FD 36447
Docket Yard · docketyard.org/d/FD-36447 · entries shown: all, newest first
LAKE PROVIDENCE PORT COMMISSION--FEEDER LINE APPLICATION--LINE OF DELTA SOUTHERN RAILROAD LOCATED IN EAST CARROLL AND MADISON PARISHES, LA.
Caption from the Board’s record.
178 filings, 33 decisions and 0 environmental comments observed here; last checked 10 Oct 2026, 21:36 UTC; last new entry 1 Oct 2026, 12:33 UTC.
Entries
-
(printed as 9/30/2026)Letter312602LetterDelta Southern Railroad, Inc.
-
(printed as 9/30/2026)Letter312578LetterLake Providence Port Commission
-
(printed as 9/11/2026)Notice312303NoticeDelta Southern Railroad, Inc.
-
served (printed as 9/2/2026)Decision53180Entire Board(1) DENIED AN APPEAL OF TWO DISCOVERY RULINGS BY AN ADMINISTRATIVE LAW JUDGE; AND (2) AUTHORIZED DELTA SOUTHERN RAILROAD, INC., TO REOPEN TWO DEPOSITIONS FOR THE LIMITED PURPOSE OF QUESTIONING THOSE WITNESSES ABOUT CERTAIN NEWLY DISCLOSED INFORMATION.
-
(printed as 8/25/2026)Report311985Status ReportDelta Southern Railroad, Inc.
-
(printed as 7/24/2026)Letter311839LetterLake Providence Port Commission
-
(printed as 7/21/2026)Comments311809CommentsDelta Southern Railroad, Inc.
-
(printed as 7/10/2026)Reply311765ReplyLake Providence Port Commission
-
(printed as 7/10/2026)Reply311761ReplyDelta Southern Railroad, Inc.
-
(printed as 7/9/2026)Reply311754Reply To AppealNorth Louisiana & Arkansas Railroad
-
(printed as 7/8/2026)Reply311745ReplyLake Providence Port Commission
-
(printed as 7/7/2026)Exhibit311734Exhibit(s)Delta Southern Railroad, Inc.
-
(printed as 7/6/2026)Appeal311718AppealDelta Southern Railroad, Inc.
-
(printed as 7/6/2026)Reply311715ReplyDelta Southern Railroad, Inc.
-
served (printed as 7/2/2026)Decision(1) ORDERED NORTH LOUISIANA & ARKANSAS RAILROAD, INC. TO PROVIDE 2025 FINANCIAL INFORMATION TO DELTA SOUTHERN RAILROAD, INC. (DSRR), AS SOON AS IT IS AVAILABLE; AND (2) DENIED DSRR'S MOTION TO COMPEL
-
(printed as 7/1/2026)Letter311703LetterLake Providence Port Commission
-
(printed as 6/25/2026)Reply311679ReplyNorth Louisiana & Arkansas Railroad
-
(printed as 6/25/2026)Reply311676ReplyNorth Louisiana & Arkansas Railroad
-
(printed as 6/16/2026)Letter311644LetterLake Providence Port Commission
-
(printed as 6/16/2026)Motion311639Motion To CompelDelta Southern Railroad Inc.
-
served (printed as 6/5/2026)DecisionISSUED DELTA SOUTHERN RAILROAD SUBPOENAS PURSUANT TO THE ALJ’S JUNE 3, 2026, ORDER.
-
(printed as 6/4/2026)Motion311552Motion/Petition/RequestDelta Southern Railroad, Inc.
-
served (printed as 6/3/2026)DecisionGRANTED DELTA SOUTHERN RAILROAD, INC.'S MOTION FOR ISSUANCE OF SUBPOENAS TO APPLICANT AND TO A PARTY TO THIS PROCEEDING BUT LIMITED THE DEPOSITIONS TO ONE DAY.
-
(printed as 5/29/2026)Letter311511LetterLake Providence Port Commission
-
served (printed as 5/27/2026)Decision53001Entire BoardDIRECTED LAKE PROVIDENCE PORT COMMISSION TO SUBMIT ANY REVISIONS TO ITS VALUATION CALCULATIONS AND SUPPORTING EVIDENCE DEEMED WARRANTED BY THE UPDATED INFORMATION DELTA SOUTHERN RAILROAD, INC., RECENTLY PRODUCED IN DISCOVERY AND SETS A DEADLINE FOR THE COMPLETION OF DISCOVERY.
-
(printed as 5/21/2026)Motion311450Motion/Petition/RequestLake Providence Port Commission, Southeast Arkansas Economic Development District, Lake Providence Port Commission and Southeast Arkansas Development District
-
(printed as 5/20/2026)Reply311439ReplyDelta Southern Railroad, Inc.
-
(printed as 5/13/2026)Errata311340Errata/CorrectionLake Providence Port Commission, Southeast Arkansas Economic Development District
-
(printed as 5/12/2026)Reply311338ReplyLake Providence Port Commission, Southeast Arkansas Economic Development District
-
(printed as 5/7/2026)Letter311286LetterLake Providence Port Commission
-
(printed as 5/7/2026)Brief311277BriefDelta Southern Railroad, Inc.
-
(printed as 5/6/2026)Reply311278ReplyDelta Southern Railroad, Inc.
-
(printed as 5/5/2026)Letter311272LetterLake Providence Port Commission
-
(printed as 4/16/2026)Letter311139LetterLake Providence Port Commission
-
served (printed as 3/25/2026)Decision52954Entire BoardDENIED AN APPEAL OF A DECISION OF THE ADMINISTRATIVE LAW JUDGE THAT GRANTED A MOTION FOR ISSUANCE OF A SUBPOENA WITH CERTAIN LIMITATIONS.
-
(printed as 3/11/2026)Reply310998ReplyDelta Southern Railroad, Inc.
-
served (printed as 3/10/2026)DecisionREMINDED COUNSEL THAT APPEALS OF DISCOVERY RULINGS OF BOARD EMPLOYEES, INCLUDING ADMINISTRATIVE LAW JUDGES, MUST BE FILED WITH THE BOARD WITHIN SEVEN CALENDAR DAYS.
-
(printed as 3/6/2026)Reply310949ReplyDelta Southern Railroad, Inc.
-
(printed as 3/5/2026)Appeal310942AppealLake Providence Port Commission, Complex Chemical, Inc.
-
served (printed as 2/27/2026)DecisionGRANTED DELTA SOUTHERN RAILROAD'S MOTION FOR ISSUANCE OF SUBPONEA TO COMPLEX CHEMICAL COMPANY, INC., BUT LIMITED THE SUBPOENA.
-
(printed as 2/18/2026)Reply310886ReplyDelta Southern Railroad, Inc.
-
served (printed as 2/13/2026)Decision(1) GRANTED SIX MOTIONS FOR ISSUANCE OF SUBPOENAS DUCES TECUM; AND (2) GRANTED A REQUEST TO CORRECT THE SAM E. ANGEL, II SUBPOENA.
-
(printed as 2/13/2026)Reply310876ReplyLake Providence Port Commission and Complex Chemical, Complex Chemical
-
(printed as 2/10/2026)Errata310857Errata/CorrectionDelta Southern Railroad, Inc.
-
(printed as 2/10/2026)Reply310856ReplyLake Providence Port Commission
-
(printed as 2/9/2026)Motion310854Motion/Petition/RequestDelta Southern Railroad, Inc.
-
served (printed as 1/30/2026)DecisionGRANTED THE JOINT MOTION FOR EXTENSION OF TWO DEADLINES IN THE DECISION SERVED ON JANUARY 16, 2026.
-
(printed as 1/29/2026)RequestLake Providence Port Commission
-
(printed as 1/22/2026)Statement310775Support StatementLake Providence Port Commission
-
served (printed as 1/16/2026)DecisionDETERMINED THAT: (1) DELTA SOUTHERN RAILROAD INC'S (DSSR) MOTION TO STRIKE IS DENIED AND ITS ALTERNATIVE MOTION TO COMPEL IS DENIED; (2) DSRR'S MOTION FOR SUBPOENA DUCES TECUM IS DENIED WITHOUT PREJUDICE; AND (3) LAKE PROVIDENCE PORT COMMISSION'S MOTION TO COMPEL UPDATED VALUATION DISCOVERY IS GRANTED, AND DSSR SHALL PRODUCE UPDATED DISCOVERY ON OR BEFORE MARCH 15, 2026.
-
(printed as 1/5/2026)Reply310650ReplyDelta Southern Railroad Inc.
-
served (printed as 12/31/2025)DecisionDETERMINED THAT: (1) REPLIES TO DISCOVERY MOTIONS SHALL BE FILED ON OR BEFORE MONDAY, JANUARY 5, 2026; (2) LAKE PROVIDENCE PORT COMMISSION, DELTA SOUTHERN RAILROAD, INC., AND THE ATTORNEYS FOR THE DISPUTED WITNESSES SHALL MEET AND CONFER TO RESOLVE ALL PENDING DISCOVERY ISSUES ON OR BEFORE THURSDAY, JANUARY 8, 2026; (3) COUNSEL MUST SEND A LETTER TO THE ADMINISTRATIVE LAW JUDGE (ALJ) (PREFERABLY JOINTLY) WITH A BRIEF DESCRIPTION OF THE ISSUES THAT REMAIN TO BE RESOLVED AND A LIST OF WHO WILL ATTEND, ON OR BEFORE FRIDAY, JANUARY 9, 2026, AT 9:00 A.M. CENTRAL TIME; AND (4) THE ALJ WILL HOLD A STATUS CONFERENCE ON TUESDAY, JANUARY 13, 2026, AT 9:00 A.M. CENTRAL TIME TO DISCUSS ANY REMAINING DISCOVERY ISSUES.
-
(printed as 12/23/2025)Reply310601ReplyLake Providence Port Commission
-
(printed as 12/23/2025)Letter310591LetterDelta Southern Railroad Inc
-
(printed as 12/19/2025)Reply310576ReplyLake Providence Port Commission
-
served (printed as 12/18/2025)DecisionDENIED A JOINT REQUEST FOR CLARIFICATION OF A DECISION SERVED ON DECEMBER 12, 2025.
-
(printed as 12/18/2025)Reply310571ReplyLake Providence Port Commission
-
(printed as 12/18/2025)Reply310567ReplyDelta Southern Railroad Inc.
-
(printed as 12/16/2025)Letter310530LetterLake Providence Port Commission
-
(printed as 12/16/2025)Motion310529Motion To CompelLake Providence Port Commission
-
(printed as 12/15/2025)Motion310523Motion/Petition/RequestDelta Southern Railroad, Inc.
-
served (printed as 12/12/2025)Decision52830Entire BoardASSIGNED AND AUTHORIZED AN ADMINISTRATIVE LAW JUDGE TO ADDRESS DISCOVERY MATTERS IN THIS DOCKET AND ORDERED THAT DEPOSITIONS SOUGHT BY DELTA SOUTHERN RAILROAD BE PAUSED PENDING RESOLUTION OF THE ONGOING, RELATED DISCOVERY DISPUTES BY THE ADMINISTRATIVE LAW JUDGE.
-
(printed as 12/12/2025)Letter310502LetterDelta Southern Railroad, Inc.
-
(printed as 12/10/2025)NoticeTerral RiverService, Inc.
-
(printed as 12/9/2025)Reply310474ReplyComplex Chemical Company, Inc.
-
(printed as 12/9/2025)Reply310471ReplyHollybrook Warehouse, Inc. and its President, Robert N. Amacker, Jr.
-
(printed as 12/8/2025)Reply310461ReplyLivington Pecan and Metal, Inc.
-
(printed as 12/8/2025)Reply310460ReplyEpstein Gin Co. and Epstein Transloading
-
(printed as 12/5/2025)Motion310450Motion/Petition/RequestDelta Southern Railroad Inc
-
(printed as 12/5/2025)Motion310445Motion/Petition/RequestLake Providence Port Commission
-
(printed as 11/24/2025)Reply310338ReplyLake Providence Port Commission
-
(printed as 11/19/2025)Reply310281ReplyLake Providence Port Commission, Lake Providence Port Commission and Southeast Arkansas Economic Development District
-
(printed as 11/19/2025)Motion310279Motion/Petition/RequestDelta Southern Railroad, Inc.
-
(printed as 11/19/2025)Motion310278Motion To CompelDelta Southern Railroad, Inc.
-
served (printed as 9/25/2025)Decision52736Entire Board(1) REMOVED THIS PROCEEDING FROM ABEYANCE, (2) DENIED THE MOTIONS TO DISMISS THE PROCEEDING, (3) DIRECTED THE PARTIES TO SUBMIT A PROPOSED PROCEDURAL SCHEDULE, AND (4) DENIED A REQUEST FOR ATTORNEYS’ FEES.
-
(printed as 9/17/2025)Certificate310081Certificate Of ServiceLake Providence Port Commission
-
(printed as 9/17/2025)Motion310079Motion/Petition/RequestLake Providence Port Commission
-
(printed as 9/17/2025)Notice310076NoticeL.E. Peabody & Associates, Inc.
-
(printed as 9/16/2025)Report310071Status ReportDelta Southern Railroad, Inc.
-
(printed as 9/12/2025)Letter310061LetterSurface Transportation Board
-
(printed as 9/8/2025)Letter310045LetterHonorable John Kennedy, Honorable Bill Cassidy, M.D., Honorable John Boozman, Honorable Tom Cotton
-
(printed as 8/13/2025)Letter309953LetterSurface Transportation Board
-
(printed as 8/1/2025)Letter309855LetterHonorable Julia Letlow, Honorable Rick Crawford, Honorable Bruce Westerman
-
(printed as 6/23/2025)Reply309693ReplyLake Providence Port Commission
-
(printed as 6/20/2025)Reply309687ReplyDelta Southern Railroad, Inc.
-
(printed as 6/18/2025)Reply309681ReplyLake Providence Port Commission
-
served (printed as 6/17/2025)DecisionGRANTED A REQUEST TO EXTEND THE DUE DATE FOR REPLIES TO A MOTION TO DISMIISS.
-
(printed as 6/13/2025)Reply309660ReplyLake Providence Port Commission
-
(printed as 5/29/2025)MotionDelta Southern Railroad, Inc.
-
(printed as 5/28/2025)SupplementDelta Southern Railroad
-
(printed as 5/27/2025)MotionDelta Southern Railroad, Inc.
-
(printed as 4/14/2025)Reply309459ReplyLake Providence Port Commission, Lake Providence Port Commission, North Louisiana and Arkansas Railroad, and the Southeast Arkansas Economic Development District
-
(printed as 4/9/2025)Notice309435NoticeDelta Southern Railroad
-
(printed as 3/6/2025)Reply309314ReplyDelta Southern Railroad
-
(printed as 3/4/2025)Report309303Status ReportLake Providence Port Commission
-
served (printed as 8/2/2024)Decision52212Entire BoardPLACED THIS MATTER IN ABEYANCE IN LIGHT OF RECENTLY FILED STATE COURT ACTIONS THAT MAY IMPACT THIS PROCEEDING.
-
(printed as 8/2/2024)SupplementLake Providence Port Commission
-
(printed as 7/26/2024)SupplementL. E. Peabody & Associates
-
(printed as 7/25/2024)SupplementDelta Southern Railroad, Inc.
-
(printed as 7/22/2024)Reply308486ReplyDelta Southern Railroad, Inc.
-
(printed as 7/16/2024)Reply308475ReplyLake Providence Port Commission
-
(printed as 7/5/2024)Reply308449ReplyLake Providence Port Commission and Southeast Arkansas Economic Development District
-
(printed as 7/5/2024)Statement308448Verified StatementLake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission, and North Louisiana & Arkansas Railroad, Inc. , Lake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission, and North Louisiana & Arkansas Railroad, Inc.
-
(printed as 7/3/2024)Letter308445LetterDelta Southern Railroad, Inc.
-
(printed as 6/27/2024)Motion308427Motion/Petition/RequestDelta Southern Railroad, Inc.
-
(printed as 5/29/2024)Notice308341NoticeLake Providence Port Commission and Southeast Arkansas Economic Development District, Lake Providence Port Commission, Southeast Arkansas Economic Development District, and North Louisiana and Arkansas Railroad, Inc.
-
served (printed as 4/25/2024)DecisionEXTENDED THE TIME BY WHICH LAKE PROVIDENCE PORT COMMISSION MUST REPORT TO THE ADMINISTRATIVE LAW JUDGE AS TO ANY DISCOVERY DISPUTES REQUIRING RESOLUTION TO AND INCLUDING MAY 24, 2024.
-
(printed as 4/23/2024)RequestLake Providence Port Commission
-
(printed as 4/19/2024)SupplementLake Providence Port Commission, Southeast Arkansas Economic Development District, and North Louisiana and Arkansas Railroad, Inc.
-
served (printed as 4/15/2024)DecisionORDER RESOLVED A LAKE PROVIDENCE PORT COMMISSION (LPPC) EMERGENCY MOTION AND ORDERED DELTA SOUTHERN RAILROAD, INC. AND LPPC TO MEET AND CONFER.
-
(printed as 4/10/2024)Motion308173Motion/Petition/RequestNorth Louisiana & Arkansas Railroad, Lake Providence Port Commission, and Southeast Arkansas Economic Development District, Lake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission, and North Louisiana & Arkansas Railroad, Inc.
-
(printed as 4/3/2024)SupplementDelta Southern Railroad, Inc.
-
(printed as 4/1/2024)Reply308153ReplyDelta Southern Railroad, Inc.
-
(printed as 3/28/2024)Reply308141ReplyLake Providence Port Commission, Lake Providence Port Commission and Southeast Arkansas Economic Development District
-
served (printed as 3/22/2024)DecisionEXTENDED THE TIME BY WHICH LAKE PROVIDENCE PORT COMMISSION MUST REPORT TO THE ADMINISTRATIVE LAW JUDGE AS TO ANY DISCOVERY DISPUTES REQUIRING RESOLUTION TO AND INCLUDING APRIL 24, 2024.
-
(printed as 3/21/2024)RequestLake Providence Port Commission
-
(printed as 3/20/2024)Notice308109NoticeLake Providence Port Commission, North Louisiana and Arkansas Railroad, and the Southeast Arkansas Economic Development District
-
(printed as 3/14/2024)Reply308089ReplyLake Providence Port Commission
-
(printed as 3/14/2024)NoticeLake Providence Port Commission and Southeast Arkansas Economic Development District
-
(printed as 3/12/2024)Notice308077NoticeDelta Southern Railroad, Inc.
-
(printed as 3/11/2024)Motion308067Motion/Petition/RequestLake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission, and North Louisiana & Arkansas Railroad, Inc. , Lake Providence Port Commission
-
(printed as 3/8/2024)Motion308065Motion To CompelDelta Southern Railroad, Inc.
-
(printed as 3/8/2024)Motion308064Motion To CompelDelta Southern Railroad, Inc.
-
(printed as 3/8/2024)Motion308063Motion To CompelDelta Southern Railroad, Inc.
-
served (printed as 1/10/2024)DecisionGRANTED A JOINT MOTION FOR AN EXTENSION OF TIME TO COMPLETE MEET AND CONFER PROCESS REGARDING VALUATION DISCOVERY.
-
(printed as 1/5/2024)RequestDelta Southern Railroad, Inc., Lake Providence Port Commission
-
(printed as 12/20/2023)Notice307672NoticeLake Providence Port Commission
-
served (printed as 12/11/2023)DecisionCONDITIONALLY ACCEPTED AN AMENDED FEEDER LINE APPLICATION.
-
(printed as 12/1/2023)Certificate307567Certificate Of ServiceLake Providence Port Commission
-
(printed as 11/30/2023)SupplementLake Providence Port Commission
-
served (printed as 11/20/2023)Decision51875Entire BoardDENIED DELTA SOUTHERN RAILROAD'S MOTION TO REJECT THE LAKE PROVIDENCE PORT COMMISSION'S AMENDED FEEDER LINE APPLICATION AND ASSIGNED AN ADMINISTRATIVE LAW JUDGE.
-
(printed as 11/20/2023)Letter307514LetterSurface Transportation Board
-
(printed as 11/13/2023)Letter307457LetterHonorable John Kennedy, Honorable Tom Cotton, Honorable Eric A. “Rick” Crawford, Honorable Bill Cassidy M.D., Honorable John Boozman, Honorable Julia Letlow
-
(printed as 9/13/2023)Letter307114LetterSurface Transportation Board
-
(printed as 9/7/2023)Letter307083LetterHonorable Bruce Westerman, Honorable Troy A. Carter, Sr.
-
(printed as 8/21/2023)Reply306993ReplyLake Providence Port Commission, Southeast Arkansas Economic Development District, and North Louisiana and Arkansas Railroad, Inc.
-
(printed as 8/18/2023)Reply306988Reply CommentsDelta Southern Railroad, Inc.
-
(printed as 8/8/2023)SupplementLake Providence Port Commission, Southeast Arkansas Economic Development District, and North Louisiana and Arkansas Railroad, Inc.
-
(printed as 8/7/2023)Reply306926ReplyLake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission; and North Louisiana & Arkansas Railroad
-
(printed as 7/28/2023)Reply306900ReplyDelta Southern Railroad, Inc.
-
(printed as 7/10/2023)Motion306813Motion/Petition/RequestLake Providence Port Commission
-
(printed as 3/2/2023)Errata306253Errata/CorrectionDelta Southern Railroad, Inc.
-
(printed as 2/28/2023)Reply306237ReplyPatriot Rail Company LLC and Delta Southern Railroad, Inc.
-
(printed as 2/10/2023)Comments306133CommentDelta Southern Railroad, Inc.
-
(printed as 2/9/2023)Motion306121Motion To CompelLake Providence Port Commission, Southeast Arkansas Economic Development District, and North Louisiana and Arkansas Railroad, Inc.
-
served (printed as 2/2/2023)Decision51583Entire BoardWAIVED THE 30-DAY REGULATORY DEADLINE FOR ACCEPTING OR REJECTING THE AMENDED FEEDER LINE APPLICATION FILED ON JANUARY 4, 2023.
-
(printed as 1/31/2023)Reply306077ReplyDelta Southern Railroad, Inc.
-
(printed as 1/26/2023)SupplementLake Providence Port Commission, Southeast Arkansas Economic Development District, and North Louisiana and Arkansas Railroad, Inc.
-
(printed as 1/25/2023)SupplementLake Providence Port Commission, Southeast Arkansas Economic Development District, and North Louisiana and Arkansas Railroad, Inc.
-
(printed as 1/20/2023)Reply306013ReplyLake Providence Port Commission
-
(printed as 1/13/2023)Motion305965Motion/Petition/RequestDelta Southern Railroad, Inc.
-
(printed as 1/13/2023)SubstitutionDelta Southern Railroad, Inc.
-
(printed as 1/4/2023)SupplementLake Providence Port Commission
-
(printed as 11/14/2022)Reply305631ReplyLake Providence Port Commission, Southeast Arkansas Economic Development District, and North Louisiana and Arkansas Railroad, Inc.
-
(printed as 11/10/2022)Motion305620Motion/Petition/RequestPatriot Rail Company LLC and Delta Southern Railroad, Inc.
-
(printed as 11/8/2022)Report305604Status ReportPatriot Rail Company, Delta Southern Railroad, and Lake Providence Commission
-
served (printed as 10/14/2022)Decision(1) DIRECTED PARTIES TO MEET AND CONFER ON THE OUTSTANDING ISSUES RAISED IN DOCKET NO. FD 36447; (2) ORDERED A STATUS REPORT BY NOVEMBER 14, 2022; AND (3) HELD DOCKET NO. FD 36642 IN ABEYANCE UNTIL FURTHER ORDER OF THE BOARD.
-
(printed as 9/2/2022)SupplementDelta Southern Railroad, Inc.
-
(printed as 8/24/2022)Letter305179LetterLake Providence Port Commission
-
served (printed as 8/23/2022)Decision51261Entire Board(1) ALLOWED THE LAKE PROVIDENCE PORT COMMISSION TO FILE AN AMENDED FEEDER LINE APPLICATION THAT INVOLVES A LONGER LINE THAN ORIGINALLY PROPOSED; AND (2) DENIED AS MOOT THREE MOTIONS PERTAINING TO THE INITIAL APPLICATION.
-
(printed as 5/11/2022)Reply304533ReplyDelta Southern Railroad, Inc.
-
(printed as 4/27/2022)Reply304449ReplyLake Providence Port Commission, Southeast Arkansas Economic Development District, and North Louisiana and Arkansas Railroad, Inc.
-
(printed as 4/25/2022)Motion304433Motion To StrikeDelta Southern Railroad, Inc.
-
(printed as 4/4/2022)Rebuttal304232RebuttalLake Providence Port Commission
-
(printed as 3/24/2022)Reply304172ReplyDelta Southern Railroad, Inc.
-
(printed as 3/4/2022)Motion304056Motion/Petition/RequestLake Providence Port Commission
-
(printed as 2/22/2022)Errata303965Errata/CorrectionLake Providence Port Commission, Southeast Arkansas Economic Development District, and North Louisiana and Arkansas Railroad, Inc.
-
(printed as 2/18/2022)Reply303955ReplyLake Providence Port Commission
-
served (printed as 2/9/2022)DecisionDIRECTED LAKE PROVIDENCE PORT COMMISSION TO FILE ANY REPLY IT MAY WISH TO SUBMIT TO DELTA SOUTHERN RAILROAD, INC.'S MAY 28, 2021 MOTION TO STRIKE BY FEB. 22, 2022.
-
(printed as 1/19/2022)Letter303558LetterSurface Transportation Board
-
(printed as 10/22/2021)Letter303116LetterSurface Transportation Board
-
served (printed as 10/21/2021)Decision50948Entire BoardACKNOWLEDGED THE PARTIES’ REPORTS THAT DISCOVERY ISSUES HAVE BEEN RESOLVED AND ORDERS BOARD-SPONSORED MEDIATION IN AN EFFORT TO RESOLVE DISPUTES RELATING TO THE LINE AT ISSUE.
-
(printed as 10/12/2021)Letter303080LetterHonorable John Boozman, Honorable Bill Cassidy M.D., Honorable John Kennedy, Honorable Eric A. “Rick” Crawford, Honorable Julia Letlow, Honorable John Boozman, Honorable Tom Cotton
-
(printed as 9/20/2021)Reply303018ReplyDelta Southern Railroad, Inc.
-
(printed as 9/7/2021)Motion302981Motion/Petition/RequestLake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission, and North Louisiana & Arkansas Railroad, Inc.
-
(printed as 7/1/2021)Comments302664CommentLake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission; and North Louisiana & Arkansas Railroad
-
(printed as 6/30/2021)Reply302655ReplyDelta Southern Railroad, Inc.
-
(printed as 6/25/2021)Letter302604LetterLake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission; and North Louisiana & Arkansas Railroad
-
(printed as 6/25/2021)Letter302597LetterDelta Southern Railroad, Inc.
-
served (printed as 6/23/2021)DecisionGRANTED A MOTION FOR PROTECTIVE ORDER.
-
(printed as 6/22/2021)SupplementLake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission, and North Louisiana & Arkansas Railroad
-
(printed as 6/15/2021)MotionNorth Louisiana & Arkansas Railroad, Inc.
-
(printed as 6/15/2021)Report302527Status ReportLake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission, and North Louisiana & Arkansas Railroad
-
(printed as 6/15/2021)Report302518Status ReportDelta Southern Railroad, Inc.
-
served (printed as 6/1/2021)Decision50692Entire BoardDENIED A MOTION FOR PROTECTIVE ORDER, DENIED AS MOOT A RELATED PETITION FOR ISSUANCE OF A SUBPOENA, AND DIRECTED PARTIES TO CONFER AND REPORT TO THE BOARD ON ANY REMAINING DISCOVERY ISSUES.
-
(printed as 5/28/2021)Motion302425Motion To StrikeDelta Southern Railroad, Inc.
-
(printed as 5/11/2021)SupplementLake Providence Port Commission
-
(printed as 4/8/2021)SupplementLake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission, and North Louisiana & Arkansas Railroad, Inc.
-
(printed as 3/26/2021)Reply301849ReplyDelta Southern Railroad, Inc.
-
(printed as 3/24/2021)Motion301840Motion To StrikeLake Providence Port Commission, Southeast Arkansas Economic Development District, Monroe Parish Port Commission, and North Louisiana & Arkansas Railroad
-
(printed as 3/22/2021)Reply301798ReplyDelta Southern Railroad, Inc.
-
(printed as 3/12/2021)Reply301747ReplyLake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission, and North Louisiana & Arkansas Railroad
-
served (printed as 3/9/2021)DecisionSUSPENDED THE PROCEDURAL SCHEDULE PENDING FURTHER BOARD ORDER.
-
(printed as 3/8/2021)Motion301729Motion To StrikeDelta Southern Railroad, Inc.
-
(printed as 3/8/2021)SupplementLake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission, and North Louisiana & Arkansas Railroad
-
(printed as 3/5/2021)Reply301723ReplyLake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission, and North Louisiana & Arkansas Railroad
-
(printed as 3/2/2021)MotionDelta Southern Railroad, Inc.
-
(printed as 3/1/2021)Reply301701ReplyNorth Louisiana & Arkansas Railroad
-
(printed as 2/26/2021)Motion301690PetitionDelta Southern Railroad, Inc.
-
(printed as 2/26/2021)Reply301686ReplyDelta Southern Railroad, Inc.
-
(printed as 2/18/2021)MotionNorth Louisiana & Arkansas Railroad, Lake Providence Port Commission, and Southeast Arkansas Economic Development District
-
(printed as 1/27/2021)SubstitutionDelta Southern Railroad, Inc.
-
served (printed as 1/15/2021)DecisionPROVIDED NOTICE THAT LAKE PROVIDENCE PORT COMMISSION'S FEEDER LINE APPLICATION HAS BEEN ACCEPTED.
-
(printed as 12/28/2020)SupplementLake Providence Port Commission
-
(printed as 12/22/2020)SupplementLake Providence Port Commission, Southeast Arkansas Economic Development District, Monroe Parish Port Commission, and North Louisiana & Arkansas Railroad
-
served (printed as 12/11/2020)Decision50549Entire BoardWAIVED A REGULATORY LIMITATION TO THE ACCEPTANCE OF INCOMPLETE APPLICATIONS AND CONDTIONALLY ACCEPTED AN OTHERWISE COMPLETE FEEDER LINE APPLICATION.
-
(printed as 12/4/2020)Reply301338ReplyLake Providence Port Commission, Southeast Arkansas Economic Development District, and North Louisiana and Arkansas Railroad, Inc.
-
(printed as 12/2/2020)Reply301331ReplyDelta Southern Railroad, Inc.
-
(printed as 11/13/2020)Errata301276Errata/CorrectionLake Providence Port Commission and Southeast Arkansas Economic Development District
-
(printed as 11/12/2020)Application301274ApplicationLake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission, and North Louisiana & Arkansas Railroad
-
(printed as 11/12/2020)Motion301273Motion/Petition/RequestLake Providence Port Commission, Southeast Arkansas Economic Development District, Madison Parish Port Commission, and North Louisiana & Arkansas Railroad, Inc.
Nothing of that kind in this docket.