Decision 39212
Served (printed as 7/25/2008) · Notice of Exemption · Director Of Proceedings
PROVIDED NOTICE THAT FPN-USA, INC. FILED A NOTICE OF EXEMPTION TO OPERATE AN APPROXIMATELY 44.6-MILE LINE OF RAILROAD KNOWN AS THE TIJUANA-TECATE SHORTLINE IN MEXICO; AND TO ACQUIRE INCIDENTAL TRACKAGE RIGHTS OVER THE LINE BEING OPERATED BY CARRIZO GORGE RAILWAY, INC. BETWEEN DIVISION AND CAMPO, CA.
Read it here The text 39212.pdf ↓
Permanent address docketyard.org/decision/39212 · back to the docket sheet
If the file does not appear here, open it in its own tab (some phones show only the first page inside a frame).