Decision 30103
Served (printed as 3/31/1999) · Decision · Director Of Proceedings
(1) RECOMMENDED THAT A CONDITION BE IMPOSED REQUIRING RRVW TO CONSULT WITH THE NGS AND PROVIDE NGS WITH 90 DAYS NOTICE PRIOR TO DISTURBING OR DESTROYING ANY GEODETIC MARKERS; AND (2) REOPENED THIS PROCEEDING.
Read it here The text 30103.pdf ↓
Permanent address docketyard.org/decision/30103 · back to the docket sheet
If the file does not appear here, open it in its own tab (some phones show only the first page inside a frame).