Display Kept in this browser only
FD 33888 · TRI-CITY RAILROAD COMPANY, L.L.C.--LEASE AND OPERATION EXEMPTION--RAIL LINE OF PORT OF BENTON IN RICHLAND, WA

Decision 31116

Served (printed as 6/23/2000) · Notice · Director Of Proceedings

NOTICE THAT TRI-CITY HAS FILED A VERIFIED NOTICE OF EXEMPTION UNDER 49 CFR 1150.31 TO LEASE FROM THE PORT OF BENTON (POB) AND OPERATE APPROXIMATELY 17 MILES OF RAIL LINE CURRENTLY OWNED BY THE POB, KNOWN AS THE HANFORD SITE RAIL SYSTEM, SOUTHERN CONNECTION EXTENDING FROM MILEPOST 46.6 AT THE JUNCTION WITH THE UNION PACIFIC RAIL LINE IN RICHLAND, WA, TO MILEPOST 28.3 AT THE BORDER TO THE U.S. DEPARTMENT OF ENERGY'S HANFORD SITE, CONNECTING WITH THE HANFORD SITE RAIL SYSTEM, NORTHERN CONNECTION (NORTH OF THE CITY OF RICHLAND).

Read it here The text 31116.pdf ↓

Permanent address docketyard.org/decision/31116 · back to the docket sheet

If the file does not appear here, open it in its own tab (some phones show only the first page inside a frame).