Comment EI-31580
Received or sent (printed as 12/22/2021)
No I do not want this project to go through. It will tie up all railroad crossings g too long and change the metro schedule to Chicago. I frequently take the train to Chicago and also travel across several railroad crossings frequently and do not want to sit for 19-20 minutes for freight trains. (Received via project website)
Submitted by: Donna Zuttermeister · Roselle, IL
The Board publishes this comment in its environmental-comment table for this proceeding. It is quoted here as printed; nothing is inferred from it, and it states the commenter's own position in their own words, not this record's.
Permanent address docketyard.org/d/FD-36500/comment/EI-31580 · back to the docket sheet