EP 290 (Sub-No. 4) · RAILROAD COST RECOVERY PROCEDURES-PRODUCTIVITY ADJUSTMENT

Decision 30740

Served (printed as 1/27/2000) · Decision · Entire Board

PROPOSED THE ADOPTION OF A 2000 PRODUCTIVITY VALUE OF 3.5% , WHICH IS 2.1% LOWER THAN THE VALUE DEVELOPED FOR THE 1993-1997 5-YEAR PERIOD CURRENTLY USED OF 5.7%.