Display Kept in this browser only
FD 30186 · TONGUE RIVER RAILROAD COMPANY, INC.--RAIL CONSTRUCTION AND OPERATION--IN CUSTER, POWDER RIVER AND ROSEBUD COUNTIES, MONT.

Comment EI-19489

Received or sent (printed as 1/7/2013)

As a citizen inside of the area to be affected by the proposed Cherry Point coal terminal I would like to express my opposition to this project.I work in the energy sector as a Union Millwright,working the western US .I have seen alot facilities,they are short time boons with long term consequences.The people and the industry leave blemishes all over the country and then walk away.They are trying to limit the scopeing because if you and I look at the big picture we would not put up with the shortsighted nature of these projects.Please look at the total project and its consequences. As someone who makes my living from this type of work I have a better perspective than most. No matter what the promises are the all mighty dollar will control what is fulfilled and what is not .The short term work and economic gains fall well short of sustainable, with the gains walking off in a very few pockets,the mess will be left for the rest of us to clean up,some and alot of it permanent. Sincerely Peter Tamsky

Submitted by: Peter Tamsky · Concrete, Washington

The Board publishes this comment in its environmental-comment table for this proceeding. It is quoted here as printed; nothing is inferred from it, and it states the commenter's own position in their own words, not this record's.

Permanent address docketyard.org/d/FD-30186/comment/EI-19489 · back to the docket sheet