Display Kept in this browser only
FD 36284 · SEVEN COUNTY INFRASTRUCTURE COALITION--RAIL CONSTRUCTION & OPERATION EXEMPTION--IN UTAH, CARBON, DUCHESNE, AND UINTAH COUNTIES, UTAH

Comment EI-30262

Received or sent (printed as 9/3/2019)

For the Craig route. I would suggest looking at the never completed Salt Lake & Denver railroad. "The Uintah Basin Route." The road was organized in 1919 by Simon Bamberger to build from Provo to a connection with the D&SL at Craig. The route was basically south-southwest from Craig to the White River, along the White River to its meeting with the Green River, then up the Duchesne River and the Strawberry River to the Wasatch Mountains. It was then to cross the Wasatch Mountains and head west down Hobble Creek Canyon to Provo. The line was never built, or even seriously planned Source Utahrails.net

Submitted by: Braden Kayganich · Mocomb, MI

The Board publishes this comment in its environmental-comment table for this proceeding. It is quoted here as printed; nothing is inferred from it, and it states the commenter's own position in their own words, not this record's.

Permanent address docketyard.org/d/FD-36284/comment/EI-30262 · back to the docket sheet