Display Kept in this browser only
FD 35952 · GREAT LAKES BASIN TRANSPORTATION, INC.-RAIL CONSTRUCTION AND OPERATION-IN ROCK COUNTY, WISC., WINNEBAGO, OGLE, LEE, LASALLE, GRUNDY, AND KANKAKEE COUNTIES, ILL., AND LAKE AND PORTER COUNTIES, IND.

Comment EI-21891

Received or sent (printed as 4/8/2016)

I am writing in opposition to the proposed GLB project. As a farmer, I have land in the path of this proposal. The destruction of existing drainage is of critical concern. As a part of the EIS, I believe that a COMPLETE AND ACCURATE mapping of all existing field tile be done for all affected parcels of land. This is a must to help insure the future of our land.

Submitted by: Bruce Baker · Verona, IL

The Board publishes this comment in its environmental-comment table for this proceeding. It is quoted here as printed; nothing is inferred from it, and it states the commenter's own position in their own words, not this record's.

Permanent address docketyard.org/d/FD-35952/comment/EI-21891 · back to the docket sheet