Display Kept in this browser only
FD 34658 · ALASKA RAILROAD CORPORATION-CONSTRUCTION AND OPERATION EXEMPTION-RAIL LINE BETWEEN NORTH POLE AND DELTA JUNCTION, AK

Comment EI-1800

Received or sent (printed as 12/16/2005)

Summary of Environmental Concerns 1. Destruction of Wetlands 2. Destruction of moose population by train kills 3. Security of train from attacks 4. Destruction of eco-system from spills 5. Theft and destruction of private property 6. Additional loss of state and private lands to US military due to the construction of this route running adjacent to existing military lands.

Submitted by: Robert Thierolf · North Pole, Alaska

The Board publishes this comment in its environmental-comment table for this proceeding. It is quoted here as printed; nothing is inferred from it, and it states the commenter's own position in their own words, not this record's.

The text EI-1800.pdf ↓ Proposed Railroad To Ft.doc ↓

Permanent address docketyard.org/d/FD-34658/comment/EI-1800
File docketyard.org/document/b740a6682fa7f03bbf9a45dd323882877c69e6d819f11df8ab8d99a18d908a89.pdf
File docketyard.org/document/07d21d61e2d6e154378e35df92b86025c75a99d4c2300460c5bdeacf1fd360df.bin · back to the docket sheet