Decision 51046
Served (printed as 2/11/2022) · Decision · Entire Board
GRANTED THE PETITIONS OF THE CALIFORNIA HIGH-SPEED RAIL AUTHORITY TO REOPEN TWO CONSTRUCTION EXEMPTION PROCEEDINGS TO CONSIDER AN ADDITION TO THE MERCED TO FRESNO SECTION AND A MODIFICATION TO THE FRESNO TO BAKERSFIELD SECTION OF THE PROPOSED CALIFORNIA HIGH SPEED RAIL SYSTEM.
Read it here The text 51046.pdf ↓
Permanent address docketyard.org/decision/51046 · back to the docket sheet
If the file does not appear here, open it in its own tab (some phones show only the first page inside a frame).