Decision 31065
Served (printed as 6/23/2000) · Decision · Director Of Proceedings
(1) REOPENED THE ABOVE PROCEEDING, AND (2) ORDERED, THE EXEMPTION OF THE ABANDONMENT OF THE RAIL LINE DESCRIBED ABOVE IS SUBJECT TO THE CONDITIONS THAT CSXT SHALL: (A) BE PROHIBITED FROM CONDUCTING SALVAGE OPERATIONS BETWEEN THE PERIODS OF APRIL 15 THRU SEPTEMBER 15 TO PREVENT THE POSSIBLE INCIDENTAL TAKE OF THE ENDANGERED SPECIES LOCATED WITHIN THE RIGHT-OF-WAY; (B) BE PROHIBITED FROM CONDUCTING IN-CHANNEL WORK DURING THE FISH-SPAWNING SEASON FROM APRIL 1 THRU JUNE 30 AND BEST MANAGEMENT PRACTICES SHALL BE USED TO AVOID OR MINIMIZE RUNOFF OF SEDIMENT OR TOXIC SUBSTANCES INTO THE WATERWAYS; (C) PRIOR TO SALVAGE OPERATIONS CONSULT WITH THE FWS TO DEVISE A PLAN SO THAT SALVAGE OPERATIONS WOULD AVOID ALL WETLANDS IMPACTS INCLUDING DRAINAGE, FILLING, TREE CLEARING, AND DISPOSAL OF DEBRIS OCCURRING WITHIN THE PROPOSED PROJECT AREA; AND (D) RETAIN ITS INTEREST IN AND TAKE NO STEPS TO ALTER THE HISTORIC INTEGRITY OF THE WABASH RIVER BRIDGE AND THE CH&D DEPOT UNTIL COMPLETION OF THE SECTION 1
Read it here The text 31065.pdf ↓
Permanent address docketyard.org/decision/31065 · back to the docket sheet
If the file does not appear here, open it in its own tab (some phones show only the first page inside a frame).