[Mount Prospect] This proposed new railroad is supposed to reduce congestion, and at the same time increase total rail capacity. This two goals are incompatible. The so called bypass also does not take any trains out of the metro area. So this line brings more trains to an already congeste area. A true bypass wouldd take trains out of the area. For example a line running from Kansas City to detroit would bypass the Chicago Metro Area. This line does not do this, for that reason the line needes stopped.

Submitted by: Dennis Scheppler · Mount Prospect, Il

The Board publishes this comment in its environmental-comment table for this proceeding. It is quoted here as printed; nothing is inferred from it, and it states the commenter's own position in their own words, not this record's.

Permanent address docketyard.org/d/FD-35952/comment/EI-22397 · back to the docket sheet