Display Kept in this browser only
EP 290 (Sub-No. 4) · RAILROAD COST RECOVERY PROCEDURES-PRODUCTIVITY ADJUSTMENT

Decision 42181

Served (printed as 2/6/2012) · Decision · Entire Board

DECISION PROPOSED TO ADOPT 1.008 AS THE MEASURE OF AVERAGE CHANGE IN RAILROAD PRODUCTIVITY FOR THE 2006-2010 PERIOD. THIS REPRESENTS A 0.6% DECREASE OVER THE AVERAGE FOR THE 2005-2009 PERIOD.

Read it here The text 42181.pdf ↓

Permanent address docketyard.org/decision/42181 · back to the docket sheet

If the file does not appear here, open it in its own tab (some phones show only the first page inside a frame).