Display Kept in this browser only
EP 290 (Sub-No. 4) · RAILROAD COST RECOVERY PROCEDURES-PRODUCTIVITY ADJUSTMENT

Decision 36631

Served (printed as 1/26/2006) · Decision · Entire Board

PROPOSED TO ADOPT 1.019 (1.9%) AS THE MEASURE OF AVERAGE CHANGE IN RAILROAD PRODUCTIVITY FOR THE 2000-2004 (5-YEAR) PERIOD. THE CURRENT VALUE OF 2.9% WAS DEVELOPED FOR THE 1999 TO 2003 PERIOD.

Read it here The text 36631.pdf ↓

Permanent address docketyard.org/decision/36631 · back to the docket sheet

If the file does not appear here, open it in its own tab (some phones show only the first page inside a frame).