APPLICATION OF THE NATIONAL RAILROAD PASSENGER CORPORATION UNDER 49 U.S.C. § 24308(a) – CANADIAN NATIONAL RAILWAY COMPANY
Caption from the Board’s record.
139 filings, 48 decisions and 0 environmental comments observed here; last checked 10 Oct 2026, 21:36 UTC; last new entry 16 Sep 2026, 20:29 UTC.
Entries
-
served (printed as 9/16/2026)DecisionGRANTED A JOINT MOTION TO DISMISS.
-
(printed as 9/16/2026)Section312350Section 5 SummarySurface Transportation Board
-
(printed as 9/16/2026)Section312349Section 5 SummarySurface Transportation Board
-
(printed as 9/16/2026)Section312347Section 5 SummarySurface Transportation Board
-
(printed as 9/16/2026)MotionIllinois Central Railroad Company and Grand Trunk Western Railroad Company, National Railroad Passenger Corporation
-
served (printed as 8/12/2026)DecisionGRANTED A JOINT MOTION FOR 30-DAY ABEYANCE.
-
(printed as 8/7/2026)Motion311911Motion/Petition/RequestIllinois Central Railroad Company and Grand Trunk Western Railroad Company, Natonal Railroad Passenger Corporation
-
served (printed as 7/8/2026)DecisionGRANTED A JOINT MOTION FOR EXTENSION OF PROCEDURAL SCHEDULE.
-
(printed as 7/7/2026)RequestIllinois Central Railroad Company and Grand Trunk Western Railroad Company, National Railroad Passenger Corporation
-
served (printed as 5/20/2026)DecisionGRANTED A JOINT MOTION FOR AN EXTENSION OF A PROCEDURAL SCHEDULE.
-
(printed as 5/19/2026)RequestIllinois Central Railroad Company and Grand Trunk Western Railroad Company, National Railroad Passenger Corporation
-
served (printed as 4/22/2026)DecisionGRANTED A JOINT MOTION FOR EXTENSION OF PROCEDURAL SCHEDULE.
-
(printed as 4/20/2026)RequestIllinois Central Railroad Company and Grand Trunk Western Railroad Company, National Railroad Passenger Corporation
-
served (printed as 3/24/2026)DecisionGRANTED A JOINT MOTION FOR EXTENSION OF PROCEDURAL SCHEDULE.
-
(printed as 3/19/2026)RequestNational Railroad Passenger Corporation, Illinois Central Railroad Company and Grand Trunk Western Railroad Company
-
served (printed as 2/20/2026)DecisionGRANTED A JOINT MOTION FOR EXTENSION OF PROCEDURAL SCHEDULE.
-
(printed as 2/17/2026)RequestIllinois Central Railroad Company and Grand Trunk Western Railroad Company, National Railroad Passenger Corporation
-
served (printed as 1/22/2026)DecisionGRANTED A JOINT MOTION FOR EXTENSION OF PROCEDURAL SCHEDULE.
-
(printed as 1/15/2026)RequestIllinois Central Railroad Company and Grand Trunk Western Railroad, National Railroad Passenger Corporation
-
served (printed as 12/15/2025)DecisionGRANTED A JOINT MOTION FOR EXTENSION OF PROCEDURAL SCHEDULE.
-
(printed as 12/9/2025)RequestIllinois Central Railroad Company and Grand Trunk Western Railroad, National Railroad Passenger Corporation
-
served (printed as 11/19/2025)DecisionGRANTED A JOINT MOTION FOR EXTENSION OF PROCEDURAL SCHEDULE.
-
(printed as 11/13/2025)RequestIllinois Central Railroad Company and Grand Trunk Western Railroad Company, National Railroad Passenger Corporation
-
served (printed as 9/29/2025)DecisionGRANTED A JOINT MOTION FOR EXTENSION OF PROCEDURAL SCHEDULE.
-
(printed as 9/26/2025)RequestNational Railroad Passenger Corporation, Illinois Central Railroad Comapny and Grand Trunk Western Railroad Company
-
served (printed as 9/22/2025)Decision52714Entire BoardDELEGATED AUTHORITY TO THE DIRECTOR OF THE OFFICE OF ECONOMICS TO PERFORM CERTAIN FUNCTIONS AS PART OF THIS PROCEEDING.
-
served (printed as 8/29/2025)DecisionGRANTED A MOTION TO EXTEND THE PROCEDURAL SCHEDULE.
-
(printed as 8/28/2025)RequestNational Railroad Passenger Corporation
-
(printed as 7/28/2025)Errata309821Errata/CorrectionIllinois Central Railroad Company and Grand Trunk Western Railroad Company
-
(printed as 7/22/2025)Report309803Status ReportIllinois Central Railroad Company and Grand Trunk Western Railroad Company
-
(printed as 7/22/2025)Report309802Status ReportNational Railroad Passenger Corporation (Amtrak)
-
(printed as 5/8/2025)Reply309550ReplyIllinois Central Railroad Company and Grand Trunk Western Railroad Company
-
(printed as 5/8/2025)Reply309549ReplyNational Railroad Passenger Corporation
-
served (printed as 4/8/2025)Decision52514Entire BoardDIRECTED PARTIES TO SUBMIT ADDITIONAL INFORMATION, AND ISSUED A PROCEDURAL SCHEDULE.
-
(printed as 4/8/2025)TranscriptSurface Transportation Board
-
(printed as 2/28/2025)Letter309296LetterIllinois Central Railroad Company and Grand Trunk Western Railroad
-
(printed as 2/28/2025)Letter309294LetterNational Railroad Passenger Corporation (Amtrak)
-
served (printed as 2/19/2025)Decision52459Entire BoardANNOUNCED A TECHNICAL CONFERENCE TO DISCUSS REQUESTS FOR ADDITIONAL INFORMATION.
-
(printed as 7/19/2023)Notice306864NoticeDentons US LLP
-
(printed as 12/5/2022)SupplementNational Railroad Passenger Corporation
-
(printed as 11/30/2022)SupplementIllinois Central Railroad Company and Grand Trunk Western Railroad Company
-
served (printed as 10/31/2022)Decision51421Entire BoardDIRECTED THE NATIONAL RAILROAD PASSENGER CORPORATION AND ILLINOIS CENTRAL RAILROAD COMPANY AND GRAND TRUNK WESTERN RAILROAD COMPANY TO MAKE TECHNICAL ADDITIONS AND CORRECTIONS TO THEIR PLEADINGS.
-
(printed as 8/25/2022)Rebuttal305190RebuttalIllinois Central Railroad Company and Grand Trunk Western Railroad Company
-
(printed as 8/25/2022)Rebuttal305188RebuttalNational Railroad Passenger Corporation ("Amtrak")
-
(printed as 7/26/2022)Reply305055ReplyNational Railroad Passenger Corporation ("Amtrak")
-
(printed as 7/26/2022)Reply305054ReplyIllinois Central Railroad Company and Grand Trunk Western Railroad Company
-
(printed as 6/15/2022)Errata304774Errata/CorrectionIllinois Central Railroad Company and Grand Trunk Western Railroad
-
(printed as 6/14/2022)SubstitutionUnion Pacific Railroad
-
(printed as 5/27/2022)Statement304652Opening StatementIllinois Central Railroad Company and Grand Trunk Western Railroad Company
-
(printed as 5/27/2022)Brief304644BriefNational Railroad Passenger Corporation
-
served (printed as 4/18/2022)DecisionGRANTED A REQUEST TO EXTEND A PROCEDURAL SCHEDULE.
-
(printed as 4/8/2022)RequestNational Railroad Passenger Corporation ("Amtrak")
-
served (printed as 3/3/2022)Decision51116Entire BoardADOPTED A PROCEDURAL SCHEDULE FOR FURTHER SUBMISSIONS OF EVIDENCE AND ARGUMENT.
-
(printed as 1/25/2022)Motion303581Motion/Petition/RequestNational Railroad Passenger Corporation ("Amtrak"), Illinois Central Railroad Company and Grand Trunk Western Railroad Company
-
(printed as 12/14/2020)SubstitutionNorfolk Southern Railway Company
-
(printed as 1/22/2020)Letter300301LetterSurface Transportation Board
-
served (printed as 11/14/2019)Decision47340Entire BoardDECISION GRANTED A REQUEST TO EXTEND THE MEDIATION PERIOD IN THIS PROCEEDING UNTIL JANUARY 10, 2020, AND WAIVED A REGULATORY PROVISION THAT WOULD OTHERWISE LIMIT THE MEDIATION PERIOD TO 30 DAYS.
-
(printed as 10/23/2019)RequestNational Railroad Passenger Corporation, Illinois Central Railroad Company And
-
served (printed as 8/9/2019)Decision46869Entire BoardDECISION ISSUED INTERIM FINDINGS AND GUIDANCE TO THE NATIONAL RAILROAD PASSENGER CORPORATION (AMTRAK) AND ILLINOIS CENTRAL RAILROAD COMPANY AND GRAND TRUNK WESTERN RAILROAD COMPANY (SUBSIDIARIES OF CANADIAN NATIONAL RAILWAY COMPANY) AND INITIATES BOARD-SPONSORED MEDIATION IN AN EFFORT TO ESTABLISH REASONABLE TERMS AND COMPENSATION FOR AMTRAK'S USE OF THE CARRIERS' FACILITIES (INCLUDING RAIL LINES) AND SERVICES.
-
(printed as 4/11/2019)Reply247456ReplyNational Railroad Passenger Corporation
-
(printed as 3/22/2019)Motion247331Motion/Petition/RequestIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 3/19/2019)Letter247303LetterHogan Lovells Us Llp
-
(printed as 12/6/2018)Correction246871CorrectionNational Railroad Passenger Corporation
-
(printed as 12/6/2018)Correction246866CorrectionIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
served (printed as 10/12/2018)DecisionDECISION DETERMINED THAT ANY FUTURE DISCOVERY MATTERS AND DISCOVERY DISPUTES IN THESE PROCEEDINGS SHALL NO LONGER BE DIRECTED TOWARDS FEDERAL ENERGY REGULATORY COMMISSION ADMINISTRATIVE LAW JUDGES.
-
(printed as 3/28/2018)Letter245388LetterStates For Passenger Rail Coalition, Inc.
-
(printed as 3/23/2018)Reply245375ReplyNational Association Of Railroad Passengers
-
(printed as 3/23/2018)Reply245362ReplyIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 3/23/2018)Reply245360ReplyNational Railroad Passenger Corporation
-
(printed as 3/5/2018)Reply245265ReplyNorfolk Southern Railway Company
-
(printed as 3/5/2018)Motion245264Motion/Petition/RequestNorfolk Southern Railway Company
-
(printed as 3/5/2018)Motion245262Motion/Petition/RequestCsx Transportation Inc
-
(printed as 3/5/2018)Reply245260ReplyIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 3/5/2018)Reply245257ReplyNational Railroad Passenger Corporation
-
(printed as 3/5/2018)Comments245256CommentNational Industrial Transportation League
-
served (printed as 2/13/2018)DecisionDECISION GRANTED AN AMENDED MOTION FOR A TWO-WEEK OF EXTENSION OF TIME TO FILE REPLY BRIEFS IN THIS PROCEEDING.
-
(printed as 2/12/2018)SupplementNational Railroad Passenger Corporation
-
(printed as 2/6/2018)Reply245130ReplyIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 2/5/2018)RequestNational Railroad Passenger Corporation
-
(printed as 1/19/2018)Brief245032BriefNational Railroad Passenger Corporation
-
(printed as 1/19/2018)Brief245012BriefIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
served (printed as 12/14/2017)DecisionDECISION GRANTED AN EXTENSION OF THE PROCEDURAL SCHEDULE IN THIS PROCEEDING.
-
(printed as 12/14/2017)SubstitutionIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 12/11/2017)RequestNational Railroad Passenger Corporation
-
(printed as 12/7/2017)Reply244823ReplyNational Railroad Passenger Corporation
-
(printed as 11/20/2017)Motion244748Motion To StrikeIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 10/30/2017)Rebuttal244626RebuttalNational Railroad Passenger Corporation
-
(printed as 10/30/2017)Rebuttal244623RebuttalIllinois Central Railroad Company And Grand Trunk Western Railroad Company
-
served (printed as 10/11/2017)DecisionDECISION GRANTED NATIONAL RAILROAD PASSENGER CORPORATION'S, GRAND TRUNK WESTERN RAILROAD COMPANY'S AND ILLINOIS CENTRAL RAILROAD COMPANY'S JOINT REQUEST FOR MODIFICATION OF THE PROCEDURAL SCHEDULE IN THIS PROCEEDING.
-
(printed as 10/4/2017)Motion244460Motion/Petition/RequestIllinois Central Railroad Company And Grand Trunk Western Railroad Company, National Railroad Passenger Corporation
-
(printed as 9/21/2017)Correction244403CorrectionNational Railroad Passenger Corporation
-
(printed as 9/14/2017)Rebuttal244345RebuttalIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 9/14/2017)Rebuttal244340RebuttalNational Railroad Passenger Corporation (Amtrak)
-
(printed as 9/6/2017)Reply244284ReplyNational Railroad Passenger Corporation
-
(printed as 9/5/2017)Letter244267Letter/TelegramIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
served (printed as 8/29/2017)DecisionDECISION GRANTED A JOINT REQUEST FOR MODIFICATION OF THE PROCEDURAL SCHEDULE IN THIS PROCEEDING.
-
(printed as 8/25/2017)SubstitutionCanadian National Railway Company
-
(printed as 8/25/2017)RequestGrand Trunk Western Railroad Company And Illinois Central Railroad Company, National Railroad Passenger Corporation
-
served (printed as 6/29/2017)DecisionDECISION GRANTED A JOINT REQUEST FOR MODIFICATION OF THE PROCEDURAL SCHEDULE IN THIS PROCEEDING.
-
(printed as 6/20/2017)Motion243815Motion/Petition/RequestIllinois Central Railroad Company, Grand Truck Western Railroad Company, And National Railroad Passenger Corporation
-
served (printed as 6/8/2017)DecisionDECISION APPROVED GRAND TRUNK RAILWAY COMPANY AND ILLINOIS CENTRAL RAILWAY COMPANY'S MOTION FOR WITHDRAWAL OF ITS MOTION TO COMPEL.
-
(printed as 5/19/2017)Motion243265Motion/Petition/RequestIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 1/19/2017)Letter242493LetterIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
served (printed as 1/4/2017)DecisionDECISION: (1) SCHEDULED AN ORAL ARGUMENT ON GRAND TRUNK RAILWAY COMPANY AND ILLINOIS CENTRAL RAILWAY COMPANY'S MOTION TO COMPEL FOR JANUARY 23, 2017, AT 10:00 A.M. IN A HEARING ROOM TO BE DESIGNATED AT THE FEDERAL ENERGY REGULATORY COMMISSION; AND (2) DIRECTED ALL PARTIES TO THE DISCOVERY DISPUTES TO ATTEND.
-
(printed as 12/19/2016)Reply242288ReplyNational Railroad Passenger Corporation
-
(printed as 12/12/2016)Motion242237Motion To CompelIllinois Central Railroad Company And Grand Trunk Western Railroad Company
-
(printed as 12/17/2015)SupplementNational Railroad Passenger Corporation
-
served (printed as 12/11/2015)Decision44923Entire BoardDECISION GRANTED A MOTION BY ILLINOIS CENTRAL RAILROAD COMPANY AND GRAND TRUNK WESTERN RAILROAD COMPANY TO REMOVE THE CONFIDENTALITY DESIGNATION FROM SPECIFIC PORTIONS OF AMTRAK'S OPENING STATEMENT.
-
served (printed as 12/9/2015)DecisionDECISION GRANTED AMTRAK AND CANADIAN NATIONAL RAILWAY'S REQUEST THAT THE PARTIES FILE A JOINT CERTIFICATION TO THE BOARD UPON COMPLETING THEIR RESPONSES TO THE PARTIES' SECOND SETS OF DISCOVERY REQUEST.
-
(printed as 12/4/2015)Motion239674Motion/Petition/RequestIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 11/20/2015)Reply239594ReplyIllinois Central Railroad Company And Grand Trunk Western Railroad Company
-
(printed as 11/17/2015)Reply239563ReplyNational Railroad Passenger Corporation
-
served (printed as 11/5/2015)DecisionDECISION GRANTED NATIONAL RAILROAD PASSENGER CORPORATION, ILLINOIS CENTRAL RAILROAD COMPANY AND GRAND TRUNK WESTERN RAILROAD COMPANY'S JOINT MOTION TO AMEND THE PROTECTIVE ORDER SERVED DECEMBER 16, 2013.
-
(printed as 11/3/2015)SupplementIllinois Central Railroad Company, Grand Truck Western Railroad Company, And National Railroad Passenger Corporation
-
(printed as 10/30/2015)Reply239464ReplyIllinois Central Railroad Company And Grand Trunk Western Railroad Company
-
(printed as 10/29/2015)SupplementNational Railroad Passenger Corporation
-
(printed as 10/28/2015)Motion239450Motion/Petition/RequestIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
served (printed as 10/7/2015)DecisionDECISION ADOPTED THE PROCEDURAL SCHEDULE AS PROPOSED BY AMTRAK IN THE SEPTEMBER 30, 2015 MOTION FOR EXTENSION OF THE PROCEDURAL SCHEDULE.
-
(printed as 10/5/2015)Reply239309ReplyIllinois Central Railroad Company, Grand Trunk Western Railroad Company
-
(printed as 10/5/2015)Reply239294ReplyNational Railroad Passenger Corporation
-
(printed as 10/2/2015)Reply239293ReplyIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 9/30/2015)RequestNational Railroad Passenger Corporation
-
(printed as 9/23/2015)Errata239243Errata SheetIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 9/8/2015)Statement239169Opening StatementNational Railroad Passenger Corporation
-
(printed as 9/4/2015)Statement239167Opening StatementCanadian National Railway Company And Grand Trunk Corporation
-
(printed as 7/28/2015)Letter238934LetterIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 7/27/2015)Letter238923LetterNational Railroad Passenger Corporation
-
served (printed as 7/14/2015)DecisionDECISION ADOPTED A PROCEDURAL SCHEDULE IN THIS PROCEEDING.
-
(printed as 7/6/2015)Motion238749Motion/Petition/RequestGrand Trunk Western Railroad Company And Illinois Central Railroad Company
-
(printed as 7/6/2015)Letter238748LetterNational Railroad Passenger Corporation
-
served (printed as 6/4/2015)DecisionDECISION ORDERED THAT THE NATIONAL RAILROAD PASSENGER CORPORATION AND THE GRAND TRUNK RAILWAY COMPANY AND ILLINOIS CENTRAL RAILWAY COMPANY PROVIDE CERTAIN INFORMATION.
-
(printed as 6/4/2015)TranscriptAce-Federal Reporters, Inc.
-
served (printed as 5/20/2015)DecisionDECISION SCHEDULED A DISCOVERY CONFERENCE IN THIS PROCEEDING TO BE HELD ON JUNE 1, 2015, AT 10:00 A.M. IN A HEARING ROOM TO BE DESIGNATED AT THE FEDERAL ENERGY REGULATORY COMMISSION, AND DIRECTED ALL PARTIES TO THE DISCOVERY DISPUTES TO ATTEND.
-
served (printed as 4/30/2015)DecisionDECISION (1) ASSIGNED THIS PROCEEDING TO ADMINISTRATIVE LAW JUDGE JOHN P. DRING FOR HANDLING OF ALL DISCOVERY MATTERS AND INITIAL RESOLUTION OF ALL DISCOVERY DISPUTES; AND (2) EACH PARTY IN THIS PROCEEDING MUST SEND A COPY OF ITS FILINGS TO JUDGE DRING AT THE FEDERAL ENERGY REGULATORY COMMISSION, OFFICE OF ADMINISTRATIVE LAW JUDGES, 888 FIRST STREET, N.E., WASHINGTON, DC 20426.
-
served (printed as 3/26/2015)DecisionDECISION DETERMINED THAT THE PROCEDURAL SCHEDULE SET FORTH IN THE SEPTEMBER 23 DECISION HAS NOT BEGUN BECAUSE DISCOVERY DISPUTES REMAIN OUTSTANDING. THEREFORE, THE BOARD WILL ADDRESS THE PROCEDURAL SCHEDULE IN A FUTURE DECISION.
-
(printed as 3/25/2015)Reply238038ReplyIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 3/23/2015)Reply238019ReplyNational Railroad Passenger Corporation
-
(printed as 3/16/2015)Motion237960Motion To CompelGrand Trunk Western Railroad Company And Illinois Central Railroad Company
-
(printed as 3/13/2015)Letter237938LetterNational Railroad Passenger Corporation
-
(printed as 3/9/2015)Letter237892LetterIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 3/6/2015)Discovery237891DiscoveryNational Railroad Passenger Corporation
-
(printed as 2/10/2015)Report237729Status ReportIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 2/10/2015)Letter237728LetterNational Railroad Passenger Corporation
-
served (printed as 2/3/2015)DecisionDECISION DIRECTED CN AND AMTRAK TO FILE UPDATES AS DESCRIBED, BY FEBRUARY 10, 2015.
-
(printed as 12/10/2014)Reply237199ReplyNational Railroad Passenger Corporation
-
(printed as 12/2/2014)Motion237141Motion To CompelIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
served (printed as 9/23/2014)Decision43855Entire BoardDECISION GRANTED IN PART AN INTERLOCUTORY APPEAL BY ILLINOIS CENTRAL RAILROAD COMPANY AND GRAND TRUNK WESTERN RAILROAD COMPANY (COLLECTIVELY, CANADIAN NATIONAL RAILWAY COMPANY (CN)) OF THE BOARD'S APRIL 15, 2014 DECISION IN THIS PROCEEDING. THIS DECISION ALSO GRANTS IN PART AND DENIES IN PART CN'S SECOND MOTION TO COMPEL AMTRAK TO PRODUCE CERTAIN DOCUMENTS AND RESPOND TO CERTAIN INTERROGATORIES. IN ADDITION, THIS DECISION MODIFIES THE PROCEDURAL SCHEDULE IN THIS PROCEEDING.
-
(printed as 9/23/2014)Reply236720ReplyCanadian National Railway Company
-
(printed as 9/22/2014)Reply236717ReplyNational Railroad Passenger Corporation (Amtrak)
-
(printed as 9/9/2014)RequestIllinois Central Railroad Company And Grand Trunk Western Railroad Company
-
served (printed as 6/20/2014)DecisionDECISION GRANTED A JOINT REQUEST FOR AN EXTENSION OF THE PROCEDURAL SCHEDULE IN THIS PROCEEDING.
-
(printed as 6/17/2014)Motion236199Motion/Petition/RequestIllinois Central Railroad Company, Grand Trunk Western Railroad Company
-
(printed as 5/27/2014)Reply236107ReplyNational Railroad Passenger Corporation
-
(printed as 5/19/2014)Reply236060ReplyIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 5/12/2014)Reply236036ReplyThe National Railroad Passenger Corporation (Amtrak)
-
(printed as 5/9/2014)Reply236027ReplyNational Railroad Passenger Corporation
-
(printed as 5/5/2014)Appeal236002AppealIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
served (printed as 5/2/2014)DecisionDECISION GRANTED A 45-DAY EXTENSION OF THE PROCEDURAL SCHEDULE IN THIS PROCEEDING.
-
(printed as 5/2/2014)Reply235992ReplyIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 4/30/2014)RequestGrand Trunk Western Railroad Company And Illinois Central Railroad Company, National Railroad Passenger Corporation (Amtrak)
-
served (printed as 4/15/2014)DecisionDECISION: (1) GRANTED NORFOLK SOUTHERN RAILWAY COMPANY'S AND CSX TRANSPORTATION'S PETITIONS FOR PARTIAL INTERVENTION; (2) GRANTED CANADIAN NATIONAL RAILWAY COMPANY'S (CN) MOTION TO COMPEL AMTRAK'S RESPONSE TO REQUEST FOR PRODUCTION NO. 5; (3) DENIED CN'S MOTION TO COMPEL AMTRAK'S RESPONSE TO REQUEST FOR PRODUCTION NO. 6.
-
(printed as 2/28/2014)Reply235545ReplyNational Railroad Passenger Corporation
-
(printed as 2/24/2014)Letter235522LetterBnsf Railway Company
-
(printed as 2/24/2014)Reply235521ReplyIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 2/24/2014)Letter235518LetterUnion Pacific Railroad Company
-
(printed as 2/21/2014)Motion235515Petition To InterveneCsx Transportation Inc
-
served (printed as 2/20/2014)DecisionDECISION EXTENDED THE DUE DATE FOR FILING OPENING STATEMENTS IN THIS PROCEEDING UNTIL MAY 29, 2014; AND ADJUSTED OTHER DATES IN THE PROCEDURAL SCHEDULE OF THIS PROCEEDING.
-
(printed as 2/19/2014)Reply235504ReplyNational Railroad Passenger Corporation
-
(printed as 2/19/2014)Motion235503Petition To InterveneNorfolk Southern Railway Company
-
(printed as 2/14/2014)Motion235475Motion/Petition/RequestIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 2/14/2014)Correction235458CorrectionIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
(printed as 2/12/2014)Motion235454Motion To CompelIllinois Central Railroad Company And;Grand Trunk Western Railroad Company
-
served (printed as 1/17/2014)DecisionDECISION GRANTED THE REQUEST FOR AN EXTENSION OF THE PROCEDURAL SCHEDULE, EXCEPT THAT REPLY BRIEFS ARE DUE MAY 27, 2014.
-
(printed as 1/17/2014)Motion235303Motion/Petition/RequestNational Railroad Passenger Corporation And Of Illinois Central Railroad Company And Grand Trunk Western Railroad Company
-
served (printed as 12/19/2013)DecisionDECISION GRANTED A JOINT REQUEST FOR A PROCEDURAL SCHEDULE UNTIL JANUARY 29, 2014.
-
served (printed as 12/16/2013)DecisionDECISION GRANTED A JOINT MOTION FOR A PROTECTIVE ORDER IN THIS PROCEEDING.
-
(printed as 12/13/2013)RequestGrand Trunk Western Railroad Company And Illinois Central Railroad Company, National Railroad Passenger Corporation
-
(printed as 12/6/2013)MotionGrand Trunk Western Railroad Company, Illinois Central Railroad Company, National Railroad Passenger Corporation
-
(printed as 10/24/2013)Comments235006CommentIllinois Central Railroad Company, Grand Trunk Western Railroad Company
-
(printed as 10/24/2013)Misc.235005MiscellaneousIllinois Central Railroad Company, Grand Trunk Western Railroad Company
-
(printed as 10/24/2013)Comments235004CommentNational Railroad Passenger Corporation (Amtrak)
-
served (printed as 8/21/2013)DecisionDECISION ADOPTED AMTRAK'S PROCEDURAL SCHEDULE, BUT DISCOVERY MAY NOT BEGIN UNTIL 60 DAYS AFTER THE SERVICE DATE OF THIS DECISION.
-
(printed as 8/19/2013)Reply234692ReplyIllinois Central Railroad Company, Grand Trunk Western Railroad Company
-
served (printed as 8/9/2013)Decision43257Entire BoardDECISION INSTITUTED A PROCEEDING TO ESTABLISH REASONABLE TERMS AND COMPENSATION FOR THE NATIONAL RAILROAD PASSENGER CORPORATION (AMTRAK) USE OF GRAND TRUNK RAILWAY COMPANY (GTW) AND ILLINOIS CENTRAL RAILWAY COMPANY (IC) FACILITIES AND SERVICES. THIS DECISION ALSO REQUIRES GTW AND IC TO CONTINUE TO PROVIDE AMTRAK FACILITIES AND SERVICES ON AN INTERIM BASIS UNDER THE TERMS OF THEIR EXISTING CONTRACT.
-
(printed as 8/2/2013)Reply234627ReplyNational Railroad Passenger Corporation
-
(printed as 8/1/2013)Reply234616ReplyCanadian National/Illinois Central Railroad Company, Grand Trunk Western Railroad Company
-
(printed as 7/30/2013)Application234604ApplicationNational Railroad Passenger Corporation (Amtrak)
Nothing of that kind in this docket.