    Brian Lindamood · Anchorage, AK
  15. Comment
    EO-3680Alaska Railroad Corporation
    Brian Lindamood
  16. Comment
    EI-31967Alaska Railroad Corporation
    Brian Lindamood · Anchorage, AK
  17. Comment
    EO-3502Alaska Railroad Corporation
    Brian Lindamood
  18. Comment
    EI-30054Alaska Railroad Corporation
    Brian Lindamood · Anchorage, AK
  19. Comment
    EO-3307Alaska Railroad Corporation
    Brian Lindamood
  20. Comment
    EI-27018Alaska Railroad Corporation
    Brian Lindamood
  21. Comment
    EI-26972Alaska Railroad Corporation
    Brian Lindamood
  22. Comment
    EI-26971Alaska Railroad Corporation
    Brian Lindamood
  23. Comment
    EO-3283Alaska Railroad Corporation
    Brian Lindamood
  24. Comment
    EI-26970Alaska Railroad Corporation
    Brian Lindamood
  25. Comment
    EO-3184Alaska Railroad Corporation
    Brian Lindamood
  26. Comment
    EI-26739Alaska Railroad Corporation
    Brian Lindamood
  27. Comment
    EO-3108Alaska Railroad Corporation
    Brian Lindamood
  28. Comment
    EI-26542Alaska Railroad Corporation
    Brian Lindamood
  29. Comment
    EI-26541Alaska Railroad Corporation
    Brian Lindamood
  30. Comment
    EO-3105Alaska Railroad Corporation
    Brian Lindamood
  31. Comment
    EI-26540Alaska Railroad Corporation
    Brian Lindamood
  32. Comment
    EO-3104Alaska Railroad Corporation
    Brian Lindamood
  33. Comment
    EI-26539Alaska Railroad Corporation
    Brian Lindamood
  34. Comment
    EO-3103Alaska Railroad Corporation
    Brian Lindamood
  35. Comment
    EI-26538Alaska Railroad Corporation
    Brian Lindamood
  36. Comment
    EO-3022Alaska Railroad Corporation
    Brian Lindamood
  37. Comment
    EI-26351Alaska Railroad Corporation
    Brian Lindamood
  38. Comment
    EO-2999Venable LLP
    Kathryn Kusske Floyd
  39. Comment
    EI-26308Alaska Railroad Corporation
    Brian Lindamood
  40. Comment
    EI-26307Alaska Railroad Corporation
    Brian Lindamood
  41. Comment
    EO-2958Venable LLP
    Kathryn Kusske Floyd
  42. Comment
    EI-26241Alaska Railroad Corporation
    Brian Lindamood
  43. Comment
    EO-3102Venable LLP
    Kathryn Kusske Floyd
  44. Comment
    EI-26537Alaska Railroad Corporation
    Brian Lindamood
  45. Comment
    EO-3101Venable LLP
    Kathyrn Kusske FLoyd
  46. Comment
    EI-26536Alaska Railroad Corporation
    Brian Lindamood
  47. Comment
    EO-2894Venable
    Kathryn Kusske Floyd
  48. Comment
    EI-25847Alaska Railroad Corporation
    Brian Lindamood
  49. Comment
    EI-25846Alaska Railroad Corporation
    Brian Lindamood
  50. Comment
    EO-2893Alaska Railroad Corporation
    Brian Lindamood
  51. Comment
    EI-25845Alaska Railroad Corporation
    Brian Lindamood
  52. Comment
    EO-3100Venable LLP
    Kathyrn Kusske Floyd
  53. Comment
    EI-26535Alaska Railroad Corporation
    Brian Lindamood
  54. Comment
    EO-2700Venable LLP
    Kathryn Kusske Floyd
  55. Comment
    EI-21231Alaska Railroad Corporation
    Brian Lindamood
  56. Comment
    EO-2648Venable LLP
    Kathryn Kusske Floyd
  57. Comment
    EI-21033Alaska Railroad Corporation
    Brian Lindamood
  58. Comment
    EO-2555Venable LLP
    Kathryn Kusske Floyd
  59. Comment
    EI-20974Alaska Railroad Corporation
    Brian Lindamood
  60. Comment
    EO-2518Venable LLP
    Kathryn Kusske Floyd
  61. Comment
    EI-20962ARRC
    Brian Lindamood
  62. Comment
    EI-20927HDR
    Elizabeth Grover
  63. Comment
    EI-20945Alaska Railroad Corporation
    Brian Lindamood
  64. Comment
    EI-20727AK SHPO
    Judith Bittner
  65. Comment
    EO-2692Venable LLP
    Kathryn Kusske Floyd
  66. Comment
    EI-20685ARRC
    Barbara Hotchkin
  67. Comment
    EI-20718Alaska Railroad Corporation
    Brian Lindamood
  68. Comment
    EI-20545Alaska Railroad Corporation
    Brian Lindamood
  69. Comment
    EO-3099Venable LLP
    Kathyrn Kusske Floyd
  70. Comment
    EI-26534Alaska Railroad Corporation
    Brian Lindamood
  71. Comment
    EO-2271Venable LLP
    Kathryn Kusske Floyd
  72. Comment
    EI-20458Alask Railroad Corporation
    Brian Lindamood
  73. Comment
    EO-2242Venable LLP
    Kathryn Kusske Floyd
  74. Comment
    EI-20403Alaska Railroad Corporation
    Brian Lindamood
  75. Comment
    EI-20385Alaska SHPO
    Judith Bittner
  76. Comment
    EI-20384Alaska SHPO
    Judith Bittner
  77. Comment
    EO-2222Alaska SHPO
    Judith Bittner
  78. Comment
    EO-2213Venable LLP
    Kathryn Kusske Floyd
  79. Comment
    EI-20365Alaska Railroad Corporation
    Barbara Hotchkin
  80. Comment
    EI-20353Alaska SHPO
    Judith Bittner
  81. Comment
    EI-20352Alaska Railroad Corporation
    Barbara Hotchkin
  82. Comment
    EI-20364Alaska Railroad Corporation
    Brian Lindamood
  83. Comment
    EO-2183AK SHPO
    Judith Bittner
  84. Comment
    EO-2174Alaska Railroad Corporation
    Barbara Hotchkin
  85. Comment
    EO-3098Venable LLP
    Kathryn Kusske Floyd
  86. Comment
    EI-20278Alaska Railroad Corporation
    Brian Lindamood
  87. Comment
    EI-20261Alaska Railroad Corporation
    Barbara Hotchkin
  88. Comment
    EI-20253Alaska Railroad Corporation
    Barbara Hotchkin
  89. Comment
    EO-3097Venable LLP
    Kathryn Kusske Floyd
  90. Comment
    EI-20186Alaska Railroad Corporation
    Brian Lindamood
  91. Comment
    EI-20135Venable LLP
    Jay Johnson
  92. Comment
    EO-2039Venable LLP
    Kathryn Kusske Floyd
  93. Comment
    EI-20114Alaska Railroad Corporation
    Brian Lindamood
  94. Comment
    EO-2007Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  95. Comment
    EI-19159Alaska SHPO
    Judith Bittner
  96. Comment
    EO-1993Alaska SHPO
    Judith Bittner
  97. Comment
    EI-19077Alaska SHPO
    Judith Bittner
  98. Comment
    EI-19107HDR, Alaska Railroad Company
    Elizabeth Grover
  99. Comment
    EI-19119Alaska Railroad Company
    Barbara Hothkin
  100. Comment
    EI-18981Alaska Railroad Corporation
    Brian Lindamood
  101. Comment
    EO-1962Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  102. Comment
    EI-18962AK SHPO
    Judith Bittner
  103. Comment
    EO-1950SHPO
    Judith Bittner
  104. Comment
    EI-18952Alaska Railroad Corporation
    Brian Lindamood
  105. Comment
    EI-18951Alaska State Historic Preservation Office
    Shina Duvall
  106. Comment
    EO-1940HDR Alaska
    Elizabeth Grover
  107. Comment
    EO-1937AK SHPO
    Sina Duvall
  108. Comment
    EO-1935Alaska Railroad Corporation
    Barbara Hotchkin
  109. Comment
    EI-18944Alaska Railroad Corporation
    Brian Lindamood
  110. Comment
    EI-18943Alaska Railroad Corporation
    Brian Lindamood
  111. Comment
    EI-18949HDR, Alaska
    Elizabeth Grover
  112. Comment
    EI-18945HDR
    Elizabeth Grover
  113. Comment
    EI-18948Alaska Railroad Corporation
    Brian Lindamood
  114. Comment
    EI-18917Alaska Railroad Company
    Barbara Hotchkin
  115. Comment
    EO-1902Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  116. Comment
    EI-18890US Fish and Wildlife Service
    Maureen de Zeeuw
  117. Comment
    EI-18889Dorsey & Whitney, LLP
    Jay Johnson
  118. Comment
    EO-1893Dorsey & Whitney, LLP
    Kathryn Floyd, Jay Johnson
  119. Comment
    EI-18888Alaska Railroad Corporation
    Brian Lindamood
  120. Comment
    EI-18887Alaska Railroad Corporation
    Brian Lindamood
  121. Comment
    EI-18886Alaska Railroad Corporation
    Brian Lindamood
  122. Comment
    EI-18885US Fish and Wildlife Service
    Maureen de Zeeuw
  123. Comment
    EI-18884Alaska Railroad Corporation
    Brian Lindamood
  124. Comment
    EI-18883US Fish and Wildlife Service
    Maureen de Zeeuw
  125. Comment
    EI-18881Alaska Railroad Corporation
    Barbara Hotchkin
  126. Comment
    EO-1887Alaska Railroad Corporation
    Barbara Hotchkin
  127. Comment
    EI-18873U.S. Coast Guard
    James Helfinstine
  128. Comment
    EI-18891Alaska Department of Natural Resources
    Lesli Schick
  129. Comment
    EO-1883Alaska Railroad Corporation
    Barbara Hotchkin
  130. Comment
    EI-18869Alaska Railroad Corporation
    Barbara Hotchkin
  131. Comment
    EI-18867Alaska State Historic Preservation Office
    Judith Bittner
  132. Comment
    EO-1882Alaska Railroad Corporation
    Barbara Hotchkin
  133. Comment
    EO-1874Alaska Railroad Corporation
    Barbara Hotchkin
  134. Comment
    EO-1872Alaska Railroad Corporation
    Barbara Hotchkin
  135. Comment
    EO-1867Dorsey & Whitney LLP
    Jay Johnson
  136. Comment
    EI-18846HDR, Inc.
    Elizabeth Grover
  137. Comment
    EI-18845Alaska Railroad Corporation
    Barbara Hotchkin
  138. Comment
    EI-18844Alaska Railroad Corporation
    Brian Lindamood
  139. Comment
    EI-18834Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  140. Comment
    EI-18832Alaska Railroad Corporation
    Barbara Hotchkin
  141. Comment
    EI-18829Alaska Railroad Corporation
    Brian Lindamood
  142. Comment
    EO-1863Alaska Railroad Corporation
    Brian Lindamood
  143. Comment
    EO-1861Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  144. Comment
    EI-18828Alaska Railroad Corporation
    Brian Lindamood
  145. Comment
    EI-18827Alaska Railroad Corporation
    Brian Lindamood
  146. Comment
    EI-18826Alaska Railroad Corporation
    Brian Lindamood
  147. Comment
    EI-18822Alaska Railroad Corporation
    Brian Lindamood
  148. Comment
    EO-1865HDR, Inc.
    Elizabeth Grover
  149. Comment
    EO-1855Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  150. Comment
    EI-18831Alaska State Historic Preservation Office
    Shina Duvall
  151. Comment
    EI-18818Dorsey & Whitney LLP
    Jay Johnson
  152. Comment
    EO-1864Alaska Railroad Corporation
    Barbara Hotchkin
  153. Comment
    EI-18830Alaska State Historic Preservation Office
    Shina Duvall
  154. Comment
    EO-1862Alaska Railroad Corporation
    Barbara Hotchkin
  155. Comment
    EI-18824Alaska Railroad Corporation
    Barbara Hotchkin
  156. Comment
    EI-18823Alaska State Historic Preservation Office
    Shina Duvall
  157. Comment
    EO-1860Alaska State Historic Preservation Office
    Shina Duvall
  158. Comment
    EI-18821Alaska State Historic Preservation Office
    Shina Duvall
  159. Comment
    EI-18811Alaska Railraod Corporation
    Brian Lindamood
  160. Comment
    EI-18820Alaska State Historic Preservation Office
    Shina Duvall
  161. Comment
    EI-18810Alaska Railroad Corporation
    Barbara Hotchkin
  162. Comment
    EO-1859Alaska Railroad Corporation
    Barbara Hotchkin
  163. Comment
    EO-1850Alaska Railroad Corporation
    Barbara Hotchkin
  164. Comment
    EO-1849Alaska Railroad Corporation
    Barbara Hotchkin
  165. Comment
    EO-1845Alaska State Historic Preservation Office
    Judith Bittner and Shina Duvall
  166. Comment
    EI-18809Alaska Railroad Corporation
    Barbara Hotchkin
  167. Comment
    EO-1847Alaska Railroad Corporation
    Barbara Hotchkin
  168. Comment
    EO-1844Dorsey & Whitney LLP
    Jay Johnson
  169. Comment
    EI-18793Alaska Railroad Corporation
    Brian Lindamood
  170. Comment
    EI-18797Dorsey & Whitney LLP
    Jay Johnson
  171. Decision
    42186Director Of Proceedings
    PROVIDED NOTICE THAT COURT ACTION WAS INSTITUTED IN THIS PROCEEDING.
  172. Comment
    EO-1840Alaska Railroad Corporation
    Barbara Hotchkin
  173. Comment
    EI-18777Alaska State Historic Preservation Office
    Judith Bittner
  174. Comment
    EI-18802Alaska Railroad Corporation
    Barbara Hotchkin
  175. Comment
    EI-18772Alaska Railroad Corporation
    Barbara Hotchkin
  176. Comment
    EI-18796Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  177. Comment
    EO-1813Office of the Governor
    Randy Ruaro
  178. Comment
    EI-18795Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  179. Comment
    EI-18763Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  180. Comment
    EI-18762HDR Alaska, Inc.
    Elizabeth Grover
  181. Decision
    41518Entire Board
    DECISION GRANTED AN EXEMPTION FOR ALASKA RAILROAD CORPORATION (AARC) TO CONSTRUCT AND OPERATE APPROXIMATELY 35 MILES OF NEW RAIL LINE CONNECTING THE PORT OF MACKENZIE DISTRICT IN SOUTH-CENTRAL ALASKA TO A POINT ON ARRC'S EXISTING MAIN LINE NEAR HOUSTON, ALASKA. THE EXEMPTION IS SUBJECT TO ENVIRONMENTAL MITIGATION CONDITIONS.
  182. Comment
    EO-1801Alaska Department of Natural Resources
    Jeff Bruno
  183. Comment
    EO-1800Dorsey & Whitney
    Kathryn Kusske Floyd
  184. Comment
    EO-1788Alaska Railroad Corporation
    Barbara Hotchkin
  185. Comment
    EI-18725Alaska State Historic Preservation Office
    Shina Duvall
  186. Comment
    EI-18722Alaska State Historic Preservation Office
    Shina duVall
  187. Comment
    EO-1799STB Board Members
  188. Comment
    EI-18692Alaska State Historic Preservation Office
    Doug Gasek
  189. Comment
    EI-18691Alaska Railroad Corporation
    Brian Lindamood
  190. Comment
    EO-1745Alaska State Historic Preservation Office
    Judy Bittner
  191. Comment
    EI-18801Alaska Railroad Corporation
    Barbara Hotchkin
  192. Motion
    230740Motion/Petition/Request
    Alaska Railroad Corporation
  193. Comment
    EI-18689Knikatnu, Inc.
    Kim Morris
  194. Comment
    EI-18648U.S. Fish and Wildlife Service - Anchorage Field Office
    Ann Rappoport
  195. Environmental
    230612Environmental Materials
    Alaska Public Interest Research Group
  196. Comment
    EI-21189Sierra Club
    Final attachments and certificate of service.
    Jessica Yarnall · San Francisco, CA
  197. Comment
    EI-21188Sierra Club
    2nd of 3 submissions with remaining exhibits.
    Jessica Yarnall · San Francisco, CA
  198. Comment
    EI-21187Sierra Club
    I will submit another form with the remaining attachments (there were only 4 fields here).
    Jessica Yarnall · San Francisco, CA
  199. Comment
    EI-18690Eklutna, Inc.
    Jim Arnesen
  200. Comments
    230516Environmental Comment
    Honorable Mark Begich
  201. Comment
    EI-18635Knikatnu, Inc.
    Raymond Theodore
  202. Comment
    EO-1726Eklutna, Inc.
    Marc Lamoreaux
  203. Comment
    EO-1725Concurring Parties to the Section 106 PA
  204. Comment
    EI-18634Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  205. Comment
    EI-18633Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  206. Comment
    EO-1724Signatories & Invited Sign. to Section 106 PA
  207. Comment
    EI-18632Advisory Council on Historic Preservation
    Charlene Dwin Vaughn
  208. Comment
    EI-18623Alaska PIRG
    Steve Cleary
  209. Comment
    EO-1718Dorsey & Whitney LLP
    Jay Johnson
  210. Comment
    EO-1717Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  211. Comment
    EO-1716Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  212. Comments
    229898Environmental Comment
    Sierra Club
  213. Comment
    EI-18622Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  214. Comment
    EI-18621Alaska State Historic Preservation Office
    Doug Gasek
  215. Comment
    EI-18620Alaska State Historic Preservation Office
    Doug Gasek
  216. Comment
    EI-18619Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  217. Comment
    EI-18618Alaska State Historic Preservation Office
    Judith Bittner
  218. Comment
    EO-1715Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  219. Comment
    EO-1714Alaska State Historic Preservation Office
    Judy Bittner and Doug Gasek
  220. Comment
    EI-21186Sierra Club
    Nathaniel Shoaff · San Francisco, CA
  221. Comment
    EI-18617Knik Tribal Council
    Richard Porter
  222. Comment
    EI-18615Self/Individual
    Colleen Bostwick
  223. Comment
    EI-18616Matanuska-Susitna Borough
    Carol Varderman
  224. Comment
    EO-1713Signatories & Invited Sign. to Section 106 PA
  225. Comment
    EI-18626Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  226. Comment
    EI-18614Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  227. Comment
    EI-18613Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  228. Comment
    EO-1712Dorsey & Whitney LLP
    Kathryn Kusske Floyd and Jay Johnson
  229. Comment
    EI-18612Alaska State Historic Preservation Office
    Judy Bittner
  230. Comment
    EI-18611Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  231. Comment
    EO-1711ACHP, Alaska SHPO, Alaska Railroad Corporation
    Charlene Vaughn, Judy Bittner, Kathryn Kusske
  232. Comment
    EO-1710Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  233. Comment
    EI-18610Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  234. Comment
    EI-18609Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  235. Comments
    229491Environmental Comment
    State Of Alaska
  236. Comment
    EI-18608Alaska State Historic Preservation Office
    Judy Bittner
  237. Comment
    EI-18555Robert Shumaker
  238. Comment
    EO-1709ACHP and Alaska SHPO
    Charlene Vaughn and Judy Bittner
  239. Motion
    229466Motion/Petition/Request
    Alaska Railroad Corporation
  240. Comment
    EI-18607Dorsey & Whitney LLP
    Jay Johnson
  241. Comment
    EI-18606Dorsey & Whitney LLP
    Jay Johnson
  242. Comment
    EO-1708Alaska Railroad Corporation
    Stephenie Wheeler
  243. Comment
    EI-18605Alaska Railroad Corporation
    Stephenie Wheeler
  244. Comment
    EO-1707Alaska Railroad Corporation
    Stephenie Wheeler
  245. Comment
    EO-1706Alaska Railroad Corporation
    Stephenie Wheeler
  246. Comments
    229490Environmental Comment
    U S Environmental Protection Agency (Region 10)
  247. Comment
    EI-18604Alaska State Historic Preservation Office
    Judith Bittner
  248. Motion
    229409Motion/Petition/Request
    Alaska Railroad Corporation
  249. Comment
    EI-18547Audrey Faulkner
    Please let me know if you cannot open the enclosed attachment. A hard copy was mailed yesterday, which included attachments.
    anchorage, ak
  250. Comment
    EO-1705Alaska State Historic Preservation Office
    Judy Bittner
  251. Comment
    EI-18545Stephen M. Sims
  252. Comment
    EI-18544Todd Hecker
    Wasilla, Alaska
  253. Comment
    EI-18553Patrick Sharrock
  254. Comment
    EI-18603Matanuska-Susitna Borough
    Fran Seager-Boss
  255. Comment
    EO-1704Signatories & Invited Sign. to Section 106 PA
  256. Comment
    EO-1703Self / Individual
    Lynn Gattis
  257. Comment
    EI-18602Advisory Council on Historic Preservation
    Charlene Vaughn
  258. Comment
    EO-1702ACHP, Alaska Railroad Corporation
  259. Comment
    EO-1701Alaska SHPO, ACHP, Alaska Railroad
  260. Comment
    EO-1700Alaska SHPO and ACHP
  261. Comment
    EO-1699Alaska SHPO and ACHP
  262. Comment
    EI-18805Alaska Railroad Corporation
    Brian Lindamood
  263. Comment
    EI-18601Alaska State Historic Preservation Office
    Judy Bittner
  264. Comment
    EI-18600Dorsey & Whitney LLP
    Jay Johnson
  265. Comment
    EI-18599Advisory Council on Historic Preservation
    Charlene Vaughn
  266. Comment
    EO-1698Alaska SHPO, ACHP, Alaska Railroad
  267. Comment
    EO-1697Knik Tribal Council
    Richard Porter
  268. Comment
    EI-18598Alaska Railroad Corporation
    Barbara Hotchkin
  269. Comment
    EO-1696Knik Tribal Council
    Richard Porter
  270. Comment
    EI-18597Advisory Council on Historic Preservation
    Charlene Vaughn
  271. Comment
    EO-1695U.S. Environmental Protection Agency
    USEPA, Office of Federal Activities, EIS Filing Section
  272. Comment
    EI-18804Knik Tribal Council
    Richard Porter
  273. Comment
    EI-18596Alaska State Historic Preservation Office
    Doug Gasek
  274. Comment
    EO-1694Alaska SHPO and ACHP
  275. Comment
    EO-1693Alaska State Historic Preservation Office
    Doug Gasek
  276. Comment
    EO-1692Parties to the Section 106 Programmatic Agreement
  277. Comment
    EI-18806Advisory Council on Historic Preservation
    Charlene Dwin Vaughn
  278. Comment
    EI-18595Alaska State Historic Preservation Office
    Doug Gasek
  279. Comment
    EI-18594CIRI, Inc.
    Kim Cunningham
  280. Comment
    EO-1691Alaska State Historic Preservation Office
    Doug Gasek
  281. Comment
    EI-18593Alaska Railroad Corporation
    Brian Lindamood
  282. Comment
    EO-1689Self / Individual
    Gary Thompson
  283. Comment
    EO-1690Parties to the Section 106 Programmatic Agreement
  284. Comment
    EO-1688Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  285. Comment
    EI-18592Tyonek Native Corporation
    John McClellan
  286. Comment
    EO-1687Parties to the Section 106 Programmatic Agreement
  287. Comment
    EI-18591Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  288. Comment
    EI-18590Advisory Council on Historic Preservation
    Charlene Vaughn
  289. Comment
    EO-1686Advisory Council on Historic Preservation
    Charlene Vaughn
  290. Comment
    EO-1596Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  291. Comment
    EI-18589Alaska State Historic Preservatrion Office
    Tracie Krauthoefer
  292. Comment
    EI-18464Alaska State Historic Preservation Office
    Tracie Krauthoefer
  293. Comment
    EO-1685Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  294. Comment
    EO-1597Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  295. Comment
    EO-1684Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  296. Comment
    EO-1683Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  297. Comment
    EO-1682Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  298. Comment
    EO-1595Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  299. Comment
    EO-1594Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  300. Comment
    EO-1593Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  301. Comment
    EO-1681Alaska State Historic Preservation Office
    Tracie Krauthoefer
  302. Comment
    EO-1598Alaska State Historic Preservation Office
    Tracie Krauthoefer
  303. Comment
    EI-18588USACE - Alaska District
    Benjamin Soiseth
  304. Comment
    EO-1680Alaska State Historic Preservation Office
    Tracie Krauthoefer
  305. Comment
    EO-1679Alaska State Historic Preservation Office
    Tracie Krauthoefer
  306. Comment
    EO-1591Alaska State Historic Preservation Office
    Tracie Krauthoefer
  307. Comment
    EI-18587Alaska State Historic Preservation Office
    Tracie Krauthoefer
  308. Comment
    EI-18462Alaska State Historic Preservation Office
    Tracie Krauthoefer
  309. Comment
    EO-1678Alaska State Historic Preservation Office
    Tracie Krauthoefer
  310. Comment
    EO-1590Alaska State Historic Preservation Office
    Tracie Krauthoefer
  311. Comment
    EI-18586Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  312. Comment
    EO-1677Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  313. Comment
    EI-18585USEPA - Region 10
    Jennifer Curtis
  314. Comment
    EO-1676USEPA - Region 10
    Jennifer Curtis
  315. Comment
    EO-1675USEAP - Region 10
    Jennifer Curtis
  316. Comment
    EO-1674Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  317. Comment
    EO-1589Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  318. Comment
    EI-18584Alaska Department of Natural Resources
    Don Perrin
  319. Comment
    EI-18583USEPA - Region 10
    Jennifer Curtis
  320. Comment
    EO-1673Alaska Department of Natural Resources
    Erik Johnson
  321. Comment
    EO-1672Gary Thompson
  322. Comment
    EO-1671USEPA - Region 10
    Jennifer Curtis
  323. Comment
    EI-18582Gary Thompson
  324. Comment
    EO-1670Alaska Department of Natural Resources
    Don Perrin
  325. Comment
    EO-1664ACHP and Alaska SHPO
    Najah Duvall-Gabriel and Tracie Krauthoefer
  326. Comment
    EO-1588Alaska State Historic Preservation Office
    Tracie Krauthoefer
  327. Comment
    EO-1663Gary Thompson
  328. Comment
    EI-18579Alaska State Historic Preservation Office
    Tracie Krauthoefer
  329. Comment
    EI-18461Alaska State Historic Preservation Office
    Tracie Krauthoefer
  330. Comment
    EI-18577Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  331. Comment
    EI-18460Advisory Council on Historic Preservation
    Najh Duvall-Gabriel
  332. Comment
    EO-1586Alaska State Historic Preservation Office
    Tracie Krauthoefer
  333. Comment
    EI-18576Native Village of Eklutna
    Marc Lemoreaux
  334. Comment
    EI-18459Native Village of Eklutna
    Marc Lamoreaux
  335. Comment
    EO-1660ACHP and Alaska AHPO
    Najah Duvall-Gabriel and Tracie Krauthoefer
  336. Comment
    EO-1585Alaska State Historic Preservation Office
    Tracie Krauthoefer
  337. Comment
    EI-18578Native Village of Eklutna
    Marc Lamoreaux
  338. Comment
    EO-1662Knik Tribal Council
    Richard Porter
  339. Comment
    EO-1659Knik Tribal Council
    Debra Call and Richard Porter
  340. Comment
    EO-1587Knik Tribal Council
    Debra Call
  341. Comment
    EI-18458Martin Buser
  342. Comment
    EO-1658Happy Trails Kennels
    Martin Buser
  343. Comment
    EO-1657Various
    Potential Parties to the Programmatic Agreement
  344. Comment
    EO-1656Alaska State Historic Preservation Office
    Tracie Krauthoefer
  345. Comment
    EO-1655Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  346. Comment
    EO-1654Alaska State Historic Preservation Office
    Alaska SHPO Staff
  347. Comment
    EI-18575Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  348. Comment
    EI-18574Alaska State Historic Preservation Office
    Tracie Krauthoefer
  349. Comment
    EO-1653Advisory Council on Historic Preservation
    Najah Duvall-Gabriel
  350. Comment
    EO-1652Alaska State Historic Preservation Office
    Tracie Krauthoefer
  351. Comment
    EO-1651Alaska State Historic Preservation Office
    Alaska SHPO and Staff
  352. Comment
    EO-1650Advisory Council on Historic Preservation
    Najah Duvall-Gabreil
  353. Comment
    EI-18336Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  354. Comment
    EI-18573Office of Governor Sean Parnell
    Randall Ruaro
  355. Comment
    EO-1649Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  356. Comment
    EO-1523Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  357. Comment
    EI-18571Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  358. Comment
    EI-18330Alaska State Historic Preservation Office
    Judith Bittner
  359. Comment
    EO-1522Alaska Department of Fish and Game
    Maria Shepard
  360. Comment
    EO-1648Office of Governor Sean Parnell
    Randall Ruaro
  361. Comment
    EI-18570Office of Governor Sean Parnell
    Randall Ruaro
  362. Comment
    EO-1647Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  363. Comment
    EO-1646Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  364. Comment
    EO-1497Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  365. Comment
    EI-18274Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  366. Comment
    EI-18273Advisory Council on Historic Preservation
    John Fowler
  367. Comment
    EI-18252Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  368. Comment
    EI-18569Alaska Railroad Corporation
    Brian Lindamood
  369. Comment
    EO-1645Dorsey & Whitney LLP
    Jay Johnson
  370. Comment
    EI-18250Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  371. Comment
    EO-1485Advisory Council on Historic Preservation
    Charlene Dwin Vaughn
  372. Comment
    EO-1484Alaska State Historic Preservation Officer
    Judith Bittner
  373. Comment
    EO-1482Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  374. Comment
    EO-1483Alaska State Historic Preservation Officer
    Judith Bittner
  375. Comment
    EO-1644Lynn Gattis
  376. Comment
    EI-18568Lynn Gattis
  377. Comment
    EI-18567Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  378. Comment
    EI-18251Matanuska-Susitna Borough
    John Duffy
  379. Comment
    EI-18566Patrick Sharrock
  380. Comment
    EO-1643Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  381. Comment
    EI-18222Knik-Fairview Community Council
    B.H. Tilton
  382. Comment
    EO-1466Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  383. Comment
    EI-18211Dorsey & Whitney
    See attachments. Hard copies will follow by mail.
    Kathryn Kusske Floyd · Washington, DC
  384. Comment
    EI-18215U.S. Army Corps of Engineers
    Benjamin Soiseth
  385. Comment
    EI-18192Willow Chamber of Commerce
    Jim Huston
  386. Comment
    EI-18189Daniel E. Smith
  387. Comment
    EI-18188Rebecca Painter
  388. Comment
    EI-18187U.S. Department of Interior, Office of Env. Policy & Compliance
    Willie Taylor
  389. Comment
    EI-18186Deshka Landing Outdoor Association, LLC
    Joseph Wright
  390. Comment
    EI-18185Robert Shafer
  391. Comment
    EI-18184Garvan Bucaria
  392. Comment
    EI-18183Lance Baskin
    Wasilla, Alaska
  393. Comment
    EI-18182Robert Gilliland
  394. Comment
    EI-18181Tina Dobson
  395. Comment
    EI-18179Joe and Pat Wilson
  396. Comment
    EI-18178Gary D. Thompson
  397. Comment
    EI-18177Patrick L. Sharrock
  398. Comments
    227052Comment
    Daniel B. Robertson
  399. Comment
    EI-18160U.S. Environmental Protection Agency, Region 10
    Richard Parkin
  400. Comment
    EI-18159National Marine Fisheries Service, Alaska Region
    James W. Balsinger
  401. Comment
    EI-18158Mike Whedbee
  402. Comment
    EI-18157Grace Whedbee
  403. Comment
    EI-18156Mike Whedbee
  404. Comment
    EI-18172Fred Hirschmann
    TO: Surface Transportation Board RE: STB Finance Docket No. 35095 SUBJECT: Environmental Comment by Fred Hirschmann David Navecky Surface Transportation Board 395 E Street, SW Washington, DC 20423-0001 Attention: STB Finance Docket No. 35095 Dear Mr. Navecky, I would like to go on record as being opposed to all rail routes leading from the existing Alaska Railroad line to Point MacKenzie and the deepwater port the Matanuska-Susitna Borough has been trying to develop. If a route must be selected, then the longest Willow Route follows high ground with the least disruption to recreation areas, residential areas and sensitive wetlands. The route that the borough seems to prefer, the Houston Route, crosses myriad wetlands that will require an inordinate amount of fill. A good share of that route, especially in the vicinity of the lakes south of Houston and around Papoose Lakes and Crooked Lake, are open marshy fens, basically quaking bogs where wetland vegetation covers former glacial kettle lakes. It’s inconceivable to me that a railroad grade could or should be built through such a non-weight bearing environment. Winter frost heaving coupled with wetland subsidence of the railroad bed will make train derailment a distinct possibility. Wetlands are the worse location for a major fuel spill. We will see that problem firsthand over the weeks to come in Louisiana. Millions of dollars are being sunk into the Port at Point MacKenzie with virtually no economic return to the taxpayers of the Matanuska-Susitna Borough or federal taxpayers. A ship or two a year has used the facility. The Borough cites the development of perhaps hundreds of mines and logging most of our boreal forest to supply a steady stream of railroad cars. Past logging has proven unprofitable and the dreamed of mines simply don’t exist. Anchorage already provides railroad and port facilities and this hasn’t spurred massive resource development in Alaska’s Interior. This huge push to extend the railroad reminds me of the former boondoggle of building massive grain elevators for barley that would be grown at Delta. The predicted agricultural boom never happened, but millions of dollars were spent. Real Estate speculation in the vicinity of Port MacKenzie has been the tail wagging the dog concerning millions of dollars being spent to develop this area. This is the same location that has garnered so much national ridicule as being one of two Alaska locations for the infamous “Bridges to Nowhere.” Our former Borough Mayor, a local realtor, began much of the push to develop the Port and build road, railroad and bridge infrastructure. Years later, there are just a few people living and working anywhere around the Port. It has been a huge drain of taxpayer dollars. Sincerely, Fred Hirschmann 3660 S. English Bay Dr. Wasilla, AK 99654 Phone: 907-373-3750
    Wasilla, AK
  405. Comment
    EI-18170Randi Hirschmann
    TO: Surface Transportation Board RE: STB Finance Docket No. 35095 SUBJECT: Environmental Comment by Randi Hirschmann David Navecky Surface Transportation Board 395 E Street, SW Washington, DC 20423-0001 Attention: STB Finance Docket No. 35095 Dear Staff, If we have to recommend a new extension of the Alaska Railroad from The Parks Hwy to Port McKenzie, please consider following the Willow Route. I think this route will have the least impact on our pristine recreational areas, wildlife, and wetland areas. The Houston route is the most detrimental and harmful to our wetlands and bisects some of the most pristine and frequently used recreational lands in South Central Alaska. Along the Houston route are numerous streams, creeks, lakes and wetlands that are home to an abundance of birds, fish and wildlife with many species using this area for breeding and raising their young. A railroad grade greatly changes the natural flow of wetlands. The Draft EIS states that initially only 2 trains a day will come through the selected route. The Draft EIS ignores the possibility of greater railroad traffic. It is important to look at the possibility of fuel oil, coal and other hazardous materials being transported by the trains going to Port McKenzie. Wetlands are the worse place to have a fuel spill. We have had major derailments on the Alaska Railroad with tankers of fuel being spilled. The Big Lake Route would be my second choice, because it crosses drier glacial till, but is less desirable due to human population density involved. From very early public meetings a few years ago, the Alaska Railroad and the Mat Su Borough seemed to prefer the Houston Route, which offers the shortest distance the railway would have to be built. They, of course, are looking at the bottom line even though at the most recent public meetings last month, they stated they have no preferences. They want the route that will be the most economic to develop, but will have the greatest damage to our wetlands, wildlife and pristine country. Remember too, wetlands are expensive to fill and a railroad grade built on boggy terrain is subject to frost heaving and subsidence due to the soggy organic base. Also to my dismay, I have heard that the survey team who conducted the surveys of the three possible routes to Port McKenzie was advised to put most of their money into the Houston route. It is very frustrating and disappointing to think that the private for profit Alaska Railroad and a very pro development Mat Su Borough can carry so much weight and preferential influence in this decision. One wonders if these public meetings are more of a formality than a process that really represents the individual. Thank you for your time and consideration of my comments, Randi Hirschmann
    Wasilla, AK
  406. Comment
    EI-18169Evelyn Frances Vadla
    Having homesteaded and now living near the Big Lake Route of the Port MacKenzie Rail Extension Project, I am opposed to the development of this route. We cherish the tranquility, the purity of air, the space around us. Why do we need it now?
    Big Lake, Alaska
  407. Comment
    EI-18168J. A. Oney
    anchorage, aK
  408. Comment
    EI-18167Cook Inlet Region, Inc. (CIRI)
    STB Finance Docket No. 35095 CIRI Comment Letter Attached
    Kim Cunningham · Anchorage, AK
  409. Comment
    EI-18166Ryota Abe
    Ref: Port MacKenzie Rail Project (STB Finance Document Docket # 35095) Mr. Navecky, Please accept the attached letter with corrections in replacement of the Comments I email a few minutes ago. I found several typos that potentially affected the intended meaining of the comments. Sorry for the confusion. Thank you.
    Anchorage, Alaska
  410. Comment
    EI-18165Alaska DOT&PF
    comments on draft EIS Alaska Railroad Corporation Construction of a rail extension to Port MacKenzie Alaska
    Allen Kemplen · Anchorage, AK
  411. Comment
    EI-18164Port of Anchorage
    William Sheffield · Anchorage, Alaska
  412. Comment
    EI-18162State of Alaska
    Dave Navecky May 10, 2010 STB Finance Docket No. 35095 Surface Transportation Board 395 E Street S. W. Washington, DC 20423-0001 Dear Mr. Navecky: Re: STB Finance Docket No. 35095, Alaska Railroad Corporation Construction and Operation of a Rail Line Extension to Port Mackenzie, Alaska; Issuance of Draft Environmental Impact Statement The State of Alaska has reviewed the Surface Transportation Board’s (STB’s) Draft Environmental Impact Statement (DEIS) for the Alaska Railroad Corporation’s (ARRC) Port MacKenzie Rail Extension project. The comments in this letter represent the consolidated views of the state’s resource agencies. General Comments • The inclusion of a permanent access road parallel to the tracks will increase the project footprint and environmental impacts substantially. It will involve increased wetland fill, additional clearing, and longer culverts leading to fish passage issues. The need for an access road should be evaluated in the final EIS. As a rule, the majority of the existing ARRC alignment does not have an access road. If an access road is determined necessary, additional road-specific mitigation measures must be developed and evaluated in consultation with ADF&G and other applicable resource agencies and included in the final EIS. • Access into 4(f) resources is an issue. The State disagrees with the characterization that existing section-line easements are unlikely to be potentially viable access points into the Susitna Flats State Game Refuge (SFSGR). Appendix M.1.c.2 (Section 4(f) and Section 6(f) Evaluation; page M-30), states that “It is possible that individuals could also access the refuge via section line easements, though it is unlikely due to the lack of public parking areas and the privately –owned agricultural parcels that would have to be crossed to enter the refuge via section line easements (Paulsen pers. Comm., 2009a).” This is restated again in Appendix M.1.d.2 (page M-38) under Impacts to 4(f) resources. While it is correct that the agricultural parcels in the area have had some section-line easements vacated, section-line easements and roads still exist and provide access around those agricultural parcels. Additionally, all section-line easements within agricultural parcels were not automatically vacated. Some remain, and are connected to public access easements around numerous lakes located on and adjacent to the agricultural parcels. The lack of a designated parking lot does not invalidate the potential use of existing valid section-line easements by the public. The public can park along existing borough road ROW’s in the area or make arrangements with private land owners for parking, and enter the SFSGR by walking along section-lines. The SFSGR is managed cooperatively by ADF&G and ADNR. The final EIS should reflect communications with the area managers regarding access into the refuge, not solely Matanuska-Susitna Borough (MSB) personnel. In addition, the text of that communication with the MSB was not included in the review materials. • Moose impact mitigation is an issue that has not been sufficiently addressed in this document. Mitigation measure 33 instructs the applicant to develop, in consultation with resource agencies, a strategy to reduce moose mortality caused by train impacts. This approach is grossly insufficient and circumvents the EIS process. Developing mitigation measures in the proposed manner does not bind the applicant to any course of real action, is ambiguous as to how much input resource agencies may have, and does not allow for public comment. Project-specific moose-related mitigation measures, on a route-by-route basis, must be included in the final EIS. These measures must include not only collision-related mitigation, but habitat fragmentation (e.g. properly designed and placed underpasses), and construction-related impacts. More work and direct interaction with local Division of Wildlife Conservation staff is necessary before the EIS can be finalized. • Mitigation Measure 46 provides direction to the applicant to develop, in consultation with resource agencies, mitigation measures to address impacts to the Susitna Flats State Game Refuge (SFSGR) if the Mac West Route is authorized. This approach is grossly insufficient and circumvents the EIS process. Developing mitigation measures in the proposed manner does not bind the applicant to any course of action, is ambiguous as to how much input resource agencies may have, and does not allow for public comment. Specific measures to mitigate impacts to the SFSGR need to be included in the final EIS. These measures should include, but not be limited to, compensatory mitigation, retention of public access to the refuge, and impacts to fish and wildlife. More work and direct interaction with local ADF&G and DNR staff is necessary to develop acceptable mitigation before the EIS can be finalized. • Mitigation Measure 48 provides direction to the applicant to develop, in consolation with resource agencies, mitigation measures to address impacts to state parklands and recreational areas if the Willow Route is authorized. Again, this approach is grossly insufficient and circumvents the EIS process. Developing mitigation measures in the proposed manner does not bind the applicant to any course of action, is ambiguous as to how much input resource agencies may have, and does not allow for public comment. Specific mitigation measures need to be proposed as part of the final EIS and should include, but not be limited to, compensatory mitigation and public access components. More work and direct interaction with local DNR and ADF&G staff is necessary to develop acceptable mitigation measures before the EIS can be finalized. • The draft EIS has not sufficiently addressed impacts to public use of area resources. Access to fish and game resources on public lands must be maintained across each potential alignment. Hunting and fishing activities are not limited to officially designated trails. It is not acceptable for this project to result in blockages of free access to state resources on public lands. Route-specific measures to provide passage across the alignment must be determined and included in the final EIS. These measures must include, but not be limited to, crossings at intervals frequent enough to allow historic usage patterns. Structures designed to pass humans across the alignment should also be designed to allow moose and other wildlife to cross (see attachment). More work with appropriate agencies and user groups to develop acceptable mitigation is necessary before the EIS can be finalized. • The words “practicable” and “reasonable requirements” are used throughout the document. Neither of these words are defined in the glossary. No where is it addressed that the land manager needs to concur on what the ARRC considers to be practicable and reasonable or in some cases be informed that they have made this decision. Additionally, both practicable and reasonable are heavily used in the mitigation measures, making it difficult to determine what exactly the ARRC is proposing for mitigation. What role does the landowner have in the decision making process to determine what is practicable and reasonable? For example, mitigation measure 19.2.8.2(38) states: “Public access and use of the statutory easements as established by the reasonable requirements of Alaska Statute 38.05.127...” What does the ARRC consider to be the reasonable requirements of a statute? • Authorizations issued by the state are subject to valid existing rights. The project description provided by the ARRC appears to indicate that they would like to vacate all valid existing rights or at least control them. Please note that an EIS does not provide the legal authority to accomplish this type of restriction. Section Specific Comments: Table S-2 Summary p. 32 The table listing “potential Impacts” to agriculture may be under reporting the amount of acres affected. The table lists “Acres in agricultural use lost:”, but this number does not account for agricultural lands that are still undeveloped. These undeveloped acres are still protected for future agricultural use by AS 38.05.321. 2.1.1.2: Rail Line Access Road For rail line construction and post-construction operations, ARRC would build a permanent access road parallel to the rail alignment and within the 200 foot ROW. ARRC would construct the access road before the rail line and would use the access road for construction of the proposed rail line. ARRC would not maintain the access road as a public road. As stated in the draft EIS, the right-of-way will be permanently cleared and no fence or other linear separation is being proposed or reviewed in the EIS. How does the applicant plan to block access to the road in an area that has high recreation and access use by the public? 2.1.1.5: Acquisition of Materials for Rail Line Construction ARRC would obtain fill material from cut-and-fill activities during railbed construction, and to the extent practicable, would adjust the design profile grade to balance cut and fill quantities. If needed, ARRC would obtain additional fill material from borrow sources within the ROW or off site. Additional fill material from off site sources need to be from legal gravel extraction locations or the land manager needs to concur on the location. A permit or lease may be required. 2.1.1.9 Grade Crossings Where the proposed rail line could cross a trail that is officially recognized, meaning specifically established within currently-adopted plans by ADNR and/or MSB or are established within these plans at the time of construction or ROW conveyance (whichever occurs first), and are located on state, MSB property, or whose locations are provided for by recorded ROW or easement…. The state officially recognizes trails through plans, state issued authorizations and recorded ROW, easements and plats. The definition provided by the ARRC does not include recorded plats and state issued authorizations. Please add this to the definition of an officially recognized trail. ARRC would coordinate with the trail owner and consult with the user groups as appropriate where the crossing location could have to be relocated…or where multiple crossings within one mile might be consolidated. What role does the land owner and user groups have in the decision making process? It states that the ARRC will coordinate with the trail owner and user groups, but not that they need concurrence. What happens if the groups do not agree on relocation of a trail? Additionally, there is specific guidance on how to legally relocate an RS 2477 route. The method described in 2.1.1.9 does not necessarily fulfill these requirements (i.e. 11 AAC 51 and more specifically 11 AAC 51.065). 2.1.1.10 & 2.1.1.6 Construction Staging Areas and Communication Towers The ARRC will attempt to place construction staging areas and communication towers within the right-of-way. It is not addressed what the applicant will do if they are not within the ROW. How will they work with the land owner? Do they foresee permits or leases being applied for? One of the towers appears to be adjacent to the Iditarod National Historic Trail and other official trails. How will the ARRC work with the land managers to identify the locations and possible effects any needed access roads and towers may have? 2.1.1.10 Terminal Reserve Area A reserve area usually indicates that the railroad will take ownership of the land. Is the ARRC proposing to take ownership of the existing recreation facilities within the proposed Terminal Reserve Area? 6.4.3.2 Cultural Landscapes See Appendix M below There are more contributing trails identified in Figure 6-5 than the maps illustrating the trails listed in 2.1.1.9 (official trails identified for crossings). Are there going to be crossings provided for these contributing routes, especially any currently used trails? This difference in the trail illustrations is not specifically addressed in the document. 13.1.5.1 Common Impacts to Land Use Existing land use for a small portion of land in proximity to the proposed ROW would be permanently changed, and any non-rail activities within the proposed ROW would require an ARRC-issued entry permit. Page 13.1-12 Where are these small portions located? What sorts of changes are foreseen? Please note so that the affected land owner can specifically comment in regards to the permanent changes. One could read the above statement to be a broad general statement or one describing the creation of stranded inholdings that would require ARRC permits for a land owner to monitor and manage their land. 13.2.4.2 Trails Unofficial trails can also include means of accessing public or navigable waters on state land (11 AAC 38.05.127), riparian buffers along those waters (11 AAC 51.045), or trails along Section lines (11 AAC 51.025). Page 13.2-14 The State disagrees that 11 AAC 96.020 and 11 AAC 51.025 easements are unofficial trails. They can be developed or undeveloped, but not unofficial. Also, the above sentence is not explicitly included in the glossary definition of an “unofficial trail” (Page GL-18). Section line easements are valid existing rights established by operation of law when DNR acquired the lands (AS 19.10.010), and the ARRC may have to provide crossings in the future as described under provisions of 11 AAC 51.025. If the applicant desires to vacate an 11 AAC 51.025 easement, there are specific regulations that outline the steps required to accomplish this (11 AAC 51.065). 13.2.5.1 Operations Impacts • The rail line could block access to and along public and navigable water bodies with access rights reserved through AS 38.05.127 (as described in Title 11 AAC 51.045). This would result in a change in recreational access patterns to certain waters. Because of the frequency of these access points, it is anticipated that users would identify an alternative location for recreational access to navigable and public waters that was not affected by the proposed rail line. Given the ARRC definition that access needs to be officially recognized at the time of construction or ROW acquisition (which ever occurs first), how will any alternate access be legal across the rail line if it doesn’t already exist at time of construction? The rail line is a linear feature, and traveling to an area not affected by the proposed rail line could be a substantial diversion. Additionally, if access is blocked at one stream, and forces the public to use an alternate route, how will the public legally travel back to the stream they are attempting to access without trespassing on public or private land (or the railbed)? Table 13.3-2 Known Hazardous Material Sites and Regulated Facilities of Concern 4) If the vertical and lateral extent of the contamination is undetermined, how do you know that the proposed project is outside of this contaminated site? 13.1.4.1 Existing Land Ownership Private Land: “…Private land in the vicinity of the proposed rail line is characterized as forested and some agricultural, and development is typically low-intensity, residential. Development typically occurs near lakes and ponds and linearly along highways. there are areas of private land in the vicinity of the proposed rail line east of the northern portion of the Willow Segment, around Big Lake, and agricultural land associated with the Point MacKenzie Agricultural Area between the Mac West and Mac East segments.” This summary of Private Land identifies agricultural lands but does not address patent restrictions placed upon some of them. All private land within the Point MacKenzie Agricultural Area are subject to AS 38.05.321. Some of the private land identified as being east (and possibly west) of the northern portion of the Willow segment also have AS 38.05.321 agricultural use restrictions. Note that several times in Chapter 13.1 the DEIS states that there is no data available to determine land ownership in the proposed ROW. The land ownership is then assumed to be publicly owned by the State of Alaska. This data is available and the final EIS should contain accurate land ownership information for all of the proposed routes. 13.1.4.3 Existing Zoning Point MacKenzie Agricultural Area: “… Land titles are subject to a recorded declaration of covenants, conditions, and restrictions to promote agricultural use. The covenants, conditions, and restrictions limit improvement sites, residential locations, and subdivision of the original farm unit.” These lands are subject to a perpetual covenant for the benefit of all Alaska residents and running with the land that restricts or limits the use of the land for agricultural purposes. No conversion of these lands to non-agricultural use is allowed. This Draft EIS does not address this patent restriction or outline the process by which these restrictions could be removed. The anticipated economic feasibility of the land's productivity for agricultural pursuits has not been realized. The Point MacKenzie Agricultural Area has several active dairies, livestock operations, and several thousand acres of hay are in production. How has the Draft EIS concluded that the goals for agriculture have not been met? In 1997, AS 38.05.321 was amended to ease restrictions on the subdivision of agricultural land. Prior to 1997 AS 38.05.321 allowed agricultural parcel owners to subdivide into as many subdivision of at least 40 acres as they wanted to. AS 38.05.321 limited agricultural parcel owners to a maximum of 4 subdivided parcels of at least 40 acres. This was an additional restriction not a lessening of restrictions. 14.4 Socioeconomics, Affected Environment What impact will there be to taking on agricultural covenants? How does farm equipment cross the rail line if it bisects a parcel? 19.2.2.2 SEA’s Preliminary Mitigation Measures 17) During final design of the project, the Applicant shall conduct all siting, design, and development of the rail line and associated facilities according to the reasonable requirements within the jurisdiction of the Alaska Department of Natural Resources and the Alaska Department of Fish and Game. Please define “reasonable requirements” and how disagreements between the ADNR/ADFG and the applicant on these requirements will be resolved? 19.2.8.2 SEA’s Preliminary Mitigation Measures 38) In coordination wit the Alaska Department of Natural Resources (ADNR), the Applicant shall ensure that project-related bridges and culverts placed on navigable or public waters, as determined by the ADNR, are designed and installed to accommodate: • Navigation by recreational boat users in a manner that shall not impede existing uses, to the extent practicable, and • Public access and use of the statutory easements as established by the reasonable requirements of Alaska Statute 38.05.127, Access to Navigable or Public Water. Who determines what is “practicable” and the “reasonable requirements” of a statute? This could actually not be a mitigation measure, since the ARRC could find that it’s not “practicable” and the statute is “unreasonable”. How will disagreements between ADNR and the applicant on the use of this mitigation measure be resolved? 19.2.9.2 SEA’s Preliminary Mitigation Measures 39) What is the timeline and funding source for the plan under #39? 40) The Applicant shall consult with the appropriate management agencies, including the Alaska Department of Natural Resources and the Alaska Department of Fish and Game to ensure that project-related bridges and culverts are signed, constructed, and maintained to accommodate travel by winter modes of transportation (snow machine, dog sled, etc.) on streams and rivers used for recreational access, as determined under mitigation measure 38. How will it be determined under mitigation measure 38? Winter access on a water body is not confined to a 38.05.127 easement. Is the ARRC just referring to water determined navigable and not the bulleted items? Also, the ADFG is included as an agency under mitigation measure 40, but not 38. Please explain what the ARRC envisions the role of ADFG to be in regards to this measure. 41) The applicant shall consult with resource management agencies including the Alaska Department of Natural Resources, the Alaska Department of Fish and Game, and appropriate trial user groups regarding provision, access, and design of crossings for trail easements with intersect with the rail line. Consultation shall include concerns related to general dispersed-use access, informal public trails on state land, blazed section lines, and long stretches of rail line without designated public crossings. A blazed section line could be a developed legal easement. Why is the ARRC consulting about general dispersed-use access, informal public trails on state land and long stretches of rail line without designated public crossings, since these are defined as “unofficial trails” that will not have crossings? Is this mitigation since the EIS states no legal crossings will be constructed? 48) If the Surface Transportation Board authorizes the Willow Segment, the Applicant shall consult with the Alaska Department of Fish and Game and the Alaska Department of Natural Resources to develop and implement measures, including consideration of the replacing acreage used for rail right-of-way, to minimize impacts to the Nancy Lake State Recreation Area, Little Susitna State Recreation River, and Willow Creek Recreation Area to the extent practicable. Is the railroad swapping their land or paying for new land to replace acreage? Otherwise, this is not necessarily a mitigation measure. Appendix M: Draft Section 4(f) and Section 6(f) Evaluation Iditarod National Historic Trail Historic sections of the trail and historic sites associated with the trail may be subject to Section 4(f) if deemed historically significant; however, the portion of the trail in question for this project (Knik to Susitna River) is considered ineligible for inclusion on the National Register as a historic trail segment according to the Iditarod National Historic Trail Comprehensive Management Plan (BLM 1986) and is therefore not subject to the provisions of Section 4(f) under this condition. DNR has been unable to locate an ineligibility determination for the Knik to Susitna River Primary Trail of the Iditarod National Historic Trail. Please provide a more specific citation with the required concurrence from the State Historic Preservation Officer and/or Advisory Council on Historic Preservation. Otherwise, remove this statement. The cultural resources analysis conducted through the Section 106 process for the proposed rail extension identified dog sledding associated with the INHT including improvements made from 1967 through 1978 for the Iditarod Race as a cultural landscape potentially eligible for inclusion on the National Register. Per the Cultural and Historic Resources section of the draft EIS, dog sledding associated with the Iditarod National Historic Trail and Iditarod Race are “considered a cultural landscape and assumed eligible for inclusion in the National Register” (6.4.3.2, Page 6-19). Since Part 1 of the draft EIS states that this is eligible (not potentially), please provide a 4(f) review. In addition to the above issues, the Iditarod Trail is a recreation trail that is collocated with an RS 2477 route and has a recorded state easement (ADL 222930) and survey (ASLS 830001 Goose Creek to Susitna Station). Please provide documentation as to why the RS 2477 route and recorded easement with platted survey for an active recreation route do not qualify under a Section 4(f) review. Officially Recognized Trails These trails would be closed temporarily during construction and crossings could be relocated or consolidated with other trails if they exist nearby to reduce the number of crossings of the rail line in proximity to one another. Trail closures, though temporary, could affect user enjoyment though ARRC would time construction activities during the most appropriate timeframe to limit impacts to trails…Impacts such as closure of trails during construction would be temporary and would not result in permanent impairment of the features of the resource that qualify it as a Section 4(f) resource. Only the temporary closures are discussed, not the permanent relocations and consolidations. What are the impacts of relocating and consolidating the trails? This concludes the State’s response to the Port Mackenzie Rail Extension DEIS. We look forward to working closely with the SEA and the applicant to address any outstanding issues. Please contact me at (907) 269-7476 or by email at donald.perrin@alaska.gov if you questions regarding these comments. Sincerely, Don Perrin Project Management and Permit Coordinator Alaska Department of Natural Resources Attachments: 1. Mitigation table comments 2. Guidelines for moose mortality mitigation 3. Current agriculture land maps cc: Mike Bethe, ADF&G Ken Bouwens, ADF&G Ellen Simpson, ADF&G Wyn Menefee, ADNR Sandy Singer, ADNR Lesli Schick, ADNR Erik Johnson, ADNR Wayne Biessel, ADNR Attachment 1 The following table lists the State’s comments on the proposed mitigation measures. Mitigation measure Recommendation Comment 19.2.1 Topography, Geology, and Soils VM-1 NR 19.2.2 Water Resources VM-2 Retain VM-3 Amend Include ADF&G Special Area Permit in list of state permits. VM-4 Amend Remove …to the extent practicable." VM-5 Amend Include "...and access road…" after "…rail line…". Clarify that the applicant will ensure connectivity for all wetland drainages. VM-6 Retain VM-7 Retain VM-8 Retain VM-9 Retain VM-10 Amend insert: "...in consultation with ADF&G Division of Habitat and..." after "structures". Clarify that an ADF&G Fish Habitat Permit will be required to cross specified anadromous streams. VM-11 Amend Include "...in consultation with ADF&G..." after "Applicant". VM-12 Retain SEA-1 Retain SEA-2 Retain SEA-3 Retain SEA-4 Amend include "all" after "mark". SEA-5 Retain SEA-6 Retain SEA-7 Retain SEA-8 Amend Clarify that all travel off the ROW must be approved by the land owner. SEA-9 Retain SEA-10 Amend Clarify that gravel mining below the OHW mark of anadromous streams would require authorization (not just consultation) from ADF&G. SEA-11 NR SEA-12 Retain SEA-13 Amend Add that no storage of fuel would be allowed within 100-feet of anadromous waterbodies. SEA-14 Amend add: "..and, in the case of fish-bearing streams, ADF&G." to the end of the sentence. SEA-15 Retain SEA-16 Amend add: "blockages to free-fish passage" after "to avoid". Clarify that the applicant accepts the responsibility to clear all blockages, including those related to beaver activity and perched culverts, under the alignment for the life of the rail line. Also, culverts must be designed to allow fish passage at low flows. SEA-17 Amend Remove the word "reasonable". SEA-18 NR SEA-19 Retain SEA-20 Amend add: "and natural condition." after "contours". SEA-21 Remove SEA-22 Retain 19.2.3 Biological Resources VM-13 Retain VM-14 Retain VM-15 Retain VM-16 Retain VM-17 Retain VM-18 Retain VM-19 Retain SEA-23 Retain SEA-24 Amend Clarify that ADF&G will make the final determination on whether a stream is fish bearing. SEA-25 Amend Add "anadromous and resident fish streams" and "moose calving area" to the list of potential highly sensitive areas. SEA-26 Retain SEA-27 Retain SEA-28 Amend Refer to appropriate BMPs contained in the Alaska Forest Resources and Practices Act (FRPA). SEA-29 Retain SEA-30 Retain SEA-31 Amend Include all work below the Ordinary High Water mark of all fish bearing streams to possible work. Remove the word "reasonable". SEA-32 Amend replace: "… not narrow an anadromous water body between its mean high water lines…" with "…not modify an andromous water body below the ordinary high water mark…" SEA-33 Amend Add recommendations outlined in attachment A into this mitigation measure. SEA-34 Retain SEA-35 Retain SEA-36 Retain New Free fish passage will be maintained across the project reach for the life of the project. This includes, but is not limited to, blockages through culverts and bridges caused by beaver activity and perched culverts. New Wetlands cataloged as anadromous under AS 16.05.871 will be avoided. Fill will not be placed within anadromous wetlands. New Public access to fish and wildlife resources shall be maintained during construction and operation to the maximum extent practicable. 19.2.4 Cultural Resources VM-20 NR VM-21 NR 19.2.5 Climate and Air Quality VM-22 NR VM-23 NR 19.2.6 Noise and Vibration VM-24 NR VM-25 NR VM-26 NR SEA-37 NR new The Applicant shall consult with and obtain fish habitat permits from ADF&G for pile driving activities and use of explosives near anadromous streams. 19.2.7 Transportation VM-27 NR VM-28 NR VM-29 NR VM-30 NR VM-31 NR VM-32 NR 19.2.8 Navigation VM-33 Retain VM-34 Retain SEA-38 Retain 19.2.9 Land Use VM-35 Retain VM-36 Retain VM-37 NR VM-38 NR VM-39 NR VM-40 NR VM-41 NR VM-42 Amend VM-43 NR VM-44 NR VM-45 Retain VM-46 NR SEA-39 Retain SEA-40 Amend Include guidelines recommended into SEA-33 into these crossings to allow large mammal passage. SEA-41 Amend Revise to read: The Applicant shall consult with resource management agencies including the Alaska Department of Natural Resources and the Alaska Department of Fish and Game, and appropriate trail user groups, to develop and implement measures regarding provision, access and design of crossings for trail easements trails that intersect with the rail line. Consultation shall include concerns related to general dispersed use access, informal public trails on state land, blazed section lines section line easements and long stretches of rail line without designated public crossings. SEA-42 NR SEA-43 Retain SEA-44 NR SEA-45 NR SEA-46 Amend Change to: If the Surface Transportation Board authorizes the Mac West Segment, the Applicant shall consult with the ADF&G and DNR to develop and implement mitigation measures to address impacts to the Susitna Flats State Game Refuge. Mitigation measures will include, but not be limited to, compensatory mitigation and public access to the refuge. SEA-47 Retain SEA-48 Retain SEA-49 Amend Include ADF&G SEA-50 NR SEA-51 NR SEA-52 Retain SEA-53 NR Attachment 2 ADF&G guidelines for Moose Mortality Mitigation (accommodates most other large wildlife ) • Provide undercrossings in areas of natural moose travel areas where possible, with a maximum spacing of one to two miles between undercrossings. • Place additional undercrossings in high use areas. • Provide an open line-of sight through undercrossings and under bridges. • Provide an openness of 2.0 or greater for moose undercrossings. • Reduce sound levels coming from above and echoes within undercrossing structures. • Provide upland (non-submerged and non-iced) corridors through and approaches to all undercrossings. • Provide suitable walking surface (e.g., cover rip-rap with soil) across the alignment. • Provide minimum of 12 feet clear opening above ground/snow line of sight (i.e., with 2 feet of snow cover need 14 feet clearance from ground surface). • Configure access road and railroad crossings separately with open space in between. Do not design one long undercrossing under both prisms. • Consider fencing or other measures to keep animals from entering area between the access road and railroad alignments. • Institute snow removal policy and procedures to eliminate berms that may block access across the alignment."
    Don Perrin · Anchorage, AK
  413. Comment
    EI-18161Marjorie McLaren
    My husband and I own property on West Papoose Lake and are opposed to the construction of a rail line on Pt McKenzie that would seriously restrict recreational travel in the Matsu area. The ability to cross rail lines by snowmobile or other means would be greatly restricted, severely limiting winter access and activities in the area. Furthermore, the routes cross lots of wetlands, causing construction and ongoing maintenance issues and potential environmental damage from runoff and access roads. Further, we question the purpose and need for this project. The Port is not deepwater and will need to be dredged just like Anchorage. For two trains a day (forecast), those trains can go to Anchorage. There is no pressing need to build this rail line when one already exists that could absorb the volume. In summary, we oppose the project as being unnecessary, environmentally harmful, severely damaging to recreation in the area as well as being unnecessarily expensive for any benefit" received."
    Anchorage, Alaska
  414. Comment
    EI-18155Grace Whedbee
  415. Comment
    EI-18154Sharon L. Berg
  416. Comment
    EI-18153Douglas and Sharon Smole
  417. Comment
    EI-18151Willow Area Community Organization
    Linda Oxley
  418. Comment
    EI-18150Tara Oney
    In Regards to STB 35095 As a resident for 12 years on Point Mackenzie I think that the railroads plan to follow the roads would be catastrophic to our quality of life. Noise pollution and danger to children and wild life in the area. Point Mackenzie is also a critical land to protect the run off into cook inlet. There are alternate routes they can take that would be healthier for residents and wild life.
    Point Mackenzie, Alaska
  419. Comment
    EI-18149Edward and Brenda McCain
    See attached letter
    Willow, AK
  420. Comment
    EI-18152Kevin C. Berg
  421. Comment
    EI-18148Daniel E. Smith
    May 9, 2010 To: David Navecky STB Finance Docket No. 35095 Surface Transportation Board 395 E Street S.W. Washington, D.C. 20423-001 Re: Proposed Alaska Rail Line Extension to Port MacKenzie; Draft EIS After review of the Draft EIS it appears as if the Willow route makes the least sense from many perspectives. As noted in the Draft EIS, it is the most expensive, crosses the most streams and rivers and cuts through the most recreation areas. Of particular concern is the impact on Recreation Areas. On occasion we find a rare place worth more than another for some inherent qualities that exist within that area and we attempt to preserve those qualities and that area so that they may be enjoyed. Such is the case with the Recreation Areas that the Willow route proposes to cut through. The Draft EIS points out the obvious drawbacks, such as noise, vibration, negative hunting and wildlife impacts, access restriction across RR right of way (trespass) and other limitations that will be imposed on the recreation areas referenced. The affected recreation areas are close enough to population centers that they actually get used by many people for the purpose that they were intended and not as preserves or refuges where access is limited by a more remote situation. In short, people use and enjoy these places for the qualities they have to offer. I know of no one who currently defines their recreation activities in these areas to include the presence of a railroad. The Willow railroad spur will not enhance recreational activities. A railroad corridor through these recreational areas will in fact have an adverse affect on all recreation activities. Recreation, be it in the form of snowmachine riding, skiing, hunting, fishing, or just the quiet enjoyment of a unique area, is the purpose for which these Recreation Areas were established. Please select a route other than the Willow route. Sincerely, Daniel E. Smith 8945 Emerald Dr. Anchorage, Alaska 99502 (907) 244-1811
    Anchorage, Alaska
  422. Comment
    EI-18212Exhibit for 4/7/10 Public Meeting Testimony
    Greg Strong
  423. Comment
    EI-18147Peter Sedgwick
    As a land owner in Point MacKenzie area I would like to make an input to the proposed railway extention in STB 35095. My major concern is the safety of the railway/road crossings. I feel the Mac West route would have the lowest impact on the residence and have the fewest vehicle driving across the track.
    Victorville, CA
  424. Comment
    EI-18146Joan Egeland
    concerning the port mackenzie rail extension project: I do not want the Houston alternative, I don't think any of the alternatives are ideal but especially not Houston. I don't like the fact that it separates state recreation areas that are highly used by people in the big lake area. I don't like the high impact it will have on the wetlands surrounding the area.
    Anchorage, AK
  425. Comment
    EI-18145Eric E Egeland
    Thank you for all of your hard work. I am submitting my comments on what I desire to see as an outcome in the Pt. Mac project IF it is to happen. First off I am not in favor of the extension b/c of its impact on wetlands in the Valley. My biggest concern is that which ever rout is picked that the Houston Route be AVIODED IF AT ALL POSSIBLE. I write my comments as a long time Alaska photographer and birder. I believe that the impact to wetlands would be disasterious to migratory bird habitat and life cycle. The area just east of the Papoose Lk area has many groups and populations of Trumpertor Swans, Sand Hill Cranes, many species of geese and to nurmourous of ducks to name. I am asking that the routes of Willow and Big Lake be choosen before the Houston route.
    Anchorage, AK
  426. Comment
    EI-18144John Strasenburgh
    STB Finance Docket 35095. To whom it may concern: These are my comments on the Draft Environmental Impact Statement (DEIS), Alaska Railroad Corporation Construction and Operation of a Rail Line Extension to Port MacKenzie, Alaska. STB Finance Docket 35095. If there is a build option, I support “Mac East” at the south end and “Houston South” at the north end. However, there is considerable question in my mind as to the financial viability of the rail extension. I have seen the “Benefit-Cost Assessment of the Port McKenzie Rail Extension,” prepared by Steve Colt and Nick Szymoniak, Institute of Social and Economic Research, dated March 10, 2008. I believe the assumptions that form the basis of this analysis are unrealistically optimistic (e.g., “coal to Agrium”) and that before proceeding to a build alternative, further cost-benefit analysis must be performed to confirm that this proposed extension makes financial sense. The only acceptable build option, in my opinion, is the “Mac East/Houston South” alternative. The DEIS considers Section 4(f) of the National Environmental Policy Act (“NEPA”) and discusses the impacts that a rail extension, under each alternative, on public parks, refuges, and recreation areas. Such impacts to 4(f) resources under the Mac West, Willow, and Houston North alternatives are significant and unacceptable, and these alternatives must be ruled out. Feasible alternatives exist in Mac East for the southern portion and Houston South for the northern portion, both of which have minimal impacts to 4(f) resources. Although the Big Lake alternative has minimal impacts to 4(f) resources, it has impacts to residences and archeological resources, where Houston South does not. Hence, if the rail extension is to be built, the Mac East/Houston South route is the only acceptable alternative, and is the only one I would support. Thank you for this opportunity to comment.
    Talkeetna, AK
  427. Comment
    EI-18143Ken Hilfiker
    In the last days of the legislative session, approximately $57 million was added to pay for part of an environmental impact study and also part of the rail starting at the Point McKenzie dock heading North. This appropriation was made without public meeting or public input. Since no final decision has been made on the four options for the rail, one of which is do not build", I think the appropriation of funds is premature. If a decision to issue a permit is made in the future, the funds could be allocated at that time. South Central Alaska already has three deep water ports (Whittier, Seward, and Anchorage-which is only a couple miles from Point McKenzie) that are accessible by rail. Building a rail spur at Point McKenzie that has no permitted connection has the potential to be labeled the ”rail to nowhere” and an embarrassment to Alaskans and our government. In addition, I do not agree with the position of DNR as quoted in the Draft Environmental Impact Study for the Rail Extension to Point McKenzie stating that the Willow route which divides the Willow Creek and Nancy Lake State Recreation Areas has “no facilities or specific resources within that area that would be adversely affected”. Since I recreate in Nancy Lake State Recreation Area nearly every month of the year, I can tell you the noise from the current location of the railroad detracts from the wilderness experience I have on Red Shirt Lake. The current location of the track is 8 miles away. Putting a railroad within 1 mile of Red Shirt Lake will decrease the recreational experience in one of the Mat-su nicest recreation areas. Since the building of the rail is years away if at all, I feel there are more pressing needs for these state funds, such as the Bullet Gas Line. The bullet line will ensure continued diverse, economic growth to South Central Alaska and I prefer to be warm in my home in the next decade. Thank you for your consideration Ken Hilfiker"
  428. Comment
    EI-18142Gary Swearer
    We feel if a RR spur must be built, the MOST sensible route would be the Willow Route"."
    Wasilla, Alaska
  429. Comment
    EI-18141Alaska Survival
    5/5/10 Comment on Draft EIS Construction and Operation of a Rail Line Extension To Point MacKenzie by the Alaska Railroad Corporation THIS IS TO SUPPORT THE NO ACTION ALTERNATIVE. THERE IS NO ENVIRONMENTAL AND ECONOMIC DATA THAT SUPPORTS THE EXISTENCE OF THIS RAIL EXTENSION WHICH IS PROPOSED TO BE BUILT BY FEDERAL FUNDS. THIS SUBSIDIZED PROPOSAL THREATENS THE NON-RESOURCE EXTRACTIVE ECONOMY AND RESIDENTIAL QUALITY OF LIFE IN THE RAILBELT. On the face of it, why would a mere 30 –48 mile new rail line threaten the integrity of the railbelt current economy? The current Alaska State and MatSu Borough administration desire this proposed project in order to jumpstart a mining and timber harvest boom along the railbelt and to expand the current Port MacKenzie. The administrations are inflating the number of construction jobs and the economic profit. The costs to our environment are not figured into their profits. This new rail does not promote long term growth and development because it will negatively impact the current economy of the Susitna Valley by bringing development and environmental destruction to fish and game habitat, water quality, dedicated and undedicated trail systems, structured and dispersed recreation areas, fishing and hunting. It will blow a hole through undeveloped forests now creating developed access that will cause irrevocable changes. The 2007 Mat Su Borough funded Cole report states that the non-consumptive uses of the resources in the borough exceed the consumptive uses by a ratio of about 20 to 1 which in dollars is $363 million in tourist expenditures compared to $18 million for consumptive uses such as commercial logging. The Alaska Department of fish and Game, Division of Sport Fishing has estimated that for 2007, in southcentral Alaska, $989 million($561million residents, $428 million non-residents) was spent by sport fishers on fishing trips, equipment, and development and maintenance of land use. The “Opportunity to go fishing has a value often difficult to measure in dollars. But it is an important part of the economy and a vital source of income to many in small towns and cities.” Why am I mentioning these figures for an area larger than the proposed extension? If this proposed rail is to jump start an industrial economy, then our current economy for the railbelt and the Mat Su Borough is affected by the cumulated impacts. This proposal would detrimentally lower the quality of life for the residents of Willow, Houston, and Big Lake by the noise and environmental pollution, and displacement of trails and homes. The money that has been spent on this whole process, and the subsidies to design and build the project would be better spent on developing the Port of Anchorage. The ARRC has an agenda to spray herbicides on their rail line as a vegetation control strategy. They are not dedicated to finding non-herbicide alternatives to control in spite of overwhelming majority public opinion and comment against herbicides. Thus, they will want to spray this new line and we will have to deal with these toxins ending up in our waters, fish and wildlife and our bodies causing much illness. A development project like this will cause the influx of invasive plant species. And since the powers that be have made this the new boogy man and provided many federal and state grants to fight such, eventually there will be herbicide applications to control invasive plants. Why was there no draft EIS plan in the Talkeetna and Trapper Creek libraries since the cumulative impacts will affect these areas? This is a deficiency in the process. The National Marine Fisheries Service will be looking and commenting on the draft after the public comment period closed for the critical habitat designation for the Endangered Cook Inlet Beluga Whale. But the public will not have access to that comment. This is a deficiency in the process. In conclusion, the No Action Alternative is necessary for a project that will wipe out wetlands, property, rural living and recreational venue and non-extractive economies. There is no real economic justification besides being based on “long-term possibilities” of increasing an industrial economy. NO MITIGATION MEASURES COULD EVER BE ENOUGH TO MAKE UP FOR THE LOSSES. Becky Long, Board of Director, Alaska Survival Box 320, Talkeetna AK 99676 Issues320@hotmail.com 5/5/10 Comment on Draft EIS Construction and Operation of a Rail Line Extension To Point MacKenzie by the Alaska Railroad Corporation THIS IS TO SUPPORT THE NO ACTION ALTERNATIVE. THERE IS NO ENVIRONMENTAL AND ECONOMIC DATA THAT SUPPORTS THE EXISTENCE OF THIS RAIL EXTENSION WHICH IS PROPOSED TO BE BUILT BY FEDERAL FUNDS. THIS SUBSIDIZED PROPOSAL THREATENS THE NON-RESOURCE EXTRACTIVE ECONOMY AND RESIDENTIAL QUALITY OF LIFE IN THE RAILBELT. On the face of it, why would a mere 30 –48 mile new rail line threaten the integrity of the railbelt current economy? The current Alaska State and MatSu Borough administration desire this proposed project in order to jumpstart a mining and timber harvest boom along the railbelt and to expand the current Port MacKenzie. The administrations are inflating the number of construction jobs and the economic profit. The costs to our environment are not figured into their profits. This new rail does not promote long term growth and development because it will negatively impact the current economy of the Susitna Valley by bringing development and environmental destruction to fish and game habitat, water quality, dedicated and undedicated trail systems, structured and dispersed recreation areas, fishing and hunting. It will blow a hole through undeveloped forests now creating developed access that will cause irrevocable changes. The 2007 Mat Su Borough funded Cole report states that the non-consumptive uses of the resources in the borough exceed the consumptive uses by a ratio of about 20 to 1 which in dollars is $363 million in tourist expenditures compared to $18 million for consumptive uses such as commercial logging. The Alaska Department of fish and Game, Division of Sport Fishing has estimated that for 2007, in southcentral Alaska, $989 million($561million residents, $428 million non-residents) was spent by sport fishers on fishing trips, equipment, and development and maintenance of land use. The “Opportunity to go fishing has a value often difficult to measure in dollars. But it is an important part of the economy and a vital source of income to many in small towns and cities.” Why am I mentioning these figures for an area larger than the proposed extension? If this proposed rail is to jump start an industrial economy, then our current economy for the railbelt and the Mat Su Borough is affected by the cumulated impacts. This proposal would detrimentally lower the quality of life for the residents of Willow, Houston, and Big Lake by the noise and environmental pollution, and displacement of trails and homes. The money that has been spent on this whole process, and the subsidies to design and build the project would be better spent on developing the Port of Anchorage. The ARRC has an agenda to spray herbicides on their rail line as a vegetation control strategy. They are not dedicated to finding non-herbicide alternatives to control in spite of overwhelming majority public opinion and comment against herbicides. Thus, they will want to spray this new line and we will have to deal with these toxins ending up in our waters, fish and wildlife and our bodies causing much illness. A development project like this will cause the influx of invasive plant species. And since the powers that be have made this the new boogy man and provided many federal and state grants to fight such, eventually there will be herbicide applications to control invasive plants. Why was there no draft EIS plan in the Talkeetna and Trapper Creek libraries since the cumulative impacts will affect these areas? This is a deficiency in the process. The National Marine Fisheries Service will be looking and commenting on the draft after the public comment period closed for the critical habitat designation for the Endangered Cook Inlet Beluga Whale. But the public will not have access to that comment. This is a deficiency in the process. In conclusion, the No Action Alternative is necessary for a project that will wipe out wetlands, property, rural living and recreational venue and non-extractive economies. There is no real economic justification besides being based on “long-term possibilities” of increasing an industrial economy. NO MITIGATION MEASURES COULD EVER BE ENOUGH TO MAKE UP FOR THE LOSSES. Becky Long, Board of Director, Alaska Survival Box 320, Talkeetna AK 99676 Issues320@hotmail.com
    Becky Long · Talkeetna, AK
  430. Comment
    EI-18140Duane Maney
    I have reviewed the EIS for the Port MacKenzie Rail Extension and it appears very obvious that the Willow route has the most severe negative impact to the environment in many accounts. It would have huge impacts to all classes of wetlands as well as several creek crossings. The Willow corridor would disrupt prime basically untouched wilderness/forested areas with huge impacts to wildlife. The Houston and Big Lake routes are through fairly populated and developed areas. The Big Lake route would have little impact to the environment, and Houston route would have slightly more impact but still nothing as severe as the Willow route. The Nancy Lake State Recreation Area is a very pristine natural park full of wildlife and scenic Alaskan beauty, but still within close proximity to communities, and also with good accessibility. The State Of Alaska DNR has performed a wonderful job throughout the decades preseverving its beauty and pristiness. Accessing and exploring the park is like going back in time. Its quiet and serene, in a very theraputic way. Constructing a railroad adjacent to it would be a travesty to say the least. Building a railway to a dock that is really unwarranted since we already have rails to three deep water ports in the southcentral area seems like a waste of time and money. The Willow route is also the most expensive and time consuming due to both permitting and construction procedures, having to build through wetlands and creek crossings. As you can tell I am very much opposed to the Willow route, and actually opposed to the extension project in its entirety. I know that the MSB is in a financial bind with many problems to resolve in their fast gromwing communities, therefore I see the railway as a way for them to make revenue in many areas once it is built. However at the stake of ruining a very special wonderful piece of Alaskan splender it is not worth the price we would pay in the end for the loss. It would be a shame. Thank you for your time, and I appreciate your consideration in regard to my concerns. Duane Maney
    Anchorage, Alaska
  431. Comment
    EI-18138E. Joe Griffith
    Letter re: Comments on DEIS Alaska Railroad Corp. Construction and Operation of Rail Line Extension to Port MacKenzie, Alaksa (2 pg letter and 2 attachments).
    Palmer, AK
  432. Comment
    EI-18134Julie Peterson
    The use of the area around our cabins will be destroyed if they put the railroad inside this recreational area. From the environmental way of looking at it, I would like to make the following coments. 1- The railroad bed will create a dam" that is 35 miles long. This will keep the surface and ground water from flowing as it is now. We will have more wet lands with big puddles of water. The Willow route is mostly predominately morine soil were the Houston routes are predominately bog and out wash. The Bourgh informed the Alaska Fish and Game that they would have to build bridges over any wet lands that were identified as "bog" or 'out wash." The Willow Route is along a glacial moraine that is above the water table and has less chance of impact on the lakes, rivers or wells. 2- There are more cultural and historic sites along the Huston route. 3- The displacement of wildlife is about the same for the Willow and the Huston route. However the Loons in Crooked lake will be effected by the noise and most likely not mate or lay their eggs. 4- The railroad would directly affect private property within several miles of the route with noise and vibration, restricting recreational use of trails, additional safety issure and visual impact; not to mention the potential of spills in a populated area. Property value will be reduced, quality of life will decrease, and the quiet enjoyment of our land will be effected. So why put the railroad were it effects the most people? Very few people would be effected by the Willow route."
  433. Comment
    EI-18135Ed Manning II
  434. Comment
    EI-18132Radlinski, Nicholas J.
    I can't help but to believe as a resident of the locale where the Port Mac RR extension is under consideration that it is a foolish waste of time and resources when the road system is readily available. If more freight is needed to be moved, than more trucking would adequately solve the problem. The roads are not overcrowded, so my vote will be to scrap the project in it's entirety as folly. Sincerely, Nicholas J. Radlinski
    Houston, AK
  435. Comment
    EO-1465Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  436. Comment
    EI-18133Jim Sawhill
  437. Comment
    EI-18131Kenneth Farmer
    in Chater 11 - Grade Safety and Crossing Delay, You publish a schedule of expected delays at anticipated road crossing. For connector 3 you identify two road crossings; Ayrshire Avenue and West Carpenter Lake Road. However, in actual fact, The connector crosses three roads, Ayrshire Road, West Carpenter Lake Road, and Farmers road, all within the space if a half mile. No Mention is made of the crossing of Farmers road which woul occur within one hundred yards of the crossing of West carpenter Lake Road. Farmers Road is perpendicular to Aryshire Road and is used as an access Road to several homes on or near Carpenter Lake. If the connector 3 route were to shift a couple of hundred yards to the west and south, it would only need to cross one road, Ayrshire road, saving two unnecessary and extremely inconvenient crossings.
    Wasilla, AK
  438. Comment
    EO-1464Alaska State Historic Preservation Office
    Judith Bittner
  439. Comment
    EI-18127Toby Riddell
    Locating the rail adjacent to Point MacKenzie Road would create several problems with development of our community. The Point MacKenzie Comprehensive Plan identifies the area around the “T” intersection at Point MacKenzie Road and Ayrshire Road as the best location to develop a community town center. Situating the rail next to Point MacKenzie Road would prohibit development to the West side of the road and promote “strip type” development from the intersection all the way to Port MacKenzie on the East side of the road. The Point MacKenzie Community Council supports the Mac West route since it would have the least impact on our growth and allow better access for residents, business, and visitors. Wasilla and Palmer are both trying to relocate or abandon rails through their cities due to traffic congestion and access problems. Our home on Carpenter Lake is off of Farmers Road and we would have to cross the rail twice (Mac East/Connector 3) in order to get to work and back home if both crossings are “on grade”. Although we sincerely welcome and support the economic opportunities associated with the rail line, it is important to plan for the growth of our community in order to avoid or limit negative impacts from development. Toby and Kay Riddell 12503 S. Farmers Rd. Wasilla, AK 99654 (907) 373-7768
    Wasilla, Alaska
  440. Comment
    EI-18104Otto Rebischke
  441. Comment
    EI-18103Dana L. Olson
  442. Comment
    EI-18102Sandra D. Berean
  443. Comment
    EI-18098Lev Shvarts
    As a landowner in Willow, I'm very concerned about both the environmental impact of the proposed branch through Willow, and the loss of trail access and recreational opportunities the branch through Willow will undoubtedly bring. This would be a devastating loss to a community that caters to recreational interests, and the loss of trail access would be disastrous. I'm deeply against running the proposed rail line through Willow. Houston wants it, give it to them. Don't run it through Willow.
    Winchendon, MA
  444. Comment
    EI-18101Ray Debenham
  445. Comment
    EI-18100John G.R. Wolfe
  446. Comment
    EI-18199Knik - April 14, 2010
    Public Meeting Transcripts
  447. Comment
    EI-18097WILLIAM MAILER
    Please see attached document.
    Willow, AK
  448. Comment
    EI-18198Willow - April 13, 2010
    Public Meeting Transcripts
  449. Comment
    EI-18125Nina Zwahlen
  450. Comment
    EI-18120Victor Stanculescu
  451. Comment
    EI-18118Daniel N. Russell
  452. Comment
    EI-18114Duane Nixon
  453. Comment
    EI-18110Lynda Barcome
  454. Comment
    EI-18095James Faiks
    I understand that the primary objective of this rail extension is to facilitate the movement of freight between interior Alaska and a port. Since the Anchorage port is further away and has very little land for staging industrial projects, extending the RR to the port at MacKenzie does make sense. I believe the Willow route should be selected for the following reasons: 1. It is the most direct route from the interior to a port. 2. It has the least impact on dedicated recreational trails. 3. It crosses or impacts less private property than the other 2 routes. 4. It will not cross any major roads, and only a few minor ones. 5. Although this route requires the construction of more rail miles, the reduced cost of road and trail crossings and the fewer land condemnations and conflicts with private land owners could make it the most cost effective route. 6. If a road were to be constructed later adjacent to the Rail, it would greatly reduce commercial traffic though downtown Big Lake. 7. As the port becomes more successful, increased Rail traffic to it along the Willow route will be the least disruptive for the majority of the population. 8. The Willow route follows a glacier moraine and might avoid more wet lands than the other two routes. I encourage you to select the Willow route.
    Big Lake, AK
  455. Comment
    EI-18214Exhibit for 4/12/10 Public Meeting Testimony
    Grace Whedbee
  456. Comment
    EI-18213Exhibit for 4/12/10 Public Meeting Testimony
    John Himmelright
  457. Comment
    EI-18197Houston - April 12, 2010
    Public Meeting Transcripts
  458. Comment
    EI-18115Big Lake Community Council
    William O'Hara
  459. Comment
    EI-18096Douglas Debenham
    Re: Houston south route for the railroad. Please do not use this route for the railway. There are many cabins and recreational areas on this route that would be adversely affected. I have spent the last almost forty years of my life enjoying the areas around crooked lake in particular. Please give careful consideration to the Willow route as this would affect fewer people. Thanks for your thoughtful consideration of this request. Sincerely, Douglas R. Debenham, M.D.
    Eagle River, AK
  460. Comment
    EI-18094Lynndeen Knapp
    The option that should be taken out of the picture is the Big Lake route. There is most environmental and cultural damage with this path. There are the wetlands, moose habitat, cranes nesting in this area to be considered. There is the other things such as spliting up the neighborhood, safety with the school and finally the sound carries so far in the quiet of the winter. Please concider the Willow option with more distance from Red shirt Lake. Thank you Lynndeen
    Big Lake, Alaska
  461. Comment
    EI-18093Big Lake Trails, Inc. (501c3 non-profit trail organization for Big Lake Alaska)
    During the April 7, 2010 Public Hearing held in Big Lake, Alaska regarding the MacKenzie railroad project on the STB draft EIS, the STB was asked by the audience if they had seen or read the 2009 Big Lake Comprehensive Plan. Enclosed is the PDF document of the Big Lake Final Plan that the community developed for the long term (20+ year) vision and recommended developments for the Big Lake community. This plan was developed and adopted by Big Lake community stakeholders over many years, extensively reviewed in Public Hearings, and endorsed in 2009 by the Mat-Su Assembly under ordinance as the guiding community planning document. The document can be found online at http://ww1.matsugov.us/index.php?option=com_docman&task=doc_download&gid=1906&It emid=238 and it is also attached electronically for the public record and your consideration. This official planning document for Big Lake is a detailed all-encompassing community planning tool, including existing and future trail strategies that are entirely consistent with the presentation and recommendations made by Big Lake Trails, Inc. (Dan Kruse, Vice President), which is also enclosed in PDF format for your reference and record. Please review the comprehensive planning document as you consider this very important decision as it accurately reflects the opinions and sentiments of the majority in Big Lake and what you heard and was submitted at the Big Lake Public Hearing held on April 7, 2010 with the STB regarding the draft rail project EIS. Restating our April 7, 2010 position, Big Lake Trails, Inc. supports the Willow rail route, with the Big Lake route as a poor second choice, and completely opposes any and all of the Houston rail routes given the severe impacts it will have to the existing MSB approved historic and regionally significant recreational trail system and to a large segment of greater Big Lake area private property owners. Sincerely, Dan Kruse Vice President Big Lake Trails, Inc. trails@biglaketrails.org www.biglaketrails.org
    Dan Kruse · Big Lake, AK
  462. Comment
    EI-18092Royce R. Rock
  463. Comment
    EI-18196Wasilla - April 8, 2010
    Public Meeting Transcripts
  464. Comment
    EI-18124Yvonne Sumner
  465. Comment
    EI-18117Richard C. Sumner
  466. Comment
    EI-18195Big Lake - April 7, 2010
    Public Meeting Transcripts
  467. Comment
    EI-18126Noreen Austermuhl
  468. Comment
    EI-18123Mike Whedbee
  469. Comment
    EI-18122Greg Strong
  470. Comment
    EI-18121Gregory E. Strong
  471. Comment
    EI-18113Big Lake Trails, Inc.
    Dan Mayfield
  472. Comment
    EI-18111Bryan and Lori Ladd
  473. Comment
    EI-18091Phillip Saunders
    Just writing to say I'm in full support of the Alaska rail line extension to Port MacKenzie. Thanks for the opportunity to comment.
    Anchorage, Alaska
  474. Comment
    EI-18090Greg Strong
  475. Comment
    EI-18200Exhibit for 4/6/10 Public Meeting Testimony
    Mike Whedbee
  476. Comment
    EI-18194Anchorage - April 6, 2010
    Public Meeting Transcripts
  477. Comment
    EI-18119Lincon L. Snow, Sr.
  478. Comment
    EI-18116Stuart C. Rader
  479. Comment
    EI-18112Marc Lind
  480. Comment
    EI-18089Ben Demboski
    STB Finance Docket 35095 Alaska Railroad Point Mckenzie rail extension. Please do not build this Extenxion to Willow Alaska. it will cross parklands and ruin Hunting and fishing in the area. My family depends on the Moose and Salmon I get every year from this area. Houston Alaska is a better choice. Respectfully, Ben Demboski
    Chugiak, Alaska
  481. Comment
    EO-1425US Environmental Protection Agency, Region 10
    Kit Brandt
  482. Comment
    EI-18078Alaska State Legislature
    Representative Paul Seaton
  483. Comment
    EI-18076Howard Hancock
    Draft EIS - Alaska Railroad - Port MacKenzie Rail Extension: As a property owner in Willow, AK, the major impacts for me are from 1)train/rail noise, both from initial construction and ongoing future operations and 2)Parks and Recreational/Trails resources. Noise of course will increase for all build alternatives, but the swamps in the Willow route will carry and echo train sound more than other wooded routes to Houston or Big Lake would. Per the DEIS noise would have severe" impacts. More parks and recreational trails will be impacted in the Willow area than in other areas, per the DEIS. I am a frequent winter user of the parks and trails in the Willow area and do not want to see them bisected and disrupted by a rail line. My preference is to see the Mac East, Conn 3, Houston, Houston South or Houston North alternatives. This route would have the least impact on recreational park and trail users and would not impact or create crossings over the Parks highway or Big Lake Road or Willow Creek."
  484. Comment
    EI-18073John Peters
    This Railroad Connection 2 will run right thru my house and my business and storage yard , I oppose this direction for your unneeded spur. Even if it didn't go thru my house and property I would still oppose all the noise pollution that it would bring. I am over a mile away from the main line right now and can hear it's noise. There are alot of houses around here and the most logical route would be the Conn 3 . There is nobody out there. I am sure if you pick conn. 2 you will be meet by protest . My wife and myself have close to thirty years invested in these business's and house and will not just give it away without a fight. John + Teresa Peters Lakeway Woods block 1 lots 11,12,13 (907) 892-7108 (WE HATE NOISE) No On Connection 2 It will go through our storage yard Home and consignment business. This is for our retirement, PLEASE don't go this way. Teresa Peters
    Big Lake, Alaska
  485. Comment
    EI-18072John Peters
    This Railroad Connection 2 will run right thru my house and my business and storage yard , I oppose this direction for your unneeded spur. Even if it didn't go thru my house and property I would still oppose all the noise pollution that it would bring. I am over a mile away from the main line right now and can hear it's noise. There are alot of houses around here and the most logical route would be the Conn 3 . There is nobody out there. I am sure if you pick conn. 2 you will be meet by protest . My wife and myself have close to thirty years invested in these business's and house and will not just give it away without a fight. John + Teresa Peters Lakeway Woods block 1 lots 11,12,13 (907) 892-7108 (WE HATE NOISE)
    Big Lake, Alaska
  486. Comment
    EO-1463Recipients of the Draft EIS
    Draft EIS, Chapter 22, Draft EIS Circulation List
  487. Decision
    40643Chief Of Section Of Environmental Analysis
    PROVIDED NOTICE OF THE AVAILABILITY OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT (EIS) FOR REVIEW AND COMMENT, AND OF PUBLIC MEETINGS ON THE DRAFT EIS IN THIS PROCEEDING.
  488. Comment
    EO-1420U.S. Environmental Protection Agency
    Office of Federal Activities, EIS Filing Section
  489. Comment
    EI-18069National Marine Fisheries Service
    James Balsinger
  490. Comment
    EI-18068Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  491. Comment
    EI-18688Alaska Division of Coastal and Ocean Management
    Melinda O'Donnell
  492. Comment
    EI-18067Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  493. Comment
    EI-18066Alaska Department of Natural Resources - CZMP
    Melinda O'Donnell
  494. Comment
    EI-18064Mat-Su Borough Community Development Department
    Linda Brenner
  495. Comment
    EI-18065Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  496. Comment
    EI-18035Matanuska-Susitna Borough Community Development Dept
    Linda Brenner
  497. Comment
    EO-1419Dorsey Whitney LLP
    Kathryn Kusske Floyd
  498. Comment
    EO-1418Dorsey & Whitney LLP
    Kathryn Kusske Floyd
  499. Comment
    EI-18008Alaska Department of Natural Resources
    Don Perrin
  500. Comment
    EI-18007Mayer Brown
    Kathryn Kusske Floyd
  501. Comment
    EI-17988Mayer Brown
    Kathryn Kusske Floyd
  502. Comment
    EO-1417National Marine Fisheries Service
    Robert Mecum
  503. Comment
    EO-1372Alaska Department of Natural Resources
    Donald Perrin
  504. Comment
    EO-1371Matanuska-Susitna Borough, Community Development
    Linda Brenner
  505. Comment
    EI-17987Mayer Brown
    Kathryn Kusske Floyd
  506. Comment
    EI-17986Mayer Brown
    Kathryn Kusske Brown
  507. Comment
    EI-17985Mayer Brown
    Kathryn Kusske Floyd
  508. Comment
    EO-1370Mayer Brown
    Kathryn Kusske Floyd
  509. Comment
    EO-1369Mayer Brown
    Kathryn Kusske Floyd
  510. Comment
    EI-17984Mayer Brown
    Kathryn Kusske Floyd
  511. Comment
    EO-1368Mayer Brown
    Kathryn Kusske Floyd
  512. Comment
    EO-1367ADNR Division of Coastal and Ocean Management
    Margie Goatley
  513. Decision
    40088Chief Of Section Of Environmental Analysis
    PROVIDED NOTICE OF AVAILABILITY OF THE FINAL SCOPE OF STUDY FOR THE ENVIRONMENTAL IMPACT STATEMENT.
  514. Comment
    EI-17981Point MacKenzie Community Council
    Toby Riddell
  515. Comment
    EI-17983Mayer Brown
    Kathryn Kusske Floyd
  516. Comment
    EI-17982Mayer Brown
    Kathryn Kusske Floyd
  517. Comment
    EI-17980Alaska State Historic Preservation Office
    Judith Bittner
  518. Comment
    EO-1373None
    Robert Chlupach
  519. Comment
    EO-1366Alaska State Historic Preservation Office
    Judith Bittner
  520. Comment
    EI-17979Gary Thompson
  521. Comment
    EI-17978Eklutna, Inc.
    Curtis McQuenn
  522. Comment
    EO-1365Mayer Brown
    Kathryn Kusske Floyd
  523. Comment
    EI-17977Willow Creek Historical Society
    F. LeRoi Heaven
  524. Comment
    EI-18565NOAA - Alaska Region
    Robert Mecum
  525. Comment
    EI-17976Willow Dog Mushers Association
    Erin McLarnon
  526. Decision
    39748Secretary
    DECISION INSTITUTED A PROCEEDING UNDER 49 U.S.C. 10502(B).
  527. Comment
    EO-1364Mayer Brown
    Kathryn Kusske Floyd
  528. Comment
    EO-1363U.S. Fish and Wildlife Service
    Ann Rappaport
  529. Comment
    EO-1362Various Tribal Organizations
    Various Tribal Organizations as Potential Section 106 Consulting Parties
  530. Comment
    EO-1361Various Interested Parties
    Potential Consulting Parties in the Section 106 Process
  531. Comment
    EO-1360Alaska State Historic Preservation Office
    Judith Bittner
  532. Comment
    EO-1359Mayer Brown
    Kathryn Kusske Floyd
  533. Comment
    EO-1358National Marine Fisheries Service
    Kaja Brix
  534. Comment
    EI-17972Ray Debenham
  535. Comment
    EI-17975Mayer Brown
    Kathryn Kusske Floyd
  536. Comment
    EI-17974Mayer Brown
    Kathryn Kusske Floyd
  537. Comment
    EI-17973Mayer Brown
    Kathryn Kusske Floyd
  538. Comment
    EI-17971Matanuska-Susitna Borough
    John Duffy
  539. Comment
    EO-1357Mayer Brown
    Kathryn Kusske Floyd
  540. Comment
    EO-1356Mayer Brown
    Kathryn Kusske Floyd
  541. Motion
    224121Petition For Exemption
    Alaska Railroad Corporation
  542. Comment
    EI-17970Matanuska-Susitna Borough, Planning and Land Use
    Emerson Krueger
  543. Comment
    EI-15639Knikatnu, Inc.
    Raymond Theodore
  544. Comment
    EO-1355Mayer Brown
    Kathryn Kusske Floyd
  545. Comment
    EI-17969Native Village of Tyonek
    Ethan Kaufman
  546. Comment
    EI-13282Mayer Brown
    Kathryn Kusske Floyd
  547. Comment
    EI-13284Alaska State Historic Preservation Office
    Judith Bittner
  548. Comment
    EI-13283Mayer Brown
    Kathryn Kusske Floyd
  549. Comment
    EO-1058Alaska State Historic Preservation Office
    Judith Bittner
  550. Comment
    EI-17968Shaun Debenham
  551. Comment
    EI-7365Willow Area Community Organization
    Linda Oxley
  552. Comment
    EI-7364Friends of the Lakes
    Grace Whedbee
  553. Comment
    EI-7363Roy Debenham
  554. Comment
    EO-1060Mayer Brown
    Kathryn Kusske Floyd
  555. Comment
    EI-7198Lance Baskin
  556. Comment
    EI-13281Mayer Brown
    Kathryn Kusske Floyd
  557. Comment
    EI-7361U.S. Fish and Wildlife Service
    Maureen de Zeeuw
  558. Comment
    EO-1354Mayer Brown
    Kathryn Kusske Floyd
  559. Comment
    EI-7199U.S. Fish and Wildlife Service
    Maureen de Zeeuw
  560. Comment
    EI-7362Lance Baskin
  561. Comment
    EI-7116Greg Strong
  562. Comment
    EI-13280Mayer Brown
    Kathryn Kusske Floyd
  563. Comment
    EI-7055John F. Donohue
  564. Comment
    EI-7054Leslie W. Hosek
  565. Comment
    EI-7001Talkeetna Community Council
    Please see attached letter, also copied here: David Navecky STB Finance Docket No. 35095 Surface Transportation Board 395 E. Street, SW Washington, D.C. 20423 March 21, 2008 Dear Sir: At its regular meeting on March 3, 2008, the Talkeetna Community Council, Inc. Board agreed to send you the following initial comment on the draft Scope of Study/ARRC proposed alternatives for the Port MacKenzie Rail Extension. We agree with and support the Willow Area Community Organization (WACO) in its opposition to the routing of the Port MacKenzie Rail Extension through the community of Willow (Railroad Corridor #3). This route has a potential for serious negative impacts in that it crosses numerous high-use community trails and a large number of anadromous fish streams in area west of Willow. Thank you for considering our input. Sincerely, Ellen M. Wolf Secretary Talkeetna Community Council P.O. Box 608 Talkeetna, AK 99676
    Ellen Wolf · Talk, Alaska
  566. Comment
    EI-6999Robert Stump
    Robert Stump 8133 Summerset Dr. Anchorage Alaska,99518 907-563-0326 David Navecky STB Finance Docket No. FD-35095-0 Surface Transportation Board 395 E Street, SW Washington, DC 205423 I am commenting on the rail connection to Port Mackenzie. To Whom it may concern: I am a long-time resident of Alaska and I have some concerns about the proposed routes for the railroad. I live in Anchorage and own a business there also. In the summer, me, my wife and children enjoy boating and jetskiing in the Big Lake and Willow areas. In the winter we go snow machining in both areas as well. My parents and two sisters live in the Wasilla/Houston areas, as well as my daughter-in-law and two young grandchildren. So, I care very much for the the Valley's development as well as Quality of Lifestyle and Living". I have several concerns about the proposed railroad route. I want to focus on the "Water Resources". The proposed railroad dissects the watershed drainage, and will act as a dam to interrupt the natural flow of surface water. Most of the public land is wetlands. The Wetlands support a plethora of plants and wildlife, as well as the habitat and breeding area. In 2006, rainwater made the lakes rise 18.75", thus, overtopping the lakes. Because there is no public water utility in the area, All are on private wells. Any pollution could contaminate the water supply for the entire area. Since I have so many family members living out in the Valley, I am concerned for their health, if this railroad goes in. I have studied all of the proposed routes, and the direct route to Willow (the one to the west) route makes the most logical sense. This route appears to have the least impact on private land and the least impact on the lake systems and the Trails. Thank you for the opportunity to voice my concerns. Robert Stump 8133 Summerset Drive. Anchorage, Alaska 99518 907-563-9326"
  567. Comment
    EI-6978Steve & Marian Charles
  568. Comment
    EI-6977Mat Su State Parks Citizens Advisory Board
    Mary Anderson
  569. Comment
    EI-6973Patrick L. Sharrock
  570. Comment
    EI-7011Steve Charles
  571. Comment
    EI-7008Friends of the Lakes
    Please find attached the fourth set of pages of petitions with around 600 signatures from the people who live and recreate in the Matanuska-Susitna Borough. These signatures were gathered in just over a week. There was no door-to-door canvassing or booths set up. The petitions were merely set on counters in a few shops and carried by local property owners. The fact that almost everyone who saw the petition signed it with no pressure or additional information (other than the route alternatives map), should demonstrate that the majority of citizens are in favor of the Willow route which has been the official preferred route since 2002. The original signatures will be sent USPS. Additional petitions will be sent later as they are crossing in the mail.
    Grace Whedbee · Big Lake, Ak
  572. Comment
    EI-7007Friends of the Lakes
    Please find attached the third set of pages of petitions with around 600 signatures from the people who live and recreate in the Matanuska-Susitna Borough. These signatures were gathered in just over a week. There was no door-to-door canvassing or booths set up. The petitions were merely set on counters in a few shops and carried by local property owners. The fact that almost everyone who saw the petition signed it with no pressure or additional information (other than the route alternatives map), should demonstrate that the majority of citizens are in favor of the Willow route which has been the official preferred route since 2002. The original signatures will be sent USPS. Additional petitions will be sent later as they are crossing in the mail.
    Grace Whedbee · Big Lake, Ak
  573. Comment
    EI-7006Friends of the Lakes
    Please find attached the second set of pages of petitions with around 600 signatures from the people who live and recreate in the Matanuska-Susitna Borough. These signatures were gathered in just over a week. There was no door-to-door canvassing or booths set up. The petitions were merely set on counters in a few shops and carried by local property owners. The fact that almost everyone who saw the petition signed it with no pressure or additional information (other than the route alternatives map), should demonstrate that the majority of citizens are in favor of the Willow route which has been the official preferred route since 2002. The original signatures will be sent USPS. Additional petitions will be sent later as they are crossing in the mail.
    Grace Whedbee · Big Lake, Ak
  574. Comment
    EI-7005Friends of the Lakes
    Please find attached the first pages of petitions with around 600 signatures from the people who live and recreate in the Matanuska-Susitna Borough. These signatures were gathered in just over a week. There was no door-to-door canvassing or booths set up. The petitions were merely set on counters in a few shops and carried by local property owners. The fact that almost everyone who saw the petition signed it with no pressure or additional information (other than the route alternatives map), should demonstrate that the majority of citizens are in favor of the Willow route which has been the official preferred route since 2002. The original signatures will be sent USPS. Additional petitions will be sent later as they are crossing in the mail.
    Grace Whedbee · Big Lake, Ak
  575. Comment
    EI-7004Kevin Frank
    I would like to express my dissatisfaction with the proposed Houston South route for the Port MacKenzie Rail Extension Project. We own a recreational property nearby and have serious concerns about the impact of having a railway so close. Please keep in mind that this area has many recreational and permanent residents. While we recreate there at our 'weekend' residence, we may one day live there full time. If we did, this would be in keeping with the high rate of growth in the Big Lake area. Continued development needs to be considered not just the present state of the area. We have seen many changes in the recent past and expect the same to continue. While we don't strive to halt 'progress' we worry about how the presence of the rails and their use might compromise the quality of our lives and the value of our property. The area is well known for its winter recreation opportunities. Snow machining is a popular activity. Trails follow former seismic lines and transit the area connecting rural and 'road based' properties. In this instance, the rails will offer a dangerous interruption of existing trails. With young riders in the family, we would prefer there not be any additional distractions, obstacles or hazards. Considering the comment 'impacts fewer developed parcels’, please consider current AND future 'developed' parcels. We are there now and 'fewer' doesn't offer much consultation. Also, the comment 'avoids designated state refuges and recreation areas' doesn't hold as much sway with us as we use much of the public land that is NOT 'designated' and thus are disproportionately impacted. Consider the true future costs of 'moderate expenditure of train energy'. With skyrocketing fuel prices, 'moderate’ could become 'significant'. Also, consider the likely real costs of soil conditions. It would probably be wise to investigate this more thoroughly before making a decision. In short, we do not support the Houston South route since it most greatly impacts us and may represent a greater cost than estimated. Look at future land use projects and population distributions instead of using a static (and likely dated) model of what is 'developed'. We moved out to the area to enjoy the peace and quiet that Anchorage sometimes doesn't offer. We didn't bargain for a railway so near by. Thanks for the opportunity to comment on this matter.
    Anchorage, AK
  576. Comment
    EI-7002Dea Duffus
    Please see attached comments
    Eagle River, Alaska
  577. Comment
    EI-7000Brian Grenier
    Hi, Just commenting that the proposed railway will impact the native moose population to a high degree during years of high snowfall. The moose will seek the railway as it is easier to walk on that route. Once on the railway, they are reluctant to move off as it is difficult to get back up again. Perhaps non-lethal means of removing the moose off the railway could be considered.
    Willow, AK
  578. Comment
    EI-6996Kenneth Whedbee
    Big Lake, Ak
  579. Comment
    EI-6987Friends of the Lakes
    James Pereira
  580. Comment
    EI-6986Doug and Shari Smole
  581. Comment
    EI-6984Doug Smole
  582. Comment
    EI-6983Karen Nugen-Logan
  583. Comment
    EI-6982U.S. Environmental Protection Agency, Region 10
    Melissa Whitaker
  584. Comment
    EI-6981National Marine Fisheries Service
    Robert Mecum
  585. Comment
    EI-6980Donna Quante
  586. Comment
    EI-6979Alaska Department of Natural Resources
    Don Perrin
  587. Comment
    EI-6972Kevin C. Berg
  588. Comment
    EI-6995Grace Whedbee
    Please see 3 letters attached. Hard copy will be sent by USPS.
    Big Lake, Ak
  589. Comment
    EI-6994Wanda Sue Stump
    Wanda Sue Stump 8133 Summerset Dr. Anchorage Alaska,99518 907-349-4672 David Navecky STB Finance Docket No. 35095 Surface Transportation Board 395 E Street, SW Washington, DC 205423 I am commenting on the rail connection to Port Mackenzie. To Whom it may concern: I am a life-time resident of Alaska and I have some concerns about the proposed routes for the railroad. I live in Anchorage and have a business here also. My family, along with my employees, recreate frequently in the Big Lake, and the Willow area. We Boat and Jet Ski and do winter Snow Machining in both areas. We do spend more time in the Big Lake area than in the Willow area, as it is easier and shorter distance than Willow. Since I have lived in Alaska all my life, I have watched the Valley develop. The new rail will foster new development along the route, no matter which route is picked. It will also provide a new route for snow machines, and atv's. I was born 9 months after the 1964 Earthquake" and saw pictures of what happened to my parent's property here in Anchorage after that earthquake. Because of that, I have always been concerned about Earthquakes. The Castle Mountain earthquake fault concerns me with this new railroad going in. It appears that the Houston South route is right over that fault. I wouldn't think this would be a prudent choice, not to mention the proposed rail bed runs through a lot of critical wetlands. I have studied all of the proposed routes, and the direct route to Willow (the one to the west) route makes the most logical sense. This route appears to have the least impact on private land and the least impact on the lake systems and the Trails. Thank you for the opportunity to voice my concerns. Wanda Sue Stump 8133 Summerset Drive. Anchorage, Alaska 99518 907-349-4672"
  590. Comment
    EI-6988Sven and Andrea Haltmann
  591. Comment
    EI-6985Gary Thompson
  592. Comment
    EI-6971Kevin C. Berg
  593. Comment
    EI-6970Daniel Robertson
  594. Comment
    EI-6976Benjamin David Demboski
  595. Comment
    EI-6975Jill Aho
  596. Comment
    EI-6974Dave Demboski
  597. Comment
    EI-6771Friends of the Lakes
    Ben and Laurie Northey
  598. Comment
    EI-6767Alaska Railroad Corporation
    Stephenie Wheeler
  599. Comment
    EI-6751Cynthia Davis
  600. Comment
    EI-6749Kevin C. Berg
  601. Comment
    EI-6761Friends of the Lakes
    Rick Scott
  602. Comment
    EI-6752Jean C. Payne
  603. Comment
    EI-7086Kevin Hite
  604. Comment
    EI-7085Cindy Hite
  605. Comment
    EI-7084Byron Kohfield
  606. Comment
    EI-7083Tom Fondell
  607. Comment
    EI-7082Debbie Lurk
  608. Comment
    EI-7081Ron Lurk
  609. Comment
    EI-7080Jerry Hupp
  610. Comment
    EI-7079Martha A. Valliant
  611. Comment
    EI-7078Bill Seitz
  612. Comment
    EI-7077Ed Barber
  613. Comment
    EI-7076Pat Barber
  614. Comment
    EI-7069Anchorage Scoping Meeting
    Scoping Meeting Transcripts
  615. Comment
    EI-6762Friends of the Lakes
    Susan & Mike Cuzzocreo
  616. Comment
    EI-6757Patrick L. Sharrock
  617. Comment
    EI-7072Wasilla Scoping Meeting
    Scoping Meeting Transcripts
  618. Comment
    EI-6766Willow Area Community Organization
    Linda Oxley
  619. Comment
    EI-6750Grace Whedbee
  620. Comment
    EI-6730Snowy River Ranch
    see attachment
    Edward A. Mccain · Willow, Alaska
  621. Comment
    EI-6765Friends of the Lakes
    Ross Clement
  622. Comment
    EI-6764Freinds of the Lakes
    Carolyn McClintock
  623. Comment
    EI-6763Friends of the Lakes
    Deanna Swaney
  624. Comment
    EI-6759Gregory E. Strong
  625. Comment
    EI-7114Ken Thorall
  626. Comment
    EI-7113Lance Wilson
  627. Comment
    EI-7112Dana Olson
  628. Comment
    EI-7111Jill Parson
  629. Comment
    EI-7073Houston Scoping Meeting
    Scoping Meeting Transcripts
  630. Comment
    EI-6755Brenda Jager
  631. Comment
    EI-6754George Howard
  632. Comment
    EI-6753Kenneth Farmer
  633. Comment
    EI-17966Matanuska-Susitna Borough
    Lynne Woods, Robert Wells, John Duffy
  634. Comment
    EI-7105Paul McLarnon
  635. Comment
    EI-7104Harry Banks
  636. Comment
    EI-7103Brenda McCain
  637. Comment
    EI-7102Willow Chamber of Commerce
    Jim Huston
  638. Comment
    EI-7101Pat Eckhoff
  639. Comment
    EI-7100Charles Wade
  640. Comment
    EI-7099Sarah Richardson
  641. Comment
    EI-7098Tony DeLucia
  642. Comment
    EI-7097Erin McLarnon
  643. Comment
    EI-7096Mellissa Williams
  644. Comment
    EI-7095Willow Dog Mushers Association
    Erin McLarnon
  645. Comment
    EI-7071Willow Scoping Meeting
    Scoping Meeting Transcripts
  646. Comment
    EI-6748Bob Chlupach
  647. Comment
    EI-7094Kevin Berg
  648. Comment
    EI-7093Jill Pock
  649. Comment
    EI-7092Mary J. Walter
  650. Comment
    EI-7091Tina Cardoso
  651. Comment
    EI-7090Noreen Austermuhl
  652. Comment
    EI-7089Lance Wilson
  653. Comment
    EI-7088Dana Olson
  654. Comment
    EI-7087Houston Councilmember
    Roger Purcell
  655. Comment
    EI-7070Big Lake Scoping Meeting
    Scoping Meeting Transcripts
  656. Comment
    EI-6758Gregory E. Strong
  657. Comment
    EI-17967Pat Wilson
  658. Comment
    EI-7110Brian Twohy
  659. Comment
    EI-7108Joseph Roche
  660. Comment
    EI-7107Koreen Robinson
  661. Comment
    EI-7074Knik Scoping Meeting
    Scoping Meeting Transcripts
  662. Comment
    EI-6756David Wurts and TC Wait
  663. Comment
    EI-6760Gregory E. Strong
  664. Comment
    EI-5832Wes Hamrick
  665. Comment
    EO-815U.S. Army Engineers District, Alaska
    Serena Sweet
  666. Comment
    EO-814Alaska Department of Natural Resources
    Donald Perrin
  667. Comment
    EI-5978Steve Wisdorf
    I have 2 major concerns about the Houston routes. These routes pass through the Big Lake Recreational Area and by Horseshoe and West Lake. 1. These two lakes are at the beginning of one of the drainage systems in the area. The lakes are feed directly from the wetland swamps that the rail road will pass through. Also these rainbow trout lakes are a still a few that are not yet invaded by Northern Pike. This railroad on this route would act as a dam and would affect the water flow, temperature, and water level of these two lakes and probably others in the surrounding area and down stream. This would affect the quality of life and create environmental damage. 2. Big Lake is the premier recreation area in the Mat-su Borough. It is also a rapidly growing area. Putting a railroad through this area will create conflict with snow machines and will create noise pollution. This route is passing directly through the most populated and quickest growing areas of all the routes selected. With a growing population and the area with of most use, this route will have the most adverse affects on the community.
    Anchorage, Alaska
  668. Decision
    38793Chief Of Section Of Environmental Analysis
    DECISION PROVIDED (1) NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT; (2) NOTICE OF AVAILABILITY OF THE DRAFT SCOPE OF STUDY FOR THE ENVIRONMENTAL IMPACT STATEMENT; (3) NOTICE OF SCOPING MEETINGS; AND (4) REQUEST FOR COMMENTS ON DRAFT SCOPE.
  669. Comment
    EO-813Federally recognized and other tribal organizations
    Tribal Scoping Letter
  670. Comment
    EO-812Federal, state and local agencies
    Agency Scoping Letter
  671. Comment
    EI-5831Gregory Strong
  672. Comment
    EI-5830Mayer Brown
    Kathryn Kusske Floyd
  673. Comment
    EI-5829Cathi Kramer and Bill O'Hara
  674. Comment
    EO-1059Mayer Brown
    Kathryn Kusske Floyd
  675. Comment
    EO-811Mayer Brown
    Kathryn Kusske Floyd
  676. Comment
    EI-5828Mayer Brown
    Kathryn Kusske Floyd
  677. Comment
    EI-5827Gregory Strong
  678. Comment
    EI-5826Gregory Strong
  679. Comment
    EO-810Mayer Brown
    Kathryn Kusske Floyd
  680. Comment
    EI-5825Mayer Brown
    Kathryn Kusske Floyd
  681. Comment
    EI-5824Big Lake Chamber of Commerce
    Marcy Coman
  682. Comment
    EI-5823Big Lake Community Council
    William O'Hara