AB 1068
Docket Yard · docketyard.org/d/AB-1068 · entries shown: all, newest first
This docket has not yet been observed directly in the Board’s dockets table; its entries below come from filings and decisions that name it.
Caption from the Board’s record. Sub-dockets, included below: AB 1068-X, AB 1068 (Sub-No. 1X), AB 1068 (Sub-No. 2X), AB 1068 (Sub-No. 3X)
49 filings, 32 decisions and 89 environmental comments observed here; last checked 11 Oct 2026, 00:36 UTC; last new entry 31 Aug 2026, 20:39 UTC.
Entries
-
(printed as 12/15/2021)TrailMissouri Central Railroad Company, Missouri Department of Natural Resources
-
(printed as 4/21/2020)SubstitutionMissouri Department of Natural Resources
-
(printed as 2/13/2020)CommentJackie Rodgers
-
(printed as 2/3/2020)CommentJackie Rodgers
-
(printed as 12/20/2019)TrailMissouri Central Railroad Company, Missouri Central Railroad Company, Missouri Department of Natural Resources
-
served (printed as 8/14/2019)DecisionDECISION GRANTED AN EXTENSION OF THE INTERIM TRAIL USE NEGOTIATING PERIOD IN THIS PROCEEDING UNTIL DECEMBER 31, 2019.
-
(printed as 7/29/2019)RequestMissouri Department Of Natural Resources, Missouri Central Railroad Company
-
served (printed as 2/7/2019)DecisionDECISION GRANTED AN EXTENSION OF THE INTERIM TRAIL USE NEGOTIATING PERIOD IN THIS PROCEEDING UNTIL AUGUST 20, 2019.
-
(printed as 1/28/2019)RequestMissouri Department Of Natural Resources, Missouri Central Railroad Company
-
(printed as 5/11/2018)CommentSandra L.Brown
-
served (printed as 1/19/2018)DecisionDECISION GRANTED AN EXTENSION OF THE INTERIM TRAIL USE NEGOTIATING PERIOD UNTIL FEBRUARY 21, 2019.
-
(printed as 12/4/2017)RequestMissouri Department Of Natural Resources, Missouri Central Railroad Company
-
served (printed as 12/23/2016)DecisionDECISION GRANTED MISSOURI DEPARTMENT OF NATURAL RESOURCES' AND MISSOURI CENTRAL RAILROAD COMPANY'S REQUEST FOR AN EXTENSION OF TIME TO NEGOTIATE INTERIM TRAIL USE UNTIL FEBRUARY 21, 2018
-
(printed as 11/30/2016)RequestMissouri Department Of Natural Resources, Missouri Central Railroad Company
-
(printed as 7/8/2016)CommentSandra Brown
-
(printed as 6/3/2016)Comment
-
(printed as 6/3/2016)CommentAlan Reinkemeyer
-
(printed as 6/2/2016)CommentI am looking for any environmental assessment or plan for the railroad abandonment of the former Rock Island Railroad (now owned by AmerenUE) in Missouri. I own property adjoining the line and there is an endangered species of bat. I was told in a public meeting the rail clearing activities were to be done in the winter months but the crews were still clearing in my area just a few weeks ago. I want a copy of this plan as our property also adjoins the Bat Cave Conservation area (home to endangered Indiana Grey and Longear bats). We enjoy viewing the bats in the evening and I have deep concerns the human encroachment this project has brought and will bring will be detrimental. Please forward to mail me a copy of the plan. ThanksSt. Thomas, MO
-
(printed as 4/6/2016)CommentRebecca McKinstry
-
(printed as 3/29/2016)NoticeMissouri Department Of Natural Resources
-
served (printed as 2/19/2016)DecisionDECISION GRANTED MISSOURI DEPARTMENT OF NATURAL RESOURCES' AND MISSOURI CENTRAL RAILROAD COMPANY'S REQUEST FOR AN EXTENSION OF TIME TO NEGOTIATE INTERIM TRAIL USE UNTIL FEBRUARY 21, 2017.
-
(printed as 1/27/2016)RequestMissouri Central Railroad Company, Missouri Department Of Natural Resources
-
(printed as 11/9/2015)CommentSandra Brown
-
(printed as 10/29/2015)CommentNajah Duvall-Gabriel
-
(printed as 10/26/2015)CommentDr. Andrea Hunter, THPO
-
(printed as 10/12/2015)CommentSandra Brown
-
(printed as 10/5/2015)CommentAndrea Hunter
-
(printed as 10/2/2015)CommentAndrea Hunter
-
(printed as 10/1/2015)CommentAndrea Hunter
-
served (printed as 9/23/2015)DecisionDECISION REOPENED THIS PROCEEDING AND REMOVED A PREVIOUSLY IMPOSED CONDITION.
-
(printed as 9/3/2015)Comment
-
(printed as 8/25/2015)CommentSandra Brown
-
(printed as 8/25/2015)CommentSandra Brown
-
(printed as 8/25/2015)CommentSandra Brown
-
(printed as 8/12/2015)Comment
-
served (printed as 8/11/2015)DecisionDECISION: (1) REOPENED THIS PROCEEDING; AND (2) ADDED TWO NEW CONDITIONS TO THE NOTICE SERVED AND PUBLISHED IN THE FEDERAL REGISTER ON DECEMBER 8, 2014.
-
served (printed as 8/10/2015)DecisionDECISION GRANTED AN EXTENSION OF TIME.
-
(printed as 7/30/2015)RequestMissouri Central Railroad Company, Missouri Department Of Natural Resources
-
(printed as 7/28/2015)Comment
-
(printed as 7/21/2015)CommentToni Prawl
-
(printed as 6/25/2015)CommentLaShavio Johnson
-
(printed as 6/16/2015)CommentZuzana Chovanec
-
(printed as 6/9/2015)CommentZuzana Chovanec
-
(printed as 6/8/2015)CommentZuzana Chovanec
-
(printed as 6/4/2015)CommentNajah Duvall-Gabriel
-
(printed as 5/19/2015)CommentLaShavio Johnson
-
(printed as 5/12/2015)CommentShauna Marquardt
-
(printed as 5/7/2015)CommentJohn Fowler
-
(printed as 5/5/2015)CommentChris Wieberg, Chief
-
(printed as 5/1/2015)CommentSharon Fry
-
(printed as 4/20/2015)CommentCynthia Stacy
-
(printed as 4/15/2015)CommentAnthony Koch
-
(printed as 3/27/2015)Comment
-
(printed as 3/27/2015)CommentTribe Consulting Party Ltrs
-
(printed as 3/25/2015)CommentSandra Brown
-
(printed as 3/25/2015)CommentSandra Brown
-
(printed as 3/23/2015)CommentSandra Brown
-
(printed as 3/23/2015)CommentAmy Salveter
-
(printed as 3/23/2015)CommentSandra Brown
-
served (printed as 2/26/2015)DecisionDECISION DENIED REQUESTS FOR A STAY AND FOR PUBLIC HEARINGS, AND IMPOSES INTERIM TRAIL USE AND PUBLIC USE CONDITIONS BECAUSE THE STATUTORY REQUIREMENTS TO INVOKE THE TRAILS ACT AND THE PUBLIC USE CONDITION HAVE BEEN MET.
-
(printed as 2/20/2015)TrailMissouri Central Railroad Company, Missouri Department Of Natural Resources
-
(printed as 2/19/2015)LetterMissouri Central Railroad Company
-
(printed as 2/13/2015)LetterMissouri Farm Bureau Federation
-
(printed as 1/20/2015)CommentMark A. Miles
-
(printed as 1/13/2015)Comment
-
(printed as 1/12/2015)StatementRails To Trails Conservancy
-
(printed as 1/9/2015)StatementMissouri Rock Island Trail
-
(printed as 1/9/2015)StatementMissouri Bicycle And Pedestrian Federation
-
(printed as 1/8/2015)Comment
-
served (printed as 1/7/2015)DecisionDECISION CORRECTED THE DECISION SERVED ON JANUARY 6, 2015 IN THIS PROCEEDING.
-
served (printed as 1/6/2015)DecisionDECISION: (1) REOPENED THIS PROCEEDING; (2) PERMITTED THE NOTICE IN THIS PROCEEDING TO BECOME EFFECTIVE, TO THE EXTENT MISSOURI FARM BUREAU FEDERATION'S STAY REQUEST IS DIRECTED AT THE EXEMPTION; AND (3) FOUND THAT THE NOTICE SERVED AND PUBLISHED IN THIS PROCEEDING ON DECEMBER 8, 2015, IS SUBJECT TO CERTAIN CONDITIONS.
-
(printed as 1/5/2015)CommentSandra Brown
-
(printed as 1/5/2015)Comment
-
(printed as 12/31/2014)MotionMissouri Department Of Natural Resources
-
(printed as 12/29/2014)CommentLeslie Holloway · Jefferson City, Missouri
-
(printed as 12/22/2014)ReplyMissouri Central Railroad Company
-
(printed as 12/17/2014)StatementHonorable Vicky Hartzler
-
(printed as 12/17/2014)CommentsMissouri Farm Bureau Federation
-
(printed as 12/17/2014)TrailMissouri Department Of Natural Resources
-
(printed as 12/17/2014)ReplyMissouri Central Railroad Company
-
(printed as 12/17/2014)CommentBlake Hurst, President
-
served (printed as 12/12/2014)DecisionDECISION DETERMINED THAT THE ENVIRONMENTAL IMPACT STATEMENT PROCESS IS UNNECESSARY AND INVITED THE PUBLIC TO COMMENT.
-
served (printed as 12/10/2014)DecisionDECISION GRANTED AN EXTENSION IN THIS PROCEEDING.
-
served (printed as 12/8/2014)DecisionPROVIDED NOTICE THAT MISSOURI CENTRAL RAILROAD COMPANY (MCRR) AND CENTRAL MIDLAND RAILWAY COMPANY (CMR) HAVE JOINTLY FILED A NOTICE OF EXEMPTION FOR MCRR TO ABANDON, AND FOR CMR TO DISCONTINUE SERVICE OVER APPROXIMATELY 144.3 MILES OF RAIL LINE IN MISSOURI.
-
(printed as 12/1/2014)RequestMissouri Department Of Natural Resources
-
(printed as 11/20/2014)Comment
-
(printed as 11/18/2014)NoticeMissouri Central Railroad Company And Central Midland Railway Company
-
(printed as 10/29/2014)CommentMark A. Miles
-
(printed as 10/28/2014)EnvironmentalMissouri Central Railroad Company
-
served (printed as 6/18/2014)DecisionDECISION GRANTED AN EXTENSION OF TIME.
-
(printed as 6/10/2014)RequestMissouri Department Of Natural Resources, Missouri Central Railroad Company
-
(printed as 2/24/2014)CommentMark A. Miles
-
(printed as 2/11/2014)CommentJudith Deel
-
(printed as 2/11/2014)CommentDavid Benz
-
(printed as 2/10/2014)CommentDavid Benz
-
served (printed as 1/8/2014)DecisionDECISION GRANTED AN EXTENSION OF TIME IN THIS PROCEEDING.
-
(printed as 12/19/2013)MotionMissouri Central Railroad Company
-
served (printed as 12/11/2013)DecisionDECISION REOPENED THIS PROCEEDING AND REMOVED A CONDITION IMPOSED IN THE JULY 8, 2013 DECISION OF THIS PROCEEDING.
-
served (printed as 12/6/2013)DecisionPROVIDED NOTICE THAT MISSOURI CENTRAL RAILROAD COMPANY AND CENTRAL MIDLAND RAILWAY COMPANY FILED A NOTICE OF EXEMPTION TO DISCONTINUE TRACKAGE RIGHTS OVER A RAIL LINE OWNED BY THE UNION PACIFIC RAILROAD COMPANY BETWEEN PLEASANT HILL, MO., AND LEEDS JUNCTION, MO.
-
(printed as 11/22/2013)Comment
-
(printed as 11/18/2013)SupplementMissouri Central Railroad Company
-
(printed as 11/7/2013)LetterMissouri Central Railroad Company
-
(printed as 10/30/2013)CorrectionMissouri Central Railroad Company
-
(printed as 10/30/2013)SupplementMissouri Central Railroad Company,
-
(printed as 10/25/2013)CommentNajah Duvall-Gabriel
-
(printed as 10/17/2013)NoticeMissouri Central Railroad Company
-
(printed as 9/5/2013)CommentCharles Henderson
-
(printed as 8/27/2013)CommentLaShavio Johnson
-
served (printed as 8/12/2013)DecisionDECISION: (1) REOPENED THIS PROCEEDING; AND (2) DETERMINED THAT THE EXEMPTION OF THE ABANDONMENT OF THE LINE IN THIS PROCEEDING IS SUBJECT TO A CONDITION PROPOSED IN AN ENVIRONMENTAL ASSESSMENT.
-
(printed as 8/8/2013)Comment
-
(printed as 7/16/2013)Comment
-
(printed as 7/12/2013)CommentShauna Marquardt
-
(printed as 7/12/2013)CommentJames Helgason · Lees Summit, Missouri
-
(printed as 7/11/2013)CommentSara VanderFeltz
-
served (printed as 7/8/2013)DecisionDECISION: (1) REOPENED THIS PROCEEDING; AND (2) MODIFIED THE NOTICE SERVED AND PUBLISHED ON JUNE 7, 2013, IN THIS PROCEEDING.
-
(printed as 6/19/2013)ReplyMissouri Central Railroad Company
-
served (printed as 6/14/2013)DecisionDECISION DETERMINED THAT THE ENVIRONMENTAL IMPACT STATEMENT PROCESS IS UNNECESSARY AND INVITED PUBLIC COMMENT.
-
(printed as 6/14/2013)TrailMissouri Department Of Natural Resources
-
served (printed as 6/7/2013)DecisionPROVIDED NOTICE THAT MISSOURI CENTRAL RAILROAD COMPANY (MCRR) AND CENTRAL MIDLAND RAILWAY COMPANY (CMR) FILED A NOTICE OF EXEMPTION FOR MCRR TO ABANDON AND FOR CMR TO DISCONTINUE SERVICE OVER, APPROXIMATELY 42 MILES OF RAIL LINE BETWEEN MILEPOST 257.283 NEAR WINGATE, IN CASS COUNTY, MO., AND MILEPOST 215.325 NEAR WINDSOR, IN PETTIS COUNTY, MO.
-
(printed as 5/20/2013)NoticeMissouri Central Railroad Company
-
(printed as 3/26/2013)EnvironmentalMissouri Central Railroad Company
-
(printed as 10/31/2012)TrailMissouri Department Of Natural Resources, Missouri Central Railroad Company
-
served (printed as 9/18/2012)DecisionDECISION GRANTED MISSOURI DEPARTMENT OF NATURAL RESOURCES' REQUEST FOR AN EXTENSION OF TIME FOR THE PARTIES TO FINALIZE AND CLOSE ON A TRAIL USE AGREEMENT AND ADDITIONAL TIME TO FULFILL AND REMOVE THE APPLICABLE ENVIRONMENTAL CONDITIONS RELATED TO THE RAIL LINE ABANDONMENT IN THIS PROCEEDING.
-
(printed as 9/12/2012)Comment
-
(printed as 9/11/2012)CommentSandra Brown
-
(printed as 9/4/2012)RequestDepartment Of Natural Resources, Missouri Central Railroad Company
-
(printed as 7/18/2012)CommentJames Munkres
-
(printed as 7/9/2012)CommentSandra Brown
-
(printed as 7/9/2012)CommentMark A. Miles
-
(printed as 6/22/2012)CommentSandra Brown
-
served (printed as 5/25/2012)DecisionDECISION GRANTED AN EXTENSION FOR NEGOTIATING A TRAIL USE/RAIL BANKING AGREEMENT UNTIL SEPTEMEBER 17, 2012.
-
(printed as 5/16/2012)RequestMissouri Department Of Natural Resources, Missouri Central Railroad Company
-
served (printed as 3/13/2012)DecisionDECISION REOPENED THE PROCEEDING AND REMOVED A SECTION 106 CONDITION, BUT KEPT IN EFFECT CONDITIONS RECOMMENDED BY THE BOARD'S OFFICE OF ENVIRONMENTAL ANALYSIS.
-
served (printed as 3/6/2012)DecisionDECISION GRANTED A MOTION TO EXTEND TIME TO NEGOTIATE INTERIM TRAIL USE FOR AN ADDITIONAL 90 DAY PERIOD, OR UNTIL JUNE 19, 2012.
-
(printed as 3/2/2012)Misc.Thompson Hine Llp, Etal
-
(printed as 3/1/2012)RequestMissouri Central Railroad Company, Missouri Department Of Natural Resources
-
(printed as 2/23/2012)CommentNajoah Duvall-Gabriel
-
(printed as 2/23/2012)Comment
-
(printed as 2/21/2012)CommentNajah Duvall-Gabriel
-
(printed as 1/17/2012)CommentMark Randall, City Administrator
-
(printed as 1/17/2012)CommentFrank Hecksher
-
(printed as 1/17/2012)CommentDr. Andrea Hunter
-
(printed as 1/17/2012)CommentJane A. Lale
-
(printed as 1/17/2012)CommentJudith Deel
-
(printed as 1/17/2012)CommentSandra Brown
-
served (printed as 12/16/2011)DecisionDECISION GRANTED MOTION TO EXTEND TIME TO NEGOTIATE INTERIM TRAIL USE UNTIL FOR AN ADDITIONAL 90 DAY PERIOD.
-
(printed as 12/12/2011)RequestMissouri Central Railroad Company, Missouri Department Of Natural Resources
-
(printed as 8/19/2011)CommentLaShavio Johnson
-
(printed as 8/17/2011)CommentJohn P. Froman, Chief
-
served (printed as 8/10/2011)DecisionDECISION GRANTED MISSOURI DEPARTMENT OF NATURAL RESOURCES' REQUEST TO EXTEND THE NOTICE OF INTERIM TRAIL USE NEGOTIATING PERIOD TO DECEMBER 22, 2011.
-
(printed as 8/9/2011)CommentLaShavio Johnson
-
(printed as 7/20/2011)RequestMissouri Central Railroad Company, Missouri Department Of Natural Resources
-
(printed as 6/27/2011)CommentLaShavio Johnson
-
served (printed as 6/21/2011)DecisionDECISION GRANTED THE REQUEST TO EXTEND THE NOTICE OF INTERIM NEGOTIATING PERIOD FROM JUNE 25, 2011, TO JULY 25, 2011.
-
(printed as 6/20/2011)Comment
-
(printed as 6/15/2011)CommentJohn M. Fowler, Executive Director
-
(printed as 6/14/2011)RequestDepartment Of Natural Resources
-
served (printed as 12/27/2010)DecisionDECISION REOPENED THE PROCEEDING AND IMPOSED CONDITIONS RECOMMENDED BY THE BOARD'S OFFICE OF ENVIRONMENTAL ANALYSIS.
-
(printed as 12/21/2010)Comment
-
(printed as 12/17/2010)ReplyMissouri Central Railroad Company
-
served (printed as 12/3/2010)DecisionCONCLUDED THAT THE ENVIRONMENTAL IMPACT STATEMENT PROCESS IS UNNECESSARY AND INVITED PUBLIC COMMENT.
-
served (printed as 11/26/2010)DecisionPROVIDED NOTICE THAT MISSOURI CENTRAL RAILROAD COMPANY AND CENTRAL MIDLAND RAILWAY COMPANY (CMR) HAVE FILED A JOINT NOTICE OF EXEMPTION TO ABANDON AND DISCONTINUE, AND FOR CMR TO DISCONTINUE, SERVICE OVER 5.6 MILES OF RAIL LINE IN CASS COUNTY, MO.
-
(printed as 11/22/2010)CommentMark Miles
-
(printed as 11/18/2010)CorrectionMissouri Central Railroad Company
-
(printed as 11/18/2010)Comment
-
(printed as 11/9/2010)TrailMissouri Department Of Natural Resources
-
(printed as 11/8/2010)NoticeMissouri Central Railroad Company
-
(printed as 10/26/2010)CommentSara VenderFeltz
-
(printed as 10/20/2010)CommentGary Mallory
-
(printed as 10/8/2010)EnvironmentalMissouri Central Railroad Company