Display Kept in this browser only
FD 35952 · GREAT LAKES BASIN TRANSPORTATION, INC.-RAIL CONSTRUCTION AND OPERATION-IN ROCK COUNTY, WISC., WINNEBAGO, OGLE, LEE, LASALLE, GRUNDY, AND KANKAKEE COUNTIES, ILL., AND LAKE AND PORTER COUNTIES, IND.

Comment EI-22278

Received or sent (printed as 4/26/2016)

Please investigate the Plum River Fault Zone, the Leaf River Anticline & Upton's Cave Syncline. These are in Ogle County, 5 - 10 miles from the proposed route of GLBRR. The San Madrid Fault does a re-adjust about every 200 years. The last one was in 1811. You mentioned the tracks are welded & have very little give. I believe this to be a major concern. Please stop this Railroad!

Submitted by: Mary Rose Fillip · Rockford, Il

The Board publishes this comment in its environmental-comment table for this proceeding. It is quoted here as printed; nothing is inferred from it, and it states the commenter's own position in their own words, not this record's.

Permanent address docketyard.org/d/FD-35952/comment/EI-22278 · back to the docket sheet