EP 290 (Sub-No. 4) · RAILROAD COST RECOVERY PROCEDURES-PRODUCTIVITY ADJUSTMENT

Decision 38816

Served (printed as 2/22/2008) · Decision · Entire Board

DECISION ADOPTED A 2008 PRODUCTIVITY VALUE OF 0.8%. THIS IS 0.9 OF A PERCENTAGE POINT LOWER THAN THE CURRENT VALUE THAT WAS DEVELOPED FOR THE 2001-2005-YEAR PERIOD OF 1.7%.

Read it here The text 38816.pdf ↓