Display Kept in this browser only
FD 35087 · CANADIAN NATIONAL RAILWAY COMPANY AND GRAND TRUNK CORPORATION--CONTROL--EJ&E WEST COMPANY

Comment EI-3980

Received or sent (printed as 1/22/2008)

My name is Dr. Chris Pelletiere, MD and this is regards to the proposed purchase of EJ and E Railway by Canadian Pacific in Northern Illinois. With the planned increase traffic on the line, and the fact that the trains will block every major north/south road at the same time for an average time of 6 to 10 minutes, I have grave concerns over the ability to get to our local hospital, Advocate Good Shepherd. No matter which way I travel, I have to cross over those rail lines unless I travel 9 miles out of the way. As a physician who responds to emergency room calls, I have to be readily available to the Hospital. Sitting, waiting for a freight train to pass almost every hour, compounded with the traffic back-ups from the already heavy car and commuter train traffic will severly compromise patient care and emergency response in the area. To allow this to go through would have an enormous, detrimental enviornmental impact on the Barrington/Lake Zurich area, both physically and financially

Submitted by: Christopher Pelletiere · Barrington, Illinois

The Board publishes this comment in its environmental-comment table for this proceeding. It is quoted here as printed; nothing is inferred from it, and it states the commenter's own position in their own words, not this record's.

Permanent address docketyard.org/d/FD-35087/comment/EI-3980 · back to the docket sheet