EP 290 (Sub-No. 4) · RAILROAD COST RECOVERY PROCEDURES-PRODUCTIVITY ADJUSTMENT

Decision 39704

Served (printed as 2/5/2009) · Decision · Entire Board

DECISION PROPOSED TO ADOPT A 2009 PRODUCTIVITY VALUE OF 1.2% PER YEAR AS THE MEASURE OF AVERAGE CHANGE IN RAILROAD PRODUCTIVITY FOR THE 2003-2007 AVERAGING PERIOD. THIS VALUE IS A DECLINE OF 0.1% FROM THE CURRENT MEASURE OF 1.3% THAT WAS DEVELOPED FOR THE 2002-2006 PERIOD.