Decision 30780
Served (printed as 2/8/2000) · Decision · Director Of Proceedings
(1) REOPENED THIS PROCEEDING AND (2) DIRECTED SOO LINE TO CONSULT WITH THE NATIONAL GEODETIC SURVEY (NGS) AND PROVIDE NGS WITH 90 DAYS' NOTICE PRIOR TO DISTURBING OR DESTROYING ANY GEODETIC STATION MARKERS.
Read it here The text 30780.pdf ↓
Permanent address docketyard.org/decision/30780 · back to the docket sheet
If the file does not appear here, open it in its own tab (some phones show only the first page inside a frame).