Comment EI-30165
Received or sent (printed as 8/27/2019)
I think that the rail project is a long overdue and much needed asset to the Uintah basin. I am all in favor of the project.
Submitted by: Scott Atwood · Vernal, UT
The Board publishes this comment in its environmental-comment table for this proceeding. It is quoted here as printed; nothing is inferred from it, and it states the commenter's own position in their own words, not this record's.
Permanent address docketyard.org/d/FD-36284/comment/EI-30165 · back to the docket sheet