FD 36284 · SEVEN COUNTY INFRASTRUCTURE COALITION--RAIL CONSTRUCTION & OPERATION EXEMPTION--IN UTAH, CARBON, DUCHESNE, AND UINTAH COUNTIES, UTAH

Comment EI-30982

Received or sent (printed as 2/12/2021)

? Air Quality ?- Air pollution in the Uinta Basin already exceeds federal standards because of existing oil and gas development in the region -- by increasing oil and gas development, this project would make it worse. ? Wildlife? ?-? The proposed route of the Uinta Basin Railway traverses roadless areas, steep canyons, and rugged terrain. Over 10,000 acres of big game habitat will be affected by the railroad. Some of this area has been designated as crucial big game habitat by the U.S. Forest Service. The route also impacts the 1600 acres of Greater sage grouse habitat, and areas inhabited by the endangered Barnaby ridge-cress. ? Water - ?The preferred project alignment would run almost the entire length of Indian Canyon Creek, affecting the entire area with 443 stream crossings, impacting over 61 miles of streams and 26 acres of floodplains. All the alternative routes connect to the existing railroad at the same spot: directly adjacent to important wetlands along the Price River. These are unacceptable impacts to the precious perennial waterways in our semi-arid state. ? Community -? The Uinta Basin Railway would change the way of life for those who live and recreate in the area. Landowners in Argyle Canyon and other off-grid canyon communities along the proposed railway route fear the disruption and disfigurement of the stunning landscapes they love. Each locomotive would disturb beloved wildlife, bringing noise and clouds of diesel smoke. Mile-long trains would create traffic delays and the real potential for accidents, derailments, spills and sparks, which could ignite disastrous wildfires. This is an unacceptable threat to community health, safety and wellbeing.

Submitted by: Sam Pettingill · South Jordan, TX

The Board publishes this comment in its environmental-comment table for this proceeding. It is quoted here as printed; nothing is inferred from it, and it states the commenter's own position in their own words, not this record's.

Permanent address docketyard.org/d/FD-36284/comment/EI-30982 · back to the docket sheet