FD 35952 · GREAT LAKES BASIN TRANSPORTATION, INC.-RAIL CONSTRUCTION AND OPERATION-IN ROCK COUNTY, WISC., WINNEBAGO, OGLE, LEE, LASALLE, GRUNDY, AND KANKAKEE COUNTIES, ILL., AND LAKE AND PORTER COUNTIES, IND.

Comment EI-22575

Received or sent (printed as 5/9/2016)

The proposed route of this rail project passes over an underground oil pipeline. This pipeline was installed within the last ten years. Depth of the pipeline is approximately 6 feet. I am concerned about the continuous vibrations of 110 trains a day passing over this pipeline. Could the constant vibration damage the structural integrity of the pipeline? If a leak goes undetected soil and ground water contamination is guaranteed.

Submitted by: Brad Mair · Save Our Farmland · Janesville, Wisconsin

The Board publishes this comment in its environmental-comment table for this proceeding. It is quoted here as printed; nothing is inferred from it, and it states the commenter's own position in their own words, not this record's.

Permanent address docketyard.org/d/FD-35952/comment/EI-22575 · back to the docket sheet