Decision 51993
Served (printed as 1/5/2024) · Environmental Review · Director, Office Of Environmental Analysis
PROVIDED A DRAFT ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED CONSTRUCTION AND OPERATION OF A NEW 5,000-FOOT RAIL LINE IN SUFFOLK COUNTY, N.Y.
Read it here The text 51993.pdf ↓
Permanent address docketyard.org/decision/51993 · back to the docket sheet
If the file does not appear here, open it in its own tab (some phones show only the first page inside a frame).