Display Kept in this browser only
FD 33877 · ILLINOIS CENTRAL RAILROAD COMPANY--CONSTRUCTION AND OPERATION EXEMPTION--IN EAST BATON ROUGE PARISH, LA

Decision 32284

Served (printed as 1/23/2002) · Decision · Entire Board

ADOPTED THE MITIGATION MEASURES AND IMPOSED THEM AS A CONDITION TO THE EXEMPTION GRANTED.

Read it here The text 32284.pdf ↓

Permanent address docketyard.org/decision/32284 · back to the docket sheet

If the file does not appear here, open it in its own tab (some phones show only the first page inside a frame).