Comment EI-23043
Received or sent (printed as 5/29/2016)
Page 1..the elevation to the southwest is at 660ft at the highway it is 670ft elevation. half a mile to the northeast is 712ft. we have spent $8000. on tiling, the water flows southeast and southwest. on page 1..#3 is a high voltage utility line. The railroad line will be running 200ft from the 2 homes sitting there. Page 2.. water flows 712ft to the north the elevation is at 680ft at the waterways and the water flows east to west at this mark. we have spent $25,000. in tiling this land getting ready to do a major project in waterways CRP government funds, which is through the NRCS and FSA. page 1&2..in one mile there are 3 major railroad crossings. at the 3rd crossing it is at 710ft elevation. page 3...we have spent $3000. putting tile in. page 4... water flows to the west. we have spent $25,000 in tiling this particular land.
Submitted by: Ron Hoffman · RAILED · Hebron, Indiana
The Board publishes this comment in its environmental-comment table for this proceeding. It is quoted here as printed; nothing is inferred from it, and it states the commenter's own position in their own words, not this record's.
The text ron hoffman aerials pg1.pdf ↓ ron hoffman aerials pg2.pdf ↓ ron hoffman aerials pg3.pdf ↓ ron hoffman aerials pg4.pdf ↓
Permanent address docketyard.org/d/FD-35952/comment/EI-23043
File docketyard.org/document/df861056a6e8986e29d50b57bcf26b63b30ce08d35d28ed0f199ac395e216c82.pdf
File docketyard.org/document/70ecb133553b2c8a8b0028b7ed265931242e87871226605cd31ea7da0987d724.pdf
File docketyard.org/document/e3a7eecb68fc59d8fd3f3605c56e7e0df8d887d413ce1388d48e9973168148e2.pdf
File docketyard.org/document/59ed6667921af294612fe75c7023651d9507ae7270004bd03114c4aeff950ef5.pdf · back to the docket sheet