Display Kept in this browser only
FD 36346 · WISCONSIN CENTRAL LTD.--OPERATION EXEMPTION--HALLETT DOCK NO. 5 IN DULUTH, MINN.

Decision 50142

Served (printed as 2/26/2020) · Decision · Entire Board

DECISION GRANTED WISCONSIN CENTRAL LTD. THE AUTHORITY TO OPERATE A RAIL/WATER DOCK FACILITY, KNOWN AS HALLETT DOCK NO. 5, LOCATED IN DULUTH, MINN.

Read it here The text 50142.pdf ↓

Permanent address docketyard.org/decision/50142 · back to the docket sheet

If the file does not appear here, open it in its own tab (some phones show only the first page inside a frame).