Decision 32529
Served (printed as 2/8/2002) · Decision · Director Of Proceedings
EXTENDED THE NITU NEGOTIATING PERIOD FOR A PORTION OF THE RAILROAD LINE BETWEEN MILEPOST 359.0 AT PITTSBURG AND MILEPOST 365.0 AT CHEROKEE TO JUNE 30, 2002.
Read it here The text 32529.pdf ↓
Permanent address docketyard.org/decision/32529 · back to the docket sheet
If the file does not appear here, open it in its own tab (some phones show only the first page inside a frame).